| 1 | 1 | Schedule A - Design & Drawing | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Submission and approval of Surveys, Soil Investigations ,Designs, Working Drawings including all layout, sections, typical details, Shop Drawings, as Built drawings ..etc complete for all components of works like 14.2 MLD STP at Lalpani based on Advanced modern SBR technology including all auxillary buildings / structures and all allied works as mentioned in Tender document. Contractor shall submit working Drawing and Implementation schedule as per Priority given by Engineer-In-Charge for approval. Payment shall be released on Prorata basis only after approval of working Drawings as per implementation schedule. | BI01010001010000000000000515BI0100001113 | 1 | Lumpsum |
|---|
| 3 | 2 | Total for Schedule B (14.20 MLD at Lalpani)- Sewerage Treatment Plant of Capacity 14.20 MLD, SBR Type. | BI01010001010000000000000515BI0100001114 | | |
|---|
| 4 | 2.01 | Designing, construction, Site development, hydraulic testing, commissioning and giving satisfactorily trials of 14.2 MLD STP of Advanced modern SBR technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components complete to achieve latest CPCB/ HPPCB / CPHEEO discharge standards BOD < 10ppm, TSS < 10ppm,Biological TN<10 ppm & PO4 < 2ppm to get recyclable quality of water for Industrial / agricultural purposes. All units shall be interconnected with administration building by suitable or RCC overhead walkways at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA etc complete. This item is inclusive of Design and Construction of RCC Retaining wall for Average 4 m height, Dismantling of existing structure if any, Site Development including any cutting, filling, grading etc. at site, All approach Roads / Access to Site, Piling/Anchoring with all labour, material as per Standard CPWD specifications and design approved by engineer in charge including all taxes (GST and other) and levies etc | | 14.2 | MLD |
|---|
| 5 | 3 | Total of Schedule C -Operation and Maintenance of New 14.20 MLD Sewerage Treatment Plant at Lalpani for Seven years | | | |
|---|
| 6 | 3.01 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 14.2 MLD Sewerage Treatment Plant of Lalpani For 1st year O&M | | 12 | Month |
|---|
| 7 | 3.02 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 14.2 MLD Sewerage Treatment Plant of Lalpani For 2nd year O&M | | 12 | Month |
|---|
| 8 | 3.03 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 14.2 MLD Sewerage Treatment Plant of Lalpani For 3rd year O&M | | 12 | Month |
|---|
| 9 | 3.04 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 14.2 MLD Sewerage Treatment Plant of Lalpani For 4th year O&M | | 12 | Month |
|---|
| 10 | 3.05 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 14.2 MLD Sewerage Treatment Plant of Lalpani For 5th year O&M | | 12 | Month |
|---|
| 11 | 3.06 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 14.2 MLD Sewerage Treatment Plant of Lalpani For 6th year O&M | | 12 | Month |
|---|
| 12 | 3.07 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 14.2 MLD Sewerage Treatment Plant of Lalpani For 7th year O&M | | 12 | Month |
|---|