Construction Of Material Recovery Facility And Compound Wall At Barpali . Cluster-I
Tender Value
13.23 Lakhs
Estimated cost
Bid Submission
12 Dec 2019
0 days left
EMD
13234
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Barpali → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Material Recovery Facility And Compound Wall At Barpali . Cluster-I
BOQ
| Name of Work:Construction of Material Recovery Facility & Compound wall at Barpali. (Cluster-I) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supplying all T &P, labour for earth work in excavation of foundation in hard soil within 50mt initial lead and 1.5mt lift including rough dressing and breaking clods tomaximum 5cm to 7cm and laying in layers not exceding 0.3mt in depth as per PWD Speicification & direction of the Engineer-in-Charge. | BI01010001010000000000000515BI0100001118 | 37.93 | CUM |
| 2 | 2 | Supplying all T &P, labour for Filling sand in F&P with well watered and rammed including cost,Conveyances,royalty of sand & all taxes etc complete as per PWD Speicification & direction of the engineer in charge. | BI01010001010000000000000515BI0100001119 | 43.26 | CUM |
| 3 | 3 | Supplying all T &P, labour for C.C (1:4:8) by using 4cm size H.G. metal (Crusher broken) including Laying,Compacting, curing with all cost, conveyances, royalties & taxes etc complete as per PWD Speicification & direction of the Engineer-in-Charge. | BI01010001010000000000000515BI0100001120 | 11.7 | CUM |
| 4 | 4 | Supplying all T &P, labour for Brick work with cement mortar (1:6) in F & P by using Fly ash Brick of 23cmx11cmx8cm having crusing strength no less than 75kg/cm2 with dimentional tolerance +- 2% cost,conveyances, taxes etc. complete as per PWD Speicification & direction of the Engineer-in-Charge. | BI01010001010000000000000515BI0100001121 | 19.01 | CUM |
| 5 | 5 | RCC M20 using 20mm down draded black granite crusher broken chips including hoisting and laying including all cost,cinveyance and taxes etc. complete as per direction of EIC. | BI01010001010000000000000515BI0100001124 | ||
| 6 | 5.01 | Col. Base | BI01010001010000000000000515BI0100001125 | 4.49 | CUM |
| 7 | 5.02 | Plinth beam | BI01010001010000000000000515BI0100001126 | 3.8 | CUM |
| 8 | 5.03 | Coloumn in S/S | BI01010001010000000000000515BI0100001127 | 2.76 | CUM |
| 9 | 6 | Supplying, laying including cutting , bending and binding of uncoated HYSD bar for RCC work with all cost, conveyance & taxes etc. complete as per PWD Specification & direction of EIC. | BI01010001010000000000000515BI0100001128 | 9.46 | Qntl |
| 10 | 7 | Brick work with cement mortar (1:6) by using Fly ash Brick of 23cmx11cmx8cm having crusing strength no less than 75kg/cm2 with dimentional tolerance +- 2% cost,conveyances, taxes etc. complete as per PWD Speicification & direction of the Engineer-in-Charge. | 35.22 | CUM | |
| 11 | 8 | Supplying of Fitting fixing of MS Angle for purlin including all cost,conveyance, taxes etc complete as per direction of EIC. | 6.38 | Qntl | |
| 12 | 9 | Supplying, fitting & fixing Colour coated Durashine Roofing sheet of size 0.45mm (TCT)X 1072mm in roof including cost of sheet & all charges e.t.c. all complete. | 110.65 | Sqm | |
| 13 | 10 | 16mm thick smooth plastering with cement motor(1:6) including all cost,conveyance and royality etc complete as per PWD Speicification & direction of the Engineer-in-Charge. | 15 | Sqm | |
| 14 | 11 | 12mm thick smooth plastering with cement motor(1:6) including all cost,conveyance and royality etc complete as per PWD Speicification & direction of the Engineer-in-Charge. | 342.59 | Sqm | |
| 15 | 12 | White washing 3 coat with shell lime to wall surface with cost conveyance,taxes etc complete as per direction of EIC. | 71.26 | Sqm | |
| 16 | 13 | Finishing wall with 2 coats with weather coat of approved shade over primer on new work to give an even shade including cost of weather coat etc complete. | 133.06 | Sqm | |
| 17 | 14 | Add for Sign. Board, Photocopies etc. | 1 | Nos | |
| 18 | 15 | Earth work in excavation of foundation in hard soil including dressing and leveling etc. all complete. | 124.22 | CUM | |
| 19 | 16 | Supplying filling in foundation and plinth with sand including watering ramming etc all complete. | 18.14 | CUM | |
| 20 | 17 | ment concrete of proportion (1:3:6) in foundation and floors using 4cm (1 ½”) size clean hard black crusher broken granite stone metal etc. all complete. | 18.14 | CUM | |
| 21 | 18 | Flyash brick masonry in cement mortar (1:6) in foundation & plinth including cost of all charges etc. all complete. | 26.39 | CUM | |
| 22 | 19 | R.C.C. (1:1.5:3) in the following works using 20mm & down graded size CBHG chips including cost of all charges etc. all complete. | |||
| 23 | 19.01 | Column Base | 11.26 | CUM | |
| 24 | 19.02 | Plinth Beam | 4.76 | CUM | |
| 25 | 19.03 | Column In Superstructure | 4.81 | CUM | |
| 26 | 20 | Supplying,fitting,fixing,cutting, tying , bending & binding the rod & grills & placed in proper position as per drawing including cost of all charges etc. all complete. | 19.18 | Qntl | |
| 27 | 21 | Flyash brick masonry in cement mortar (1:6) in super structure including cost of all charges etc. all complete. | 34.99 | CUM | |
| 28 | 22 | Providing 12mm thick Cement Plaster (1:6) over brick works including cost of all charges e.t.c. all complete. | 227.54 | Sqm | |
| 29 | 23 | Providing 16mm thick Cement Plaster (1:6) over brick works including cost of all charges e.t.c. all complete. | 254.31 | Sqm | |
| 30 | 24 | Painting two coats with any approved shade & quality weather seal coat paint to wall surface over a coat of cement primer including cost of all charges etc. all complete. | 481.85 | Sqm | |
| 31 | 25 | Supplying & fitting display board with photography with all materials including cost of all labour charges etc. all complete. | BI01010001010000000000000515BI0100001129 | 1 | Nos |
AI Tender Summary
Tender Timeline
Dec 05, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedDec 12, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 13, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender