Improvement Of Power Factor By Installation Of Ht Capacitor In Static Panel At Rwph Bawana
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Dec 2019
0 days left
EMD
14200
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Nangloi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Improvement Of Power Factor By Installation Of Ht Capacitor In Static Panel At Rwph Bawana
BOQ
| Name of Work: Improvement of power factor by installation of HT capacitor in static panel at RWPH Bawana. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1.01 | Checking of capacitors and dismantling of old damaged components capacitors, fuses from the existing structure including dismantling of terminations etc. as required at site | item1 | 5 | Jobs |
| 2 | 1.02 | Supply of 125 KVAr, 3.6 KV , 3 ph., 50 Hz, capacitor unit suitable for 330 KW motor , complete with terminal cover , mounting structure , bus bar links , post insulations and cable end box etc. duly painted as required at site -Make Standard | item2 | 4 | Nos. |
| 3 | 1.03 | Supply of 150 KVAr , 3.6 kV , 3 ph., 50 Hz, capacitor unit for no load reactive power compensation of 2500 KVA transformer , complete with terminal cover mounting structure , bus bar links , post insulations and cable end box etc. duly painted as required at site -Make Standard | item3 | 1 | No. |
| 4 | 1.04 | Supply of 100A, 3.3 KV HRC fuses along with mounting clamps /links as required at site- Make Eswari-Anand | item4 | 15 | Nos. |
| 5 | 1.05 | Installation of all components mentioned above using necessary hardware , including termination with existing cables, glands , lugs, tapes etc. as required at site | item5 | 5 | Jobs |
| 6 | 1.06 | Testing &commissioning of complete capacitor installation including following: 1. Meggering of complete capacitor installation using 5000V megger.\n2. Continuity test for checking continuity of all circuits.\n3. Checking earthing of capacitor banks.\n4. Charging of capacitor banks.\n5. Monitoring of power factor at least 0.98 all the time. \n | item6 | 1 | Job |
AI Tender Summary
Tender Timeline
Dec 05, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedDec 16, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 16, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender