Tiruppur Dt 14Th Finance 2019-20 Dharapuram Pkg11 Upgradation To The Road From Madathupalayam Panchayat Office To South Vaikkal Paalam Upgradation To The Road From N . Kumarapalayam To Vaikkal Road
Tender Value
19.45 Lakhs
Estimated cost
Bid Submission
25 Nov 2019
0 days left
EMD
19500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dharapuram → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tiruppur Dt 14Th Finance 2019-20 Dharapuram Pkg11 Upgradation To The Road From Madathupalayam Panchayat Office To South Vaikkal PaalamUpgradation To The Road From N . Kumarapalayam To Vaikkal Road
BOQ
| Name of Work : 1) Upgradation to the Road from Madathupalayam Panchayat office to South Vaikkal paalam Km 0/0 to 0/8 ( Working Reach 0/0 - 0/5 ) 2) Upgradation to the Road from N.Kumarapalayam to Vaikkal Road KM 0/0 - 1/0 ( Working Reach 0/5 - 1/0 ). | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Unnamed: 2 | Quantity | Units | |
| 1 | 1 | 1) Upgradation to the Road from Madathupalayam Panchayat office to South Vaikkal paalam Km 0/0 to 0/8 ( Working Reach 0/0 - 0/5 ) | 1 | nos | |
| 2 | 2 | Clearing light Jungles including all labour charges for burrying and burning etc., complete., | 1 | nos | |
| 3 | 3 | Km 0/0- 0/500 | 400.5 | sqm | |
| 4 | 4 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A | 1 | nos | |
| 5 | 5 | Km 0/0- 0/500 | 400.5 | cum | |
| 6 | 6 | Collection and Supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc., complete, for SHOULDERS. | 1 | nos | |
| 7 | 7 | Km 0/0- 0/500 | 62.3 | cum | |
| 8 | 8 | Providing and laying 75mm compacted thick WBM Gr.II using 1 cum of 63 mm to 22.40 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer. | 1 | nos | |
| 9 | 9 | Km 0/0- 0/500 | 130.36 | cum | |
| 10 | 10 | Providing and laying 63mm compacted thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer. | 1 | nos | |
| 11 | 11 | Km 0/0- 0/500 | 130.36 | cum | |
| 12 | 12 | Applying TACK COAT over WMM surface at 4.00Kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete | 1 | nos | |
| 13 | 13 | Km 0/0- 0/500 | 1738.13 | sqm | |
| 14 | 14 | Providing, laying and rolling of open- graded premix carpet of 20 mm thick composed of 13.2 mm to 5.60 mm aggregates eithe using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity , finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508. | 1 | nos | |
| 15 | 15 | Km 0/0- 0/500 | 1738.13 | sqm | |
| 16 | 16 | Provision for HM stones | 2 | no | |
| 17 | 17 | Provision for Name boards | 1 | no | |
| 18 | 18 | 2) Upgradation to the Road from N.Kumarapalayam to Vaikkal Road KM 0/0 - 1/0 ( Working Reach 0/5 - 1/0 ) | 1 | nos | |
| 19 | 19 | Clearing light Jungles including all labour charges for burrying and burning etc., complete., | 1 | nos | |
| 20 | 20 | Km 0/5- 1/0 | 187.2 | sqm | |
| 21 | 21 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A | 1 | nos | |
| 22 | 22 | Km 0/5- 1/0 | 234 | cum | |
| 23 | 23 | Collection and Supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc., complete, for SHOULDERS. | 1 | nos | |
| 24 | 24 | Km 0/5- 1/0 | 41.6 | cum | |
| 25 | 25 | Providing and laying 75mm compacted thick WBM Gr.II using 1 cum of 63 mm to 22.40 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer. | 1 | nos | |
| 26 | 26 | Km 0/5- 1/0 | 78.33 | cum | |
| 27 | 27 | Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer. | 1 | nos | |
| 28 | 28 | Km 0/5- 1/0 | 78.33 | cum | |
| 29 | 29 | Applying TACK COAT over WMM surface at 4.00Kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete | 1 | nos | |
| 30 | 30 | Km 0/5- 1/0 | 1044.38 | sqm | |
| 31 | 31 | Providing, laying and rolling of open- graded premix carpet of 20 mm thick composed of 13.2 mm to 5.60 mm aggregates eithe using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity , finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508. | 1 | nos | |
| 32 | 32 | Km 0/5- 1/0 | 1044.38 | sqm | |
| 33 | 33 | Provision for HM stones | 1 | no | |
| 34 | 34 | Provision for Name boards | 1 | no | |
| 35 | 35 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}\n(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount |
AI Tender Summary
Tender Timeline
Nov 19, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedNov 25, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 25, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender