Construction Of Culvert From Nuaput Challan Sahi In Balia G . P . Of Jeypore Block Civil Work
Tender Value
2.62 Lakhs
Estimated cost
Bid Submission
18 Dec 2019
0 days left
EMD
3000
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jeypore → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Culvert From Nuaput Challan Sahi In Balia G . P . Of Jeypore Block Civil Work
BOQ
| Name of Work: \"Construction of Culvert from Nuaput Challan Sahi in Balia G.P. of Jeypore Block\" | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | CIVIL WORK | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | Earth work in excavation of foundation in hard soil within 50M initially lead and 1.50M initially lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.03Mtr in depth & levelling bed etc complete as directed by the Engineer-in-Charges. | 27.02 | 100 Cum | |
| 3 | 2 | Providing and laying sand in foundation and plinth filling with Sand in 9” thick layers of approved quality free from dust, dirt and other foreign materials to proper line and grade, watering and ramming etc complete with all lead, lifts de-lifts including labour charges with cost, conveyance, tax and royalty of all materials, labour, T&P and other incidental charges etc complete as per direction of Engineer-in-Charges. | 5.31 | One Cum | |
| 4 | 3 | C.C. of proportion (1:3:6) in foundation and floors using 4cm (3/2”) size Clean hard black hand broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete. - SUB-STRUCTURE | 12.16 | One Cum | |
| 5 | 4 | C.C. of proportion (1:3:6) in foundation and floors using 4cm (3/2”) size Clean hard black hand broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete. - SUPER STRUCTURE | 28.12 | One Cum | |
| 6 | 5 | C.C. of proportion (1:2:4) in foundation and floors using 12mm (1/2”) size Clean hard black crusher broken granite Chips of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete. | 1.03 | One Cum | |
| 7 | 6 | Rigid Smooth Centering and Shuttering for R.C.C.Work including dismantling them after casting including all cost, conveyance, taxes of materials and labour with T&P required for the work etc complete. | 18.42 | One Sqm | |
| 8 | 7 | R.C.C. Work of M-25 grade with 20mm and down grade black hard granite crusher broken chips of 150mm cubes at 28days using minimum quality of cement as per Note 003.5 of IRC – 21 – 1987 and IS – 456 – 1987 with clean crusher broken hard granite chips of 20mm. to 10mm including watering and curing, Centering and Shuttering for R.C.C. Work, Cost, conveyance, tax and royalty of all materials and labour with T&P required for the work etc complete. | 4.69 | One Cum | |
| 9 | 8 | Supplying fitting and placing uncoated HYSD Bar reinforcement complete as per drawing and technical specification and placing in proper position as required for R.C.C. Work including cost, conveyance, taxes of Steel and cost of binding wire 18 to 20 gauge and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges. | 4.69 | One Qntl | |
| 10 | 9 | Earth work in excavation of hard Soil within 50M initially lead and 1.50M initial lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.03Mtr in depth & leveling the bed as directed by the Engineer-in-Charges including cost of Royalty etc complete | 129.6 | 100 Cum |
AI Tender Summary
Tender Timeline
Dec 07, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedDec 18, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 19, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender