| 1 | 1 | Supply of AC UNINTERRUPTABLE POWER SYSTEM (UPS) in accordance with materital requisition. | | | |
|---|
| 2 | 1.01 | Design, Engineering, Manufacturing, Testing (FAT), Training at Vendor Woks, Third Party Inspection, Supply of equipment & accessories including mandatory spares, commissioning spares, special tools & tackles, and Site Testing (SAT) and commissioning for SUPPLY of AC UNINTERRUPTABLE POWER SYSTEM (UPS) (Tag No. 823-UPS-501) for BS-VI Project at IOCL PARADIP REFINERY as specified in Material Requisition.\nThe scope mentioned above is indicative and detailed scope is mentioned in the Technical Part (Material Requisition) of the tender. | item1 | 1 | Lot |
|---|
| 3 | 1.02 | Design, Engineering, Manufacturing, Testing (FAT), Training at Vendor Woks, Third Party Inspection, Supply of equipment & accessories including mandatory spares, commissioning spares, special tools & tackles, and Site Testing (SAT) and commissioning for SUPPLY of AC UNINTERRUPTABLE POWER SYSTEM (UPS) (Tag No. 823-UPS-502) for BS-VI Project at IOCL PARADIP REFINERY as specified in Material Requisition.\nThe scope mentioned above is indicative and detailed scope is mentioned in the Technical Part (Material Requisition) of the tender. | item2 | 1 | Lot |
|---|
| 4 | 1.03 | Design, Engineering, Manufacturing, Testing (FAT), Training at Vendor Woks, Third Party Inspection, Supply of equipment & accessories including mandatory spares, commissioning spares, special tools & tackles, and Site Testing (SAT) and commissioning for SUPPLY of AC UNINTERRUPTABLE POWER SYSTEM (UPS) (Tag No.823-UPS-503) for BS-VI Project at IOCL PARADIP REFINERY as specified in Material Requisition.\nThe scope mentioned above is indicative and detailed scope is mentioned in the Technical Part (Material Requisition) of the tender. | item3 | 1 | Lot |
|---|
| 5 | 1.04 | Design, Engineering, Manufacturing, Testing (FAT), Training at Vendor Woks, Third Party Inspection, Supply of equipment & accessories including mandatory spares, commissioning spares, special tools & tackles, and Site Testing (SAT) and commissioning for SUPPLY of AC UNINTERRUPTABLE POWER SYSTEM (UPS) \n(Tag No. 808-INST-UPS-003N) for BS-VI Project at IOCL PARADIP REFINERY as specified in Material Requisition.\nThe scope mentioned above is indicative and detailed scope is mentioned in the Technical Part (Material Requisition) of the tender. | item4 | 1 | Lot |
|---|
| 6 | 1.05 | Design, Engineering, Manufacturing, Testing (FAT), Training at Vendor Woks, Third Party Inspection, Supply of equipment & accessories including mandatory spares, commissioning spares, special tools & tackles, and Site Testing (SAT) and commissioning for SUPPLY of AC UNINTERRUPTABLE POWER SYSTEM (UPS) (Tag No.340S-UPS-501) for BS-VI Project at IOCL PARADIP REFINERY as specified in Material Requisition.\nThe scope mentioned above is indicative and detailed scope is mentioned in the Technical Part (Material Requisition) of the tender. | item5 | 1 | Lot |
|---|
| 7 | 2 | Charges for Site Supervision of Erection of UPS systems | | | |
|---|
| 8 | 2.01 | Per diem charges for upto 8 hours work on normal working days. | item6 | 1 | Man Day |
|---|
| 9 | 2.02 | Overtime rate / hour beyond normal 8 hours work on normal working days. | item7 | 1 | Per Hour |
|---|
| 10 | 2.03 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). | item8 | 1 | Per Hour |
|---|
| 11 | 3 | Charges for Training at IOCL Paradip Refinery for UPS System | | | |
|---|
| 12 | 3.01 | Charges for Training at site for UPS System (02 Man-Days) | item9 | 1 | Lumpsum |
|---|
| 13 | 4 | Charges for 2 years Operation and Maintenance Spares for UPS System \nRecommended spares for two years trouble-free operation. \nNote: Vendor shall furnish separately a complete list of recommended spares with their unit rate indicated along side. | | | |
|---|
| 14 | 4.01 | Charges for 2 years Operation and Maintenance Spares for UPS System .\nRecommended spares for two years trouble-free operation. \n (Tag No. 823-UPS-501) | item10 | 1 | Lot |
|---|
| 15 | 4.02 | Charges for 2 years Operation and Maintenance Spares for UPS System .\nRecommended spares for two years trouble-free operation. \n (Tag No. 823-UPS-502) | item11 | 1 | Lot |
|---|
| 16 | 4.03 | Charges for 2 years Operation and Maintenance Spares for UPS System .\nRecommended spares for two years trouble-free operation. \n (Tag No. 823-UPS-503) | item12 | 1 | Lot |
|---|
| 17 | 4.04 | Charges for 2 years Operation and Maintenance Spares for UPS System .\nRecommended spares for two years trouble-free operation. \n (Tag No. 808-INST-UPS-003N) | item13 | 1 | Lot |
|---|
| 18 | 4.05 | Charges for 2 years Operation and Maintenance Spares for UPS System .\nRecommended spares for two years trouble-free operation. \n (Tag No. 340S-UPS-501) | item14 | 1 | Lot |
|---|