| 1 | 10 | Fixed Cost For O&M of Conveyor system | Item 00010 | | |
|---|
| 2 | 10.1 | The fixed cost for the mentioned line item includes the cost of manpower involved for Operation and maintenance of Conveyor System including Housekeeping of the complete system and periphery, Housekeeping of RRLS & connected Railway Track, Mobilisation of JCB, tractor-trolley etc. for removal of coke spilled during loading operation, and the cost of Spares, Consumables, Tools & tackles etc. required for Operation and Maintenance of Conveyor System | Item 10.10 | 24 | MON |
|---|
| 3 | 20 | Cost For Pet Coke Loading in Rail/Trucks | Item 00020 | | |
|---|
| 4 | 20.1 | The cost for the mentioned line item includes Cost per Metric Tonne of Pet coke loading either into Rail wagon or Trucks by using the RRLS facility at IOCL Paradip Refinery | Item 20.10 | 1.13238e+06 | TO |
|---|
| 5 | 30 | Coke Handling in Coke Yard (Truck /OGH L | Item 00030 | | |
|---|
| 6 | 30.1 | The cost for the mentioned line item includes Cost per Metric Tonne of Pet coke loading either into Trucks or Over Ground Hopper by using Pay Loader in Coke Yard at IOCL Paradip Refinery | Item 30.10 | 1.78762e+06 | TO |
|---|
| 7 | 40 | CAMC of RRLS for 1st Year | Item 00040 | | |
|---|
| 8 | 40.1 | The cost for the mentioned line item includes 1st year Comprehensive Annual Maintenance Contract (CAMC) for Rapid Rail Loading System (RRLS) from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor .All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC | Item 40.10 | 24 | EA |
|---|
| 9 | 50 | CAMC of RRLS for 2nd Year | Item 00050 | | |
|---|
| 10 | 50.1 | The cost for the mentioned line item includes 2nd year Comprehensive Annual Maintenance Contract (CAMC) for Rapid Rail Loading System (RRLS) from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor .All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. | Item 50.10 | 24 | EA |
|---|
| 11 | 60 | CAMC of Inmotion Weigh Bridge 1st Year | Item 00060 | | |
|---|
| 12 | 60.1 | \"The cost for the mentioned line item includes 1st year Comprehensive Annual Maintenance Contract (CAMC) for In Motion Weigh Bridge from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. | Item 60.10 | 24 | EA |
|---|
| 13 | 70 | CAMC of Inmotion Weigh Bridge 2ndYear | Item 00070 | | |
|---|
| 14 | 70.1 | The cost for the mentioned line item includes 2nd year Comprehensive Annual Maintenance Contract (CAMC) for In Motion Weigh Bridge from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. | Item 70.10 | 24 | EA |
|---|
| 15 | 80 | CAMC of FDAS for 1st Year | Item 00080 | | |
|---|
| 16 | 80.1 | The cost for the mentioned line item includes 1st year Comprehensive Annual Maintenance Contract (CAMC) for Fire Detection & Annunciation System from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. | Item 80.10 | 24 | EA |
|---|
| 17 | 90 | CAMC of FDAS for 2nd Year | Item 00090 | | |
|---|
| 18 | 90.1 | The cost for the mentioned line item includes 2nd year Comprehensive Annual Maintenance Contract (CAMC) for Fire Detection & Annunciation System from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. | Item 90.10 | 24 | EA |
|---|
| 19 | 100 | CPWAMC Charges for Elevator 1st Year | Item 00100 | | |
|---|
| 20 | 100.1 | The cost for the mentioned line item includes 1st year Comprehensive Annual Maintenance Contract (CAMC) for Elevators from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC | Item 100.10 | 24 | EA |
|---|
| 21 | 110 | CPWAMC Charges for Elevator 2nd Year | Item 00110 | | |
|---|
| 22 | 110.1 | The cost for the mentioned line item includes 2nd year Comprehensive Annual Maintenance Contract (CAMC) for elevators from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. | Item 110.10 | 24 | EA |
|---|
| 23 | 120 | Liasioning for Stamping for In-Motion we | Item 00120 | | |
|---|
| 24 | 120.1 | The cost of line item includes the expenses like charges payable to Legal metrology department and all other incidental charges / expenses including liasoning & coordination with railways, W&M departments for completion of certification job | Item 120.10 | 4 | EA |
|---|
| 25 | 130 | Emergency Coke Handling | Item 00130 | | |
|---|
| 26 | 130.1 | The cost of line item includes emergency evauation of coke from DCU to coke yard as per instruction from EIC. | Item 130.10 | 17000 | TO |
|---|
| 27 | 140 | Emergency Conveyor Operation | Item 00140 | | |
|---|
| 28 | 140.1 | The cost of line item includes Operation and Maintenance of Conveyor system in third shift during extreme emergency as per instruction from EIC. | Item 140.10 | 75 | EA |
|---|