Construction Concrete Road At Q Sector At Vittalnagar In Ward No . 87 , excavation for pipe line trenches in earth , soils of all types and gravel and soft murum including removing the excavated material up to a distance of 50mtrs . and lifts as below stacking and directed normal dewatering preparing the bed for foundation and excluding backfilling , etc . complete ( bd -a-1 / 259 ) lift 0 to 1 . . 50 m ( mjp dsr page no 33 item no . 1 , excavation for foundation / pipe trenches in soft rock and old cement and lime masonary foundation , asphalt road including removing the excavated material upto a distance of 50 m beyond the area and lifts as below , stacking as directed by engineer - in - charge , normal dewatering , preparing the bed for foundation and excluding backfilling , etc . complete ( lift 0 to 1 . 5 m ) ( spec . no . bd . a 4 page no . 259 ) ( mjp dsr page no . 33 i no . 5 ) , removing the following size r . c . c / swg pipes including breaking out joints , sorting out use full material and stacking them as directed by engineer - in charge analis item mjp dsr page no . as per rtae analyisis 150 to 250 mm dia rcc pipe , removing the following size r . c . c / swg pipes including breaking out joints , sorting out use full material and stacking them as directed by engineer - in charge analis item mjp dsr page no . as per rtae analyisis 150 to 250 mm dia swg pipe , providing isi standard stoneware pipe including all taxes ( central and local ) , inspection charges , railway freight , unloading from railway wagons , loading into trucks , transport to department stores , unloading , stacking etc . complete . mjp dsr page no . 92 item no . section - 1 ( v ) 200mm swg pipes , providing isi standard stoneware pipe including all taxes ( central and local ) , inspection charges , railway freight , unloading from railway wagons , loading into trucks , transport to department stores , unloading , stacking etc . complete . mjp dsr page no . 92 item no . section - 1 ( v ) 250mm swg pipes , lowering , laying and jointing in proper grade and alignment stone ware pipes with cement joints in cm ( 1 : 1 ) proportion of following diameters including cost of conveyance from stores to site of work , joinging material , labour giving satificatory hydraulic testing etc complete mjp dsr page no . 92 item no . section - 1 ( v ) 200mm swg pipes , lowering , laying and jointing in proper grade and alignment stone ware pipes with cement joints in cm ( 1 : 1 ) proportion of following diameters including cost of conveyance from stores to site of work , joinging material , labour giving satificatory hydraulic testing etc complete mjp dsr page no . 92 item no . section - 1 ( v ) 250mm swg pipes , excavation foundation in / pipe trenches in earth , soils of all types and gravel and soft murum including removing the excavated material up to a distance of 50mtrs . and lifts as below stacking and spreading directed normal dewatering preparing the bed for foundation and excluding backfilling , etc . complete ( lift 0 to 1 . 5 m ) ( spec no bd -a page no . 259 ) ( mjp dsr 2011-2012 ) , rodding for removing chock up of existing drainage line including required dewatering desikting of manhole disilting the existing drainage laine using rodding removing & refixing manhole cover piugging drainage line stacking the silt as directed conrtroling traffic providing lantern lgiht etc . if required providing cautionary / warning traffic sign boards providing necessary securiry arragment cleaning site after work getting approval for cleaning work etc . complete . ( non dsr rate analysis for year 2015-16 ) mjp dsr page no . as per analysis item no . removing cohockup of 100mm dia to 250 mm dia exising drainage line , rodding for removing chock up of existing drainage line including required dewatering desikting of manhole disilting the existing drainage laine using rodding removing & refixing manhole cover piugging drainage line stacking the silt as directed conrtroling traffic providing lantern lgiht etc . if required providing cautionary / warning traffic sign boards providing necessary securiry arragment cleaning site after work getting approval for cleaning work etc . complete . ( non dsr rate analysis for year 2015-16 ) mjp dsr page no . as per analysis item no . removing cohockup of 100mm dia to 250 mm dia exising drainage line removing chockup of above 250 mm dia , refilling the trenches available excavated stuff with soft material . first over pipe line and then hard material in 15 cm layers with all leads and lifts including consolidation , surcharging , etc complete mjp dsr page no 43 i no . 15 , providing and repairing to existing manhole chambers after fixing pipes with necessary brick work , benching , channeling , plastering etc . complete ( as per rate analysis ) no , raising the existing manhole chamber with 23 cm thick brick work in cm 1 : 6 prop . in 30 cm concentrick cone including 12 mm thick cement plaster in cm 1 : 4 prop on both side complete . ( as per rate analysis ) no , fixing of sfrc farame & cover to manahol chamber / rectangular sfrc cover & frame in cc m-15 ( concret 1:2:4 pro . etc . complate . ( as per rate . analysis ) 22- circular hd 540 / 630with frame , providing and constructing 0 . 90 cm dia at bottom b . b . masonary manhole chember with 23 cm thick brick work in cm 1:5 prop including 12 mm thick . smooth plaster on both sides in cm1:2:4 and fixing sfrc frame and cover in c . c . 1:2:4 etc . complete ( rs . 1212 / - per 30 cm ) . depth 1 . 2 mt , providing & supplying steel fiber reinforced concrete ( s . f . r . c ) frame , cover heavy duty / medium duty of rectangular pr circular in shape of approved make including loading unloading transportation , all taxes etc . complete as directed by engineer - in charge ( 20 tonnes capicity ) r mjp / dsr 2006-07 / it -17page 244 circular hd 540 / 630 with frame , providing and laying situ sement concrete m-15 / 1:2:4 of trap / granite / quartzite / gneiss metal for fundation and bedding including dewatering , compacting , and curing etc . com . ( 6 . 72 bag / cum ) spec . no . bd . e . 1page no . 287 pwd dsr . no . page no . 24 item no . 29 , tranportation of surplus material form work site to any disposal place as directed by the engineer in charge with a lead of ------------ km including and stacking etc . complete . mjp dsr page no . ( mjp / dsr / 2011-12 / lead chart ) item no . earth material lead beyond 5 . 0 km