| 1 | 1 | Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | item 1 | 48.6 | Cum. |
|---|
| 2 | 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5\n\n\n\n\n | item 2 | 62.2 | Cum. |
|---|
| 3 | 3 | PROTECTION WORK : | item 3 | | |
|---|
| 4 | 4 | Excavation for Structures:- Excavation in foundation for cross drainage structures, Retaining walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer - in - Charge also including supply of all materials, labour, T&P etc required for proper completion of work. | item 4 | | |
|---|
| 5 | 5 | For R/W and B/W | item 5 | 193.77 | Cum |
|---|
| 6 | 6 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604. | item 6 | | |
|---|
| 7 | 7 | For Ratining wall | item 7 | 60.16 | Cum |
|---|
| 8 | 8 | HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work. | item 8 | | |
|---|
| 9 | 9 | For Ratining wall | item 9 | 21.15 | Cum |
|---|
| 10 | 10 | Providing and fixing of. Edge Stones 12cm x 12cm x 60cm size precast in M15 cement concrete with 4 nos. 8 mm dia HYSD vertical bars and 3 nos 6mm dia MS bar stirrups as per approved drawing including two coat white washing on valley side of formation. | item 10 | 1800 | No |
|---|
| 11 | 11 | Construction of Parapet in R.R. Stone masonry laid in 1:5 C/S mortar providing M-10 grade concrete in foundation and M20 cement concrete in top, plaster in 1:4 C/S mortar & Flush pointing in 1:3 C/S Mortar as required and specified in detailed drawing with white washing complete as per the direction of Engineer-in-chjarge. | item 11 | | |
|---|
| 12 | 12 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604. | item 12 | 4.14 | Cum. |
|---|
| 13 | 13 | Providing and laying of concrete for plain/reinforced concrete in open foundations for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 , 1202 & 1203 for P.C.C grade M 10. | item 13 | 0.52 | Cum. |
|---|
| 14 | 14 | 15 mm thick Plastering with cement mortar 1:4 including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clauses No.613.4. | item 14 | 13.92 | Sqm |
|---|
| 15 | 15 | Pointing with cement mortar 1:3 including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clauses No.613.3 | item 15 | 9.6 | Sqm |
|---|
| 16 | 16 | Providing and laying 25 mm thick P.C.C. Coping Layer 1:2:4 cement concret. | item 16 | 16 | R/m |
|---|
| 17 | 17 | White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 | item 17 | 39.52 | Sqm |
|---|
| 18 | 18 | DRAINAGE WORK | item 18 | | |
|---|
| 19 | 19 | SIDE DRAIN | item 19 | | |
|---|
| 20 | 20 | Construction of Hill side Pucca KC Drain in accordance with the requirement of specification true to line and drades dimensions and other particulars as per Drawing including all material labour T&P etc required for proper completion of the work as directed by Engineer in charge. | item 20 | | |
|---|
| 21 | 21 | Excavatin of foundation as per item no.3 | item 21 | 477.75 | Cum |
|---|
| 22 | 22 | RR stone Masonry 1:5 as per item no.4 | item 22 | 325.65 | Cum |
|---|
| 23 | 23 | Plaster in 1:4 Cement sand mix as per item no. 9('C) | item 23 | 1608.75 | Sqm. |
|---|
| 24 | 24 | CROSS DRAINAGE WORK | item 24 | | |
|---|
| 25 | 25 | SCUPPER | item 25 | | |
|---|
| 26 | 26 | 1000 mm Dia Np3 Hume Pipe | item 26 | | |
|---|
| 27 | 27 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding ofgranular material in single row including fixingcollar withcement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 | item 27 | 15 | R/m |
|---|
| 28 | 28 | Excavation for Structures:- Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD specification clause 305. | item 28 | 51.48 | Cum. |
|---|
| 29 | 29 | Providing and laying of concrete for plain/reinforced concrete in open foundations for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 , 1202 & 1203 for P.C.C grade M 10. | item 29 | 6 | Cum. |
|---|
| 30 | 30 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604. | item 30 | 20.4 | Cum. |
|---|
| 31 | 31 | HP stone filling:- HP stone filling in back of structures including supply of all material, labour, T&P etc. required for proper completion as directed by Engineer-in-charge and MORD specification clause 1604.7. | item 31 | 17.76 | Cum. |
|---|
| 32 | 32 | EARTHAN SHOULDERS SUPER ELEVALATION. | item 32 | | |
|---|
| 33 | 33 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. (Sub grade preparation Pattri filling) | item 33 | 396 | Cum. |
|---|
| 34 | 34 | Dismantling offlexible pavements and disposal ofdismantled materialsupto alead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 | item 34 | 58.5 | Cum. |
|---|
| 35 | 35 | PAVEMENT WORK | item 35 | | |
|---|
| 36 | 36 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical (Using naturally occuring gravelSpecification Clause 408. (Using naturally occuring gravel, Local GSB) | item 36 | 130.99 | Cum |
|---|
| 37 | 37 | WBM Grading 2-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, crushable stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means | item 37 | 62.12 | Cum. |
|---|
| 38 | 38 | WBM Grading 3-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, crushable stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means | item 38 | 592.22 | Cum. |
|---|
| 39 | 39 | Prime Coat-Low porosity :- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. | item 39 | 7780.78 | Sqm. |
|---|
| 40 | 40 | Tack Coat- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | item 40 | 7780.78 | Sqm. |
|---|
| 41 | 41 | Premix Carpet:- 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type Type B as per Technical Specification Clause 508. Bitumen (VG-10) | item 41 | 7780.78 | Sqm. |
|---|
| 42 | 42 | Seal Coat- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Bitumen (VG-10) | item 42 | 7780.78 | Sqm. |
|---|
| 43 | 43 | RIGID PAVEMENT WORK (INTERLOCKING CONCRETE BLOCK PAVEMENT) | item 43 | | |
|---|
| 44 | 44 | Providing and laying of concrete for plain/reinforced concrete in open foundations for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 , 1202 & 1203 for P.C.C grade M 10. ( For base Concrete) | item 44 | 303.75 | Cum |
|---|
| 45 | 45 | Providing and Laying of Interlocking Concrete Block Pavements of M-40 Grade having thickness 80 mm as per drawings and Technical Specification Clause 1504. | item 45 | 4050 | Sqm. |
|---|
| 46 | 46 | Road Furniture | item 46 | | |
|---|
| 47 | 47 | Providing and fixing of kilometer stone as per standard drawing made of precast R:C:C 1:2:4 fixed with C.C 1:3:6 including excavation of pit, painting and printing letters on kilometer stone with two coat of approved synthetic enamel paint of approved . | item 47 | 4 | No |
|---|
| 48 | 48 | Same as above item No. but for Hectometer stone | item 48 | 12 | No |
|---|
| 49 | 49 | Providing and fixing of PMGSY Logo board at end point and every 2 Km, as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 49 | 2 | No |
|---|
| 50 | 50 | Providing and fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 50 | 1 | No |
|---|
| 51 | 51 | Providing and fixing of Citizen information board with PMGSY Logo at at starting and prominent location (where maximum no. of fitizens can view the detail of the road)as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 51 | 1 | No |
|---|
| 52 | 52 | Providing and fixing of Maintenance information board with PMGSY Logo at at starting and prominent location (where maximum no. of fitizens can view the detail of the road)as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge | item 52 | 1 | No. |
|---|
| 53 | 53 | Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD | item 53 | 9 | No. |
|---|
| 54 | 54 | Providing and fixing of semi reflective Direction and Place identification sign boards more then 0.90 sqm as per attached drawing and direction by Engineer in charge | item 54 | 1.1 | Sqm. |
|---|
| 55 | 55 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | item 55 | 500 | Sqm. |
|---|
| 56 | 56 | Maintainance Activities: | item 56 | | |
|---|
| 57 | 57 | Maintenance under PBMC for \n1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. \n2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907.\n3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 .\n4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908.\n5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. \n6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910.\n7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.\n8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year).\n9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191. | item 57 | | |
|---|
| 58 | 58 | Ist Year | item 58 | 3 | KM. |
|---|
| 59 | 59 | Iind Year | item 59 | 3 | KM. |
|---|
| 60 | 60 | IIIrd Year | item 60 | 3 | KM. |
|---|
| 61 | 61 | Ivth Year | item 61 | 3 | KM. |
|---|
| 62 | 62 | Vth Year | item 62 | 3 | KM. |
|---|