Public Works Department-PWD has published Construction Of Rcc T-Beam Bridge 25.0M Span Over River Tuntuke On Kuthur To Chassir Road. Submission Date for this Tender is 27-11-2019. Bridge Work Tenders in tuensang Nagaland. Bidders can get complete Tender details and download the document.
Name of Work: CONSTRUCTION OF RCC T-BEAM BRIDGE 25.0M SPAN OVER RIVER TUNTUKE ON KUTHUR TO CHASSIR ROAD | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earthwork in excavation of foundation of structures | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Upto 3m depth | 1308.22 | cum | |
3 | 1.02 | From 3m to 6m depth | 871.33 | cum | |
4 | 2 | PCC 1:3:6 in foundation | BI01010001010000000000000515BI0100001118 | 99.48 | cum |
5 | 2.01 | Cost of Carriage Materials for PCC. | 1 | cum | |
6 | 3 | RR Stone masonry in cement mortar for substructure | 141.76 | cum | |
7 | 3.01 | Cost of Carriage Materials for Stone Masonry. | 1 | cum | |
8 | 4 | RCC M 25 grade in open foundation | 341.55 | cum | |
9 | 4.01 | Cost of Carriage Materials for RCC M25 | 1 | cum | |
10 | 5 | RCC M 25 grade in sub- structure | BI01010001010000000000000515BI0100001120 | 360.42 | cum |
11 | 5.01 | Cost of Carriage Materials for RCC M25 | 1 | cum | |
12 | 6 | Supplying, fitting and placing TMT (Fe 500 or above) bar reinforcement in foundation | BI01010001010000000000000515BI0100001121 | 84.3 | t |
13 | 6.01 | Cost of Carriage Materials for TMT. | 1 | t | |
14 | 7 | Providing weepholes in PCC /RCC abutment,wing wall with 100mm dia UPVC pipe | BI01010001010000000000000515BI0100001123 | 138.68 | m |
15 | 8 | Back filling behind abutment, wing wall and return wall | BI01010001010000000000000515BI0100001125 | 461.79 | cum |
16 | 8.01 | Cost of Carriage Materials for Backfilling. | 1 | cum | |
17 | 9 | Providing & laying of filter media with granular materials/stone crushed aggregates | BI01010001010000000000000515BI0100001126 | 148.52 | cum |
18 | 9.01 | Cost of Carriage Materials for filter media. | 1 | cum | |
19 | 10 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) | 172032 | cum | |
20 | 11 | Providing and laying RCC in superstructure | |||
21 | 11.01 | Height upto 5m | 146.49 | cum | |
22 | 11.02 | Cost of Carriage Materials for RCC. | 1 | cum | |
23 | 12 | Supplying, fitting, and placing TMT(Fe 500 or above) bar reinforcement (Fe 500) in superstructure | 26.89 | MT | |
24 | 12.01 | Cost of Carriage Materials for TMT. | 1 | MT | |
25 | 13 | Providing and laying cement concrete wearing course M 30 | 28.01 | cum | |
26 | 13.01 | Cost of Carriage Materials for M30. | 1 | cum | |
27 | 14 | Drainage spouts complete as per drawing | 9 | each | |
28 | 15 | Providing PCC M15 grade leveling course below approach slab | 6.3 | cum | |
29 | 15.01 | Cost of Carriage Materials for M15. | 1 | cum | |
30 | 16 | Providing RCC M25 approach slab including reinforcement and formwork | 12.6 | cum | |
31 | 16.01 | Cost of Carriage Materials for M25. | 1 | cum | |
32 | 17 | Providing and laying of compression seal joint | 17.4 | cum | |
33 | 18 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 | 140.4 | cum | |
34 | 18.01 | Cost of Carriage Materials for Stone boulder. | 1 | cum | |
35 | 20 | (A) Sub - Total | 1 | No. | |
36 | 21 | (B) Exclusive of VAT (5%) on (A) | 1 | No. | |
37 | 22 | Add GST (12%) & Swachh Bharat(0.5%) on (B) | 1 | No. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail