Educational and Research Institute Government Departments Closing in 0 days TDR #22778737

Construction Of Compound Wall At Ars, Kampasagar, Nalgonda Dist (Balance Work).

Issued by Government Departments · NALGONDA, Telangana
Tender Value
27.11 Lakhs
Estimated cost
Bid Submission
20 Dec 2019
0 days left
EMD
27200
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
NALGONDA → Telangana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Compound Wall At Ars, Kampasagar, Nalgonda Dist (Balance Work).

BOQ

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Construction of Compound Wall SS 26.00 1Hr 850.00 22100.00
Hire charges for JCB for clearing heavy jungle, jungle, uprooting trees, boulders etc., and levelling the ground including all operational charges etc., complete
2 Construction of Compound Wall SS 2198.00 1Sqm 40.00 87920.00
Providing colour janathacem 2 coats including cost and conveyance of all materials, brushes, scaffolding etc., to site and all labour charges curing etc., complete
3 Construction of Compound Wall SS 125.00 1Sqm 348.00 43500.00
Providing and fixing glass pieces over brick masonry compound wall and fixing in CM 1:4 prop 20mm thick and using cement slurry including cost and conveyance of materials and labour charges etc., complete
4 Construction of Compound Wall SS 6.25 1Cum 4167.00 26044.00
Providing PCC 1:2:4 prop 50mm thick CC coping using 12mm to 20mm size HBG machine crushed metal including cost and conveyance of all material and labour charge, curing etc., complete as directed by the department.
5 Construction of Compound Wall SS 1099.00 1Sqm 98.00 107702.00
Plastering 12mm thick in single coat with CM (1:5) prop including cost and conveyance of all materials like cement, sand, water etc. to site, all operational and incidental charges, cost of seigniorage charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves wherever necessary etc. complete for finished item of work and as directed by the department.
6 Construction of Compound Wall SS 1099.00 1Sqm 147.00 161553.00
Plastering 20mm thick in single coat with CM (1:5) prop including cost and conveyance of all materials like cement, sand, water etc. to site, all operational and incidental charges, cost of seigniorage charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves wherever necessary etc. complete for finished item of work and as directed by the department.
7 Construction of Compound Wall SS 207.00 1Cum 4453.00 921771.00
Brick masonry for panel wall in superstructure with CM 1:8 prop (cement : sand) using second class brick having minimum crushing strength of 40kg/sq.cm including cost and conveyance of all materials like cement, sand, bricks, water to site and cost of seigniorage charges on material including all labour charges, mixing cement mortar, construction, scaffolding charges, lift charges, curing etc. complete for finished item of work and as directed by the department.
8 Construction of Compound Wall SS 7140.36 1Kg 48.18 344023.00
S & F HYSD Tor Steel bars Fe-500 grade as per IS 1786-1979 for all RCC works including cost and conveyance of steel to site including labour charges for futting rods of different diameters and sizes bending rods, placing grills in position with cover blocks tying grills with binding wire including cost of all operational and incidental charges, including cost of MS binding wire, labour charges, lift charges, including cost of MS binding wire, labour charges, lift charges etc. complete for finished item of work and as directed by the department.
9 Construction of Compound Wall SS 25.34 1Cum 8590.00 217671.00
c) Plinth Beams: Vibrated Reinforced Cement Concrete corresponding to M-20 grade as per IS 456 equivalent to (1: 1 1/2 : 3) prop for using 6mm to 20mm size SS5 graded machine crushed hard granite metal including cost and conveyance of all materials like cement, fine and coarse aggregate,etc. to site and including cost of seigniorage charges, machine mixing, all centering charges, laying concrete, vibrating, lift charges, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by the department.
10 Construction of Compound Wall SS 26.56 1Cum 8548.00 227035.00
b) Columns: Vibrated Reinforced Cement Concrete corresponding to M-20 grade as per IS 456 equivalent to (1: 1 1/2 : 3) prop for using 6mm to 20mm size SS5 graded machine crushed hard granite metal including cost and conveyance of all materials like cement, fine and coarse aggregate,etc. to site and including cost of seigniorage charges, machine mixing, all centering charges, laying concrete, vibrating, lift charges, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by the department.
11 Construction of Compound Wall SS 34.59 1Cum 6783.00 234624.00
a) Footings: Vibrated Reinforced Cement Concrete corresponding to M-20 grade as per IS 456 equivalent to (1: 1 1/2 : 3) prop for using 6mm to 20mm size SS5 graded machine crushed hard granite metal including cost and conveyance of all materials like cement, fine and coarse aggregate,etc. to site and including cost of seigniorage charges, machine mixing, all centering charges, laying concrete, vibrating, lift charges, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by the department.
12 Construction of Compound Wall SS 29.54 1Cum 3059.00 90363.00
Plain Cement Concrete (1:4:8) proportion ( Cement : fine aggregate : coarse aggregate) for foundations and under flooring bed using 40mm size SS5 hard granite metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc, to site, cost of seigniorage charges on all materials and labour charges for machine mixing, laying concrete in foundations, ramming in 15cm layer finishing top surface to the required level curing etc., complete for finished item of work.
13 Construction of Compound Wall SS 386.60 1Cum 31.00 11985.00
Filling with useful available excavated earth ( excluding rock) in trenches, sides of foundations and basement with initial lead in layers bnot exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., for finished item of work.
14 Construction of Compound Wall SS 89.00 1Cum 958.00 85262.00
Filling the foundation with carted sand from approved quarry and filling in layers of 150mm thick including watering, tamping, levelling etc., complete as directed by the department
15 Construction of Compound Wall SS 406.52 1Cum 319.00 129680.00
Earth work excavation for foundation of building and depositing the earth on bank with all leads and lifts in all types of soil like mixture of gravel & disintegrated rock like shale\s, ordinary gravel stoney earth and earth mixed with fair sized stoney boulders including shorting, strutting, dewatering etc., complete for finished item of work.

AI Tender Summary

OUR REF NO 22778737
AUTHORITY Government Departments
TENDER VALUE 27.11 Lakhs
LAST DATE 20-12-2019
Authority
Authority Name Professor Jayshankar Telangana State Agricultural University
Work Description Construction Of Compound Wall At Ars, Kampasagar, Nalgonda Dist (Balance Work).
Basic Detail
Tender No 11-4/PJTSAU/EO/TA/2019-20
Bidding Type Tender
Location
City NALGONDA
State Telangana
Key Dates
Publish Date 06 Dec 2019
Submission Date 20 Dec 2019
Open Date 01 Jan 0001
Finance
Tender Value 27.11 Lakhs
Tender Fee Ref. Documents
EMD 27200
Exemption Not Available
Document List
e463063b-378e-4618-b126-5fa7e243b416.html
CW ARS Kampasagar (BW).zip

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 06, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 20, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed

Tender Documents

Download All (ZIP) ↓
html

e463063b-378e-4618-b126-5fa7e243b416.html

zip

CW ARS Kampasagar (BW).zip

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders