| 1 | 1 | STRENGTHENING OF THE S.MAMPATTI VILLAGE ROAD ( R-256 ) (KM 0/0 - 0/150) IN SINGAMPUNARI BLOCK. | | | |
|---|
| 2 | 2 | Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers | | 108 | Sqm |
|---|
| 3 | 3 | Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A\n | | 54 | Cum |
|---|
| 4 | 4 | Picking the existing Damaged Bt Surface including cost and conveyonce of all labour charges etc completed | | 196.17 | Sqm |
|---|
| 5 | 5 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | | | |
|---|
| 6 | 6 | Km 0/0-0/150 | | 27 | Cum |
|---|
| 7 | 7 | Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | | | |
|---|
| 8 | 8 | Km 0/0-0/150 | | 44.15 | Cum |
|---|
| 9 | 9 | Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | | | |
|---|
| 10 | 10 | Km 0/0-0/150 | | 44.15 | Cum |
|---|
| 11 | 11 | Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification. | | | |
|---|
| 12 | 12 | Km 0/0-0/150 | | 588.5 | Sqm |
|---|
| 13 | 13 | Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste) | | | |
|---|
| 14 | 14 | Km 0/0-0/150 | | 588.5 | Sqm |
|---|
| 15 | 15 | Provision for KM Stone & HM Stone | | | |
|---|
| 16 | 16 | Provision for Sighn Board | | 1 | Nos |
|---|
| 17 | 17 | Sub total | | | |
|---|
| 18 | 18 | UPGRADATION OF THE MURAIYUR AYYANAR KOVIL ROAD ( R-92 ) (KM 0/0 - 1/150) IN SINGAMPUNARI BLOCK. | | | |
|---|
| 19 | 19 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | | 264.6 | Sqm |
|---|
| 20 | 20 | Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A\n | | 105.84 | Cum |
|---|
| 21 | 21 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | | | |
|---|
| 22 | 22 | Km 0/850 - 1/294 | | 52.92 | Cum |
|---|
| 23 | 23 | Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | | | |
|---|
| 24 | 24 | Km 0/850 - 1/0 | | 33.75 | Cum |
|---|
| 25 | 25 | Km 1/0 - 1/294 | | 32.97 | Cum |
|---|
| 26 | 26 | Providing and laying tack coat over WBM surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification. | | | |
|---|
| 27 | 27 | Km 0/850 - 1/294 | | 889.5 | Sqm |
|---|
| 28 | 28 | Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste) | | | |
|---|
| 29 | 29 | Km 0/850 - 1/0 | | 450 | Sqm |
|---|
| 30 | 30 | Km 1/0 - 1/294 | | 439.5 | Sqm |
|---|
| 31 | 31 | Provision for KM Stone & HM Stone | | | |
|---|
| 32 | 32 | KM Stone | | 1 | No |
|---|
| 33 | 33 | HM Stone | | 1 | No |
|---|
| 34 | 34 | Sub total | | | |
|---|
| 35 | 35 | UPGRADATION OF THE ROAD FROM SV.MANGALAM - MELAPATTI ROAD TO AYYANAR KOVIL ROAD ( R-192 ) (KM 0/0 - 0/300) IN SINGAMPUNARI BLOCK. | | | |
|---|
| 36 | 36 | Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers | | 216 | Sqm |
|---|
| 37 | 37 | Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A\n | | 108 | Cum |
|---|
| 38 | 38 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | | | |
|---|
| 39 | 39 | Km 0/0 - 0/300 | | 54 | Cum |
|---|
| 40 | 40 | Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | | | |
|---|
| 41 | 41 | Km 0/0 - 0/300 | | 69.75 | Cum |
|---|
| 42 | 42 | Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | | | |
|---|
| 43 | 43 | Km 0/0 - 0/300 | | 69.75 | Cum |
|---|
| 44 | 44 | Providing and laying tack coat over WBM surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification. | | | |
|---|
| 45 | 45 | Km 0/0 - 0/300 | | 930 | Sqm |
|---|
| 46 | 46 | Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste) | | | |
|---|
| 47 | 47 | Km 0/0 - 0/300 | | 930 | Sqm |
|---|
| 48 | 48 | Provision for KM Stone & HM Stone | | | |
|---|
| 49 | 49 | HM Stone | | 1 | No |
|---|
| 50 | 50 | Sign Board | | 1 | No |
|---|
| 51 | 51 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}\n | | 1 | GST Amount (in Rupees) |
|---|