Panchayat Raj Engineering Department has published Quotations For Supply And Fixing Of Centralized Air Condition At Zp Meeting At Sangareddy. Submission Date for this Tender is 09-12-2019. Air Conditioner Tenders in Telangana. Bidders can get complete Tender details and download the document.
Item ID | Item Code | Item Name | Item Description | Agree NIT Quantity | UOM | Item Specification | Quantity | Part Number | Action |
---|---|---|---|---|---|---|---|---|---|
181630 | ZP SRD -AC - 001 | Supply of Equipment Ductable units11.0 TR capacity Ductble UNIT 4400CFM | 11.0 TR capacity Ductble UNIT 4400CFM, with Factory charged R22 refrigerant, and factory fitted Voltage scanner, MCB, Safety Valve and P2 capacitor. Scroll Compressor and Copper condenser.. Model number 40LC012S | Yes | nos | 11.0 TR capacity Ductble UNIT 4400CFM, with Factory charged R22 refrigerant, and factory fitted Voltage scanner, MCB, Safety Valve and P2 capacitor. Scroll Compressor and Copper condenser.. Model number 40LC012S | 1.00 | None | |
181631 | ZP SRD -AC - 002 | Supply of Equipment Ductable units 8.5 TR capacity Ductble UNIT 3400CFM | 8.5 TR capacity Ductble UNIT 3400CFM, with Factory charged R22 refrigerant, and factory fitted Voltage scanner, MCB, Safety Valve and P2 capacitor. Scroll Compressor and Copper Condenser. Model Number 40LC010DR | Yes | nos | 8.5 TR capacity Ductble UNIT 3400CFM, with Factory charged R22 refrigerant, and factory fitted Voltage scanner, MCB, Safety Valve and P2 capacitor. Scroll Compressor and Copper Condenser. Model Number 40LC010DR | 3.00 | None | |
181632 | ZP SRD -AC - 003 | Supply of Equipment Ductable units 4.0 TR Cassette unit 1070 CFM | 4.0 TR Cassette unit 1070 CFM, Refrigerant R22 Charged, with 3-Phase reverse protection and scroll compressor, Copper Condenser. | Yes | nos | 4.0 TR Cassette unit 1070 CFM, Refrigerant R22 Charged, with 3-Phase reverse protection and scroll compressor, Copper Condenser. | 5.00 | None | |
181633 | ZP SRD -AC - 004 | Supply of Equipment Ductable units 2.0 Split Unit fixed speed 5 star | 2.0 Split Unit fixed speed 5 star, With Copper Condenser. | Yes | nos | 2.0 Split Unit fixed speed 5 star, With Copper Condenser. | 2.00 | None | |
181634 | ZP SRD -AC - 005 | GAS -R22 (Pre-Charged Refrigerant Volume) | GAS -R22 (Pre-Charged Refrigerant Volume) | Yes | Kg | GAS -R22 (Pre-Charged Refrigerant Volume) | 31.00 | None | |
181635 | ZP SRD -AC - 006 | Voltage Scanner | Voltage Scanner | Yes | nos | Voltage Scanner | 4.00 | None | |
181636 | ZP SRD -AC - 007 | MCB | MCB | Yes | nos | MCB | 4.00 | None | |
181637 | ZP SRD -AC - 008 | Safety Valve (Service Valve) | Safety Valve (Service Valve) | Yes | nos | Safety Valve (Service Valve) | 4.00 | None | |
181638 | ZP SRD -AC - 009 | P2 Capacitors(Protection against Fire and Electrical Shock Hazards) | P2 Capacitors(Protection against Fire and Electrical Shock Hazards) | Yes | nos | P2 Capacitors(Protection against Fire and Electrical Shock Hazards) | 4.00 | None | |
181639 | ZP SRD -AC - 010 | LOW SIDE WORKS 11.0 TR capacity Ductble UNIT | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 11.0 TR capacity Ductble UNIT | Yes | nos | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 11.0 TR capacity Ductble UNIT | 1.00 | None | |
181640 | ZP SRD -AC - 011 | LOW SIDE WORKS 8.0 TR capacity Ductble UNIT | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 8.5 TR capacity Ductble UNIT | Yes | nos | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 8.5 TR capacity Ductble UNIT | 3.00 | None | |
181641 | ZP SRD -AC - 012 | LOW SIDE WORKS 4.0 TR Cassette unit | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 4.0 TR Cassette unit | Yes | nos | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 4.0 TR Cassette unit | 5.00 | None | |
181642 | ZP SRD -AC - 013 | LOW SIDE WORKS 2.0 Split Unit | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 2.0 Split Unit | Yes | nos | Installation , Testing and Commissioning of Ductable indoor and Outdoor units as per standards 2.0 Split Unit | 2.00 | None | |
181643 | ZP SRD -AC - 014 | Supply and installation of suction and discharge 11.0 TR capacity Ductble UNIT | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 11.0 TR capacity Ductble UNIT | Yes | Rmt | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 11.0 TR capacity Ductble UNIT | 12.00 | None | |
181644 | ZP SRD -AC - 015 | Supply and installation of suction and discharge8.5 TR capacity Ductble UNIT | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 8.5 TR capacity Ductble UNIT | Yes | Rmt | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 8.5 TR capacity Ductble UNIT | 70.00 | None | |
181645 | ZP SRD -AC - 016 | Supply and installation of suction and discharge 4.0 TR Cassette unit | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 4.0 TR Cassette unit | Yes | Rmt | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 4.0 TR Cassette unit | 125.00 | None | |
181646 | ZP SRD -AC - 017 | Supply and installation of suction and discharge 2.0 Split Unit | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 2.0 Split Unit | Yes | Rmt | Supply and installation of suction and discharge for Ductable Hard copper/Cassette and split soft copper Refrigerant piping with proper supports/hangers from ceiling/wall as required at site and approved by consultant and duly insulated with closed cell elastomeric nitrile insulation of 19mm thick for pipes above 1 inch and 13 mm thick for pipes below as per standard specifications as 2.0 Split Unit | 25.00 | None | |
181647 | ZP SRD -AC - 018 | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 11.0 TR capacity Ductble UNIT | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 11.0 TR capacity Ductble UNIT | Yes | Rmt | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 11.0 TR capacity Ductble UNIT | 15.00 | None | |
181648 | ZP SRD -AC - 019 | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 8.5 TR capacity Ductble UNIT | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 8.5 TR capacity Ductble UNIT | Yes | Rmt | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 8.5 TR capacity Ductble UNIT | 80.00 | None | |
181649 | ZP SRD -AC - 020 | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 4.0 TR Cassette unit | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 4.0 TR Cassette unit | Yes | Rmt | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 4.0 TR Cassette unit | 135.00 | None | |
181650 | ZP SRD -AC - 021 | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 2.0 Split Unit | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 2.0 Split Unit | Yes | Rmt | Supply, installation, testing and commissioning of electrical cabling between condenser and evaporator set of lines laying pvc conduits as per company standards 2.0 Split Unit | 30.00 | None | |
181651 | ZP SRD -AC - 022 | Supply, installation, testing and Commissioning of following sizes insulated PVC drain pipes with 25 mm | Supply, installation, testing and Commissioning of following sizes insulated PVC drain pipes with 25 mm | Yes | Rmt | Supply, installation, testing and Commissioning of following sizes insulated PVC drain pipes with 25 mm | 40.00 | None | |
181652 | ZP SRD -AC - 023 | Supply, installation, testing and Commissioning of following sizes insulated PVC drain pipes with 32 mm thick | Supply, installation, testing and Commissioning of following sizes insulated PVC drain pipes with 32 mm thick | Yes | Rmt | Supply, installation, testing and Commissioning of following sizes insulated PVC drain pipes with 32 mm thick | 25.00 | None | |
181653 | ZP SRD -AC - 024 | Supply, installation, testing and Commissioning of Additional Initial Charge of Refrigerant gas and oil | Supply, installation, testing and Commissioning of Additional Initial Charge of Refrigerant gas and oil | Yes | TR | Supply, installation, testing and Commissioning of Additional Initial Charge of Refrigerant gas and oil | 60.00 | None | |
181654 | ZP SRD -AC - 025 | Supply and fixing of Factory Fabricated/Handmade G.S.S. Rectangular ducting complete with all accessories viz. anchor fastener, black painted M. S. angle / rod supporting, Expanded Polyethylene gasket galvanized hardware, etc complete as per specs. 24 Gauge 120 gsm | Supply and fixing of Factory Fabricated/Handmade G.S.S. Rectangular ducting complete with all accessories viz. anchor fastener, black painted M. S. angle / rod supporting, Expanded Polyethylene gasket galvanized hardware, etc complete as per specs. 24 Gauge 120 gsm | Yes | Sqm | Supply and fixing of Factory Fabricated/Handmade G.S.S. Rectangular ducting complete with all accessories viz. anchor fastener, black painted M. S. angle / rod supporting, Expanded Polyethylene gasket galvanized hardware, etc complete as per specs. 24 Gauge 120 gsm | 75.00 | None | |
181655 | ZP SRD -AC - 026 | Supply and Fixing of acoustic insulation of duct with 12 mm thick. Rigid fiber glass of 48 kg./cum density. Fiber glass shall be covered with RP tissue and 26 G al. perforated sheet. 6 mm bolt and nuts are to be fixed at interval of 300 mm. | Supply and Fixing of acoustic insulation of duct with 12 mm thick. Rigid fiber glass of 48 kg./cum density. Fiber glass shall be covered with RP tissue and 26 G al. perforated sheet. 6 mm bolt and nuts are to be fixed at interval of 300 mm. | Yes | Sqm | Supply and Fixing of acoustic insulation of duct with 12 mm thick. Rigid fiber glass of 48 kg./cum density. Fiber glass shall be covered with RP tissue and 26 G al. perforated sheet. 6 mm bolt and nuts are to be fixed at interval of 300 mm. | 50.00 | None | |
181656 | ZP SRD -AC - 027 | Supply and Fixing of closed cell thermal insulation of duct with 13 mm thick. Nitrile Rubber as per standard practice | Supply and Fixing of closed cell thermal insulation of duct with 13 mm thick. Nitrile Rubber as per standard practice | Yes | Sqm | Supply and Fixing of closed cell thermal insulation of duct with 13 mm thick. Nitrile Rubber as per standard practice | 25.00 | None | |
181657 | ZP SRD -AC - 028 | Supply, installation, testing and Commissioning of Canvas Connection | Supply, installation, testing and Commissioning of Canvas Connection | Yes | nos | Supply, installation, testing and Commissioning of Canvas Connection | 4.00 | None | |
181658 | ZP SRD -AC - 029 | Supply and Fixing of Al powder coated extruded return air Grills/diffusers as per Architect suggested color to suit gypsum / grid false ceiling without damper | Supply and Fixing of Al powder coated extruded return air Grills/diffusers as per Architect suggested color to suit gypsum / grid false ceiling without damper | Yes | Sqm | Supply and Fixing of Al powder coated extruded return air Grills/diffusers as per Architect suggested color to suit gypsum / grid false ceiling without damper | 4.00 | None | |
181659 | ZP SRD -AC - 030 | Supply, installation, testing and Commissioning of Jet Diffusers 12 inch dia | Supply, installation, testing and Commissioning of Jet Diffusers 12 inch dia | Yes | nos | Supply, installation, testing and Commissioning of Jet Diffusers 12 inch dia | 18.00 | None | |
181660 | ZP SRD -AC - 031 | Supply, installation, testing and commissioning of Ms stands for condensing unit 11.0 TR capacity Ductble UNIT | Supply, installation, testing and commissioning of Ms stands for condensing unit 11.0 TR capacity Ductble UNIT | Yes | nos | Supply, installation, testing and commissioning of Ms stands for condensing unit 11.0 TR capacity Ductble UNIT | 1.00 | None | |
181661 | ZP SRD -AC - 032 | Supply, installation, testing and commissioning of Ms stands for condensing unit 8.5 TR capacity Ductble UNIT | Supply, installation, testing and commissioning of Ms stands for condensing unit 8.5 TR capacity Ductble UNIT | Yes | nos | Supply, installation, testing and commissioning of Ms stands for condensing unit 8.5 TR capacity Ductble UNIT | 3.00 | None | |
181662 | ZP SRD -AC - 033 | Supply, installation, testing and commissioning of Ms stands for condensing unit 4.0 TR Cassette unit | Supply, installation, testing and commissioning of Ms stands for condensing unit 4.0 TR Cassette unit | Yes | nos | Supply, installation, testing and commissioning of Ms stands for condensing unit 4.0 TR Cassette unit | 5.00 | None | |
181663 | ZP SRD -AC - 034 | Supply, installation, testing and commissioning of Ms stands for condensing unit 2.0 Split Unit | Supply, installation, testing and commissioning of Ms stands for condensing unit 2.0 Split Unit | Yes | nos | Supply, installation, testing and commissioning of Ms stands for condensing unit 2.0 Split Unit | 2.00 | None |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail