| 1 | 1.01 | Overhauling of RO by unloading & loading of following media, multi port valve, membrane etc.including servicing charge as per direction of Engineer-in-charge RO Membrane 4040 make DOW USA,Filmtech etc | item2 | 9 | Each |
|---|
| 2 | 1.02 | Overhauling of RO by unloading & loading of following media, multi port valve, membrane etc.including servicing charge as per direction of Engineer-in-charge Braka sand16/32 Mesh | item3 | 12 | Bag (per 40kg) |
|---|
| 3 | 1.03 | Overhauling of RO by unloading & loading of following media, multi port valve, membrane etc.including servicing charge as per direction of Engineer-in-charge Braka gravel25mm,20mm,15mm,12mm & 6mm | item4 | 9 | Bag (per 40 kg) |
|---|
| 4 | 1.04 | Overhauling of RO by unloading & loading of following media, multi port valve, membrane etc.including servicing charge as per direction of Engineer-in-charge Catalytic charge media | item5 | 15 | Bag (per 35 kg) |
|---|
| 5 | 1.05 | Overhauling of RO by unloading & loading of following media, multi port valve, membrane etc.including servicing charge as per direction of Engineer-in-chargeActivated Carbon | item6 | 135 | kg |
|---|
| 6 | 1.06 | Overhauling of RO by unloading & loading of following media, multi port valve, membrane etc.including servicing charge as per direction of Engineer-in-charge 20\" Micron Candle of approved brand and make as per direction of Enginner-in-charge | item7 | 6 | Each |
|---|
| 7 | 1.07 | Overhauling of RO by unloading & loading of following media, multi port valve, membrane etc.including servicing charge as per direction of Engineer-in-charge UF Filter of approved brand and make as per direction of Enginner-in-charge | item8 | 6 | Job |
|---|
| 8 | 1.08 | Providing and fixing Multi port Valve of 3 in 1 position of approved brand and make as per direction of Enginner-in-charge | item9 | 6 | Each |
|---|
| 9 | 1.09 | Repairing and servicing of High Presssure pump of 2/1.5 HP, starter & rewinding the same as per direction of Engineer-in-charge | item10 | 1 | Job |
|---|
| 10 | 1.1 | Repairing and servicing of High Presssure pump of 2/1.5 HP, starter per direction of Engineer-in-charge (excluding rewinding) | item11 | 3 | Job |
|---|
| 11 | 1.11 | Chemical & Biological testing of water half yearly as per direction of EIC | item12 | 12 | Half yearly |
|---|
| 12 | 1.12 | Providing and fixing High Presssure pump of 2 HP,220V, single phase &15 stage make CRI,Kiloskar, Lubi equivalent | item13 | 1 | Each |
|---|
| 13 | 1.13 | Providing and fixing High Presssure pump of 1.5 HP,220V, single phase &11 stage of make CRI,Kiloskar, Lubi equivalent | item14 | 1 | Each |
|---|
| 14 | 1.14 | Engagement of trained Operator for day to day back washing, cleaning of sump, dosing of chemical etc. | item15 | 12 | month |
|---|
| 15 | 1.15 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge Micron Candle 20\" long | item16 | 12 | Each |
|---|
| 16 | 1.16 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge Carbon Candle 20\" long | item17 | 3 | Each |
|---|
| 17 | 1.17 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge 75 GPD Membrane | item18 | 12 | Each |
|---|
| 18 | 1.18 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge Taste & order filter | item19 | 3 | Each |
|---|
| 19 | 1.19 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge 5V | item20 | 3 | Each |
|---|
| 20 | 1.2 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge DC Motor Pump | item21 | 3 | Each |
|---|
| 21 | 1.21 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge DC adopter 24 X 48V | item22 | 3 | Each |
|---|
| 22 | 1.22 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge Pipe1/4 &3/8 (5+2) | item23 | 21 | Mtr |
|---|
| 23 | 1.23 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge FR | item24 | 3 | Each |
|---|
| 24 | 1.24 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge Elbow 20 mm | item25 | 12 | Each |
|---|
| 25 | 1.25 | Replacement of consumable spares in RO plant as per the direction of Engineer in charge Tee 20 mm | item26 | 12 | Each |
|---|
| 26 | 1.26 | Service Charge for taking out and fixing of 60 ltr RO plant as per direction of Engineer in charge | item27 | 3 | Job |
|---|
| 27 | 1.27 | Cleaning CI/GI pipe line with pressure wash mixed with chlorine and disposal for cleaned water at interval of every 200 meter by cutting making good the pipe line( fitting required for making good will be provided separetely) all included as per the direction of Engieer-in-charge. 40mm to 50 mm pipe | item28 | 100 | Mtr |
|---|
| 28 | 1.28 | Cleaning CI/GI pipe line with pressure wash mixed with chlorine and disposal for cleaned water at interval of every 200 meter by cutting making good the pipe line( fitting required for making good will be provided separetely) all included as per the direction of Engieer-in-charge. 65 mm pipe | item29 | 110 | Mtr |
|---|
| 29 | 1.29 | Cleaning CI/GI pipe line with pressure wash mixed with chlorine and disposal for cleaned water at interval of every 200 meter by cutting making good the pipe line( fitting required for making good will be provided separetely) all included as per the direction of Engieer-in-charge. 80 mm & above | item30 | 900 | Mtr |
|---|
| 30 | 1.3 | Providing & fixing of GI union in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 40mm | item31 | 7 | Each |
|---|
| 31 | 1.31 | Providing & fixing of GI union in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 50 mm | item32 | 5 | Each |
|---|
| 32 | 1.32 | Providing & fixing of GI union in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 65 mm | item33 | 5 | Each |
|---|
| 33 | 1.33 | Providing & fixing of GI union in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 80 mm | item34 | 5 | Each |
|---|
| 34 | 1.34 | Providing & fixing of GI Socket in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 40mm | item35 | 7 | Each |
|---|
| 35 | 1.35 | Providing & fixing of GI Socket in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 50 mm | item36 | 5 | Each |
|---|
| 36 | 1.36 | Providing & fixing of GI Socket in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 65 mm | item37 | 5 | Each |
|---|
| 37 | 1.37 | Providing & fixing of GI Socket in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 80 mm | item38 | 5 | Each |
|---|
| 38 | 1.38 | Providing & fixing of GI flange in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 100 mm | item39 | 4 | Pair |
|---|
| 39 | 1.39 | Providing & fixing of GI Nipple in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 40mm X 150mm | item40 | 7 | Each |
|---|
| 40 | 1.4 | Providing & fixing of GI Nipple in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 50 mm X 150mm | item41 | 7 | Each |
|---|
| 41 | 1.41 | Providing & fixing of GI Nipple in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 65 mm X 150mm | item42 | 8 | Each |
|---|
| 42 | 1.42 | Providing & fixing of GI Nipple in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 80 mm X 150mm | item43 | 5 | Each |
|---|
| 43 | 1.43 | Providing & fixing of Gun metal gate valve in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 40mm | item44 | 4 | Each |
|---|
| 44 | 1.44 | Providing & fixing of Gun metal gate valve in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 50 mm | item45 | 4 | Each |
|---|
| 45 | 1.45 | Providing & fixing of Gun metal gate valve in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 65 mm | item46 | 2 | Each |
|---|
| 46 | 1.46 | Providing & fixing of Gun metal gate valve in existing line as per site requirement during cleaning of pipe direction of Engineer in charge 80 mm | item47 | 2 | Each |
|---|