| 1 | 1 | EW in cutting or in Filling with 05KM cartage with all complete as per SI 253 a&b &231a. without Royality | BI01010001010000000000000515BI0100001113 | 765 | m3 |
|---|
| 2 | 2 | Dis. Of CC/BW in required shape & size etc all complete as directed by EIC. | BI01010001010000000000000515BI0100001114 | 1 | Job |
|---|
| 3 | 3 | Diversion of drain water or dewatering with mannual & Pump&slush cleaning as directed by EIC. | BI01010001010000000000000515BI0100001115 | 1 | Job |
|---|
| 4 | 4 | P&L of GSB well graded materials (Gr-1) spreading in uniformlayer with motor grader on preapared surface & compected with smooth wheeled vibratory rollar to achieve desired density & all complete as per morth clause 401.1 | BI01010001010000000000000515BI0100001116 | 385 | m3 |
|---|
| 5 | 5 | M-150 brick work in foundation and plinth in 1:4 one part cement and 4 part coarse sand mortar incl. supply of all materials, labour, tools and plants etc. required for proper completion of work as per directed by E/I. (S.I. No. 305) | BI01010001010000000000000515BI0100001117 | 35 | m3 |
|---|
| 6 | 6 | 12mm thick plaster in 1:4 with cement and coarse sand mortar incl. supply of all materials, labour, tools and plants etc. required for proper completion of work as per directed by E/I. (S.I. No. 584) | BI01010001010000000000000515BI0100001118 | 100 | m2 |
|---|
| 7 | 7 | S&L of I shaped precast 80 mm CC interlocking Rubber moulded tiles with 30 mpa compressive strength& weight 4.5 Kg including 25 mm thick local sand base levelling & dressing of surface to required level &shape filling joints with local sand all complete as directed by EIC | BI01010001010000000000000515BI0100001119 | 2545 | m2 |
|---|
| 8 | 8 | S&L of CC in 1:2:4 in cement & Coarse Sand& 20 mm nomonal size stone grit & all completewith all complete as per SI 279 A | BI01010001010000000000000515BI0100001120 | 6 | m3 |
|---|
| 9 | 9 | R.C.C. work with cement, approved coarse sand and 2cm gauge approved stone grit in proportion of 1:1.5:3 in Slab excluding reinforcement but including necessary centering and shuttering incl. supply of all materials, labour, tools and plants etc.required for proper completion of work as per directed by E/I. (S.I. No. New 284A) | BI01010001010000000000000515BI0100001121 | 4 | m3 |
|---|
| 10 | 10 | MS iron works in reinforcementand all completewith all complete as per SI 504 | BI01010001010000000000000515BI0100001122 | 400 | Kg |
|---|
| 11 | 11 | Disposal of Construction malva with cleaning of site &disposed up to disposal place as directed by EIC | BI01010001010000000000000515BI0100001123 | 1 | Job |
|---|
| 12 | 12 | P&F of Inauguration stone Board with required size& letter imbeded on smooth surface of granite stone with fixed on required height &size of brick pedestal with plaster etc all complete as directed by EIC | BI01010001010000000000000515BI0100001124 | 1 | Job |
|---|