Tourism Government Departments Closing in 0 days TDR #22705758

Work To Be Executed At Neugal Cafe At Palampur Sub Head Up Gradation Of Neugal Cafe At Palampur Distt . Kangra H . P

Issued by Government Departments · Cafe Neugal Palampur, Himachal Pradesh
Tender Value
8.26 Lakhs
Estimated cost
Bid Submission
20 Dec 2019
0 days left
EMD
17000
Bank guarantee accepted
Document Fee
1200
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Cafe Neugal Palampur → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Work To Be Executed At Neugal Cafe At Palampur Sub Head Up Gradation Of Neugal Cafe At Palampur Distt . Kangra H . P

BOQ

Name of Work:Work to be executed at Neugal Café Palampur Under Circuit JoginderNagar-Bir Billing 2008-09 and Installation of High Mast light. Sub Head : Up gradation of Café Neugal at Palampur Distt. Kangra (H.P.)
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies for all height of propping and centering below supporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work including carriage of materials in all leads and lifts in Flat surfaces such as soffits and suspended floor, roofs landing and like plain upto 200 mm in thickness.BI01010001010000000000000515BI01000011132.66Per Square metre.
22Providing and laying cement concrete 1:1.5:3 (1cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work including carriage of materials in all leads, lifts and upto all heights in Suspended floors, roofs, landings, shelves and their supports balconies beams, girders bressumers and cantilevers.BI01010001010000000000000515BI01000011140.27Per Cubic metre.
33Providing mild steel/tor steel reinforcement for RCC work including bending, binding also cost of binding wire and placing in position complete upto all floor level including carriage of materials in all lead and lifts. a) Tor steelBI01010001010000000000000515BI010000111531.15Per Kilograme
44Brick work 2nd class using common burnt clay building bricks in superstructure above plinths level in cement mortar 1:6 (1cement:6sand) including carriage of materials in all leads, lifts and upto all heights.BI01010001010000000000000515BI01000011160.36Per Cubic metre.
55Half brick masonry in common burnt clay building bricks 2nd class in superstructure in cement mortar 1:4 (1cement:4sand) including carriage of materials in all leads, lifts and upto all heights.BI01010001010000000000000515BI01000011173.36Per Square metre
66Providing wood work in frames of doors, windows and other frames wrought framed and fixed in position in Ist class deodar wood including carriage of materials in all lead, lifts and upto all heights.BI01010001010000000000000515BI01000011180.075Per Cubic metre.
77Providing and fixing 35 mm thick, Ist class deodar wood panelled glazed or paneled and glazed shutters for doors windows and clerestory windows including black enameled iron butt hinges with necessary screws including carriage of materials in all leads, lifts and upto all height .BI01010001010000000000000515BI01000011191.575Per Square metre.
88Providing and fixing 6mm thick commercial ply wood of Century/ Green ply / Merino or equivalent make ceiling of approved quality with butt jointing and nails (frame work and cover fillets to be paid for separately) including carriage of materials within all lead, lift and height.BI01010001010000000000000515BI010000112024.61Per Square metre.
99Providing wood work in frames of false celling partitions etc. sawn and put-up in position in 1st class Sal wood including carriage of materials in all leads, lifts and upto all height .BI01010001010000000000000515BI01000011210.985Per Cubic Mtere
1010Providing and fixing 12mm thick water proof kit ply/Green/ Merino make of standard quality ISI mark and approved shade and colour in panelling & wall linning i/c mitring at junctions, butt jointing and nails complete (Frame work for base to be measured & paid for separately) Engineer in Charge within all leads and liffts.BI01010001010000000000000515BI0100001122127.92Per Square Metre.
1111Providing and fixing 20 mm thick plain lining with tongued and groved jointing and screws (frame work and cover fillets to be measured and paid for separately with 1st class deodar wood including carriage of materials in all leads, lifts and upto all height .BI01010001010000000000000515BI0100001123152.53Per Square Metre.
1212Providing and fixing 63x63 mm 1st class teak wood cornics fixed with nails and screws complete including carriage of material in all leads and lifts.BI01010001010000000000000515BI0100001124154.32per Running Metre
1313Providing and fixing 10mm thick anti skid water proof stain and impect resistent heavy duty vetrified tiles Nitco / Rak/ Kazaria 600x600mmx10mm manufactured of approved shade and colour in flooring, treads of steps and landings laid over 12mm thick cement mortar 1:3 (1 cement : 3 sand) jointed with cement slurry mixed with pigment to match the shade of tiles as required complete including carriage of materials in all lead and lifts.(Basic Rate of Tile not less than Rs. 55/- per Square feet. )BI01010001010000000000000515BI010000112529.13Per Square Metre.
1414Providing and laying granite stone flooring 20 mm average thickness over a base of 20 mm thick cement mortar 1:3 (1cement:3sand) laid over and jointed with grey cement slurry mixed with pigment to match shade of the granite stone including rubbing & polishing to granite polishing etc. complete including carriage of materials in all lead & lift. Finish gray/red (basic rate not less than Rs.220/- per Sq.ft.BI01010001010000000000000515BI01000011262.66Per Square metre.
1515Providing and fixing 6 to 8mm thick200mmx300mm coloured glazed tiles Nitco /RAK make in flooring treads of steps and landing laid on a bed of 12 mm thick cement mortar 1:3 (1cement:3sand) finished with flush Pointing in white cement pigment to match the shade of tiles upto floor two level and above including all leads lifts and carriage of materials.Nitco/Kajaria/ RAK make (Basic rate not less than Rs.40/- per Sqft.)BI01010001010000000000000515BI010000112724.58Per Square metre.
1616Steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of red lead paint including carriage of materials in all lead lifts and heights. In gratings framed guard bars ladders, railings brackets and similar worksBI01010001010000000000000515BI01000011282Per Quintal
171715mm Cement plaster in single coat on the rough side of brick/ concrete /stone walls for interior plastering upto floor two level including arrises ,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth including carriage of materials in all leads, lifts and upto all heights.in Cement mortar 1:5 (1 Cement:5 Sand)BI01010001010000000000000515BI010000112915.53Per Square Metre.
181820 mm cement plaster in single coat on rough side of brick/stone masonry for interior plastering including arises, internal rounded angles, chamfers and/or rounded angles not exceeding 80 mm in girth and finishing even and smooth in cement Mortar 1:5 (1cement : 5sand) including carriage of materials in all leads, lifts & height.BI01010001010000000000000515BI010000113015.53Per Square metre.
1919Distempering (one coat)with oil bound washable distemper of approved brand and manufacture and of required shade on decorated wall surface to give an even shade after thoroughly brushing the surface clean of all grease dirt loose pieces of scales and also including preparing the surface even and sand papered smooth including carriage of materials in all lead and lifts and heights.BI01010001010000000000000515BI0100001131495.27Per Square metre.
2020Extra for sub sequesnt coat of Distempering (one coat)with oil bound washable distemper of approved brand and manufacture and of required shade including carriage of materials in all lead and lifts and heights.BI01010001010000000000000515BI0100001132495.27Per Square metre.
2121Extra for sub sequesnt coat of Distempering (one coat)with oil bound washable distemper of approved brand and manufacture and of required shade including carriage of materials in all lead and lifts and heights.BI01010001010000000000000515BI0100001133108.87Per Square metre.
2222Finishing wall with weather proof exterior grade emulsion of Asian/Apex or Neola make and color on undecorated wall surface two or more coats to give an even shade and final finish after thoroughly cleaning of the surface of all dust dirt droppings and other foreign matter.( applying Birla putty to be paid separately) including carriage of materials in all lead, lifts and height.BI01010001010000000000000515BI0100001134472.93Per Square meter.
2323Painting two or more coats on G.I. sheets with ready mix paint of approved brand and manufacture on new work to give an even shade including carriage of materials in all lead , lifts and heightsBI01010001010000000000000515BI0100001135384.85Per Square metre.
2424Painting one coat(excluding priming coat)on previously painted wood and wood based surfaces with enamel paint to given and even shade including cleaning of all dirt,dust and other foreign matter sand papering and stopping with enamal paint other than white including carriage of materials in all leads, lifts and height.BI01010001010000000000000515BI0100001136255.41Per Square metre.
2525Extra for sub sequesnt coat of coat(excluding priming coat)on previously painted wood and wood based surfaces with enamel paint including carriage of materials in all leads, lifts and height.BI01010001010000000000000515BI0100001137255.41Per Square metre.
2626Polishing two coats with melamine polish of required shade on new wood and wood based surfaces to give an even surface including cleaning the surface of all dirt, dust and sand papered smooth and including a coat of wood filler.r including carriage of materials in all lead, lifts & heights.BI01010001010000000000000515BI0100001138293.78Per Square metre.
2727Applying priming coat over new steel and other metal surfaces after and including preparing the surface by thoroughly cleaning oil grease dirt and other foreign matters and scoured with wire brushes fine steel wood scrapers and sand paper complete With ready mixed priming paint brushing red lead, red, oxide/zinc oxide chrome including carriage of materials in all lead , lifts and heights.BI01010001010000000000000515BI0100001139384.85Per Square metre.
2828Applying modrent solution on new G.I sheet for preparation of surface for painting @ 5 litres/100 sqm.of surface and rubbing the solution with brush including thoroughly cleaning the surface of all oil grease dirt and other foreign matter including carriage of materials in all lead , lifts and heights.BI01010001010000000000000515BI0100001140384.85Per Square metre.
2929Painting one coat (excluding priming coat) on previously painted steel and othermetal surfaces with enamel paint brushing to give an even shade including cleaning the surface of all dirt,dust and other foreign matter with enamel with white paint including carriage of materials in all lead , lifts and heights a) With White PaintBI01010001010000000000000515BI0100001141122.1Per Square metre.
3030b) Other than white whiteBI01010001010000000000000515BI0100001142122.1Per Square metre.
3131Applying priming coat of standard brand/quality over new wood and wood based surfaces after and including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matters sand, papering and knotting including carriage of materials in all lead and lifts.: With Ready mixed pink primerBI01010001010000000000000515BI01000011437.83Per Square metre.
3232Painting two coats of standard make and quality (excluding priming coat) on new wood and wood based surfaces, with enamel paint, brushing to give an even shade including cleaning of all dirt, dust and other foreign matter sand papering and stopping including carriage of materials in all lead and lifts and heights.With enamel paint other then white.BI01010001010000000000000515BI01000011447.83Per Square metre.
3333Painting one coat (excluding priming coat)on wood and wood based surfaces with black japan paint to give an even shade including cleaning of all dirt,dust and other foreign matter including carriage of materials in all lead and lifts and heights.BI01010001010000000000000515BI0100001145557.65Per Square metre.
3434Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of materials in all leads, lift and height.\nBI01010001010000000000000515BI010000114651.44Per Square metre.
3535Distempering (two coat)with oil bound washable distemper of approved brand and manufacture and of required shade on decorated wall surface to give an even shade after thoroughly brushing the surface clean of all grease dirt loose pieces of scales and also including preparing the surface even and sand papered smooth including carriage of materials in all lead and lifts and heights.BI01010001010000000000000515BI010000114751.44Per Square metre.
3636Dismantling of tiled floors laid in mortar up to floor two level and above including stacking of serviceable materials and disposal of un-serviceable materials (wooden/concrete joists to be measured and paid for separately) through manual means with in approved dumping site as per the direction of the Engineer-in-Charge. For thickness of tiles upto 40 mmBI01010001010000000000000515BI010000114843.61Per Square metre.
3737Demolition of brick work above ground level upto floor two level and above including stacking of serviceable materials in specified dimension as per the direction of Engineer in Charge and disposal of un-serviceable materials within all lead and lifts through manual and mechanical means with in approved dumping site.BI01010001010000000000000515BI01000011491.14Per Cubic metre.
3838Demolition above G.I. upto floor two level and above including disposal of unserviceable materials with in all leads through manually and mechanical means including cutting the necessary reinforcement and separating out from RCC/R.B. work including carriage of materials in all leads and lifts.BI01010001010000000000000515BI01000011501.76Per Cubic metre.
3939Taking out doors, windows and clerestory windows shutters (steel or wood) including stacking within all lead including carriage of materials as per the direction of the Engineer-in-Charge.(a) Not exceeding 3.00 Sqmt. In areaBI01010001010000000000000515BI01000011514.93Each
4040Providing & fixing to 15 mm nominal bore wall ceiling and floor galvanized mild steel tube (Heavy grade) tube fittings and clamps including making good the wall ceiling and floor and carriage of material in all lead & lift.( Tata /Jindal Make)BI01010001010000000000000515BI010000115224per running metre
4141Providing and fixing C.P. Waste for wash basin of approved make complete including jointing and carriage of materials in all leads and liftsBI01010001010000000000000515BI01000011531Each
4242Providing and fixing kitchen stainless sink of Jindal/ Nirali/ Diamond make C.I.or M.S. brackets painted white including cutting holes in walls & making good the same but excluding fittings but including carriage of material 600mm x 450mm x 250mm including carriage of materials in all lead and lifts.BI01010001010000000000000515BI01000011541Each
4343Providing and fixing C.P. Brass Bib tap (heavy duty) of approved make complete including carriage of materials in all leads and liftsBI01010001010000000000000515BI01000011551Each

AI Tender Summary

OUR REF NO 22705758
AUTHORITY Government Departments
TENDER VALUE 8.26 Lakhs
LAST DATE 20-12-2019
Authority
Authority Name Himachal Pradesh Tourism Development Corporation Limited
Work Description Work To Be Executed At Neugal Cafe At Palampur Sub Head Up Gradation Of Neugal Cafe At Palampur Distt . Kangra H . P
Basic Detail
Tender No Proj/Misc/Palampur/12/19
Bidding Type Tender
Location
City Cafe Neugal Palampur
State Himachal Pradesh
Key Dates
Publish Date 30 Nov 2019
Submission Date 20 Dec 2019
Open Date 20 Dec 2019
Finance
Tender Value 8.26 Lakhs
Tender Fee 1200
EMD 17000
Exemption Not Available
Document List
Tendernotice_1.pdf
B9314160-DF0C-47CF-B948-8614702B7C06.html
BOQ_47584.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 30, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 20, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 20, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

html

B9314160-DF0C-47CF-B948-8614702B7C06.html

xls

BOQ_47584.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender