| 1 | 1 | 1)Renewal & Strengtheing the Black Topping Karunkulam Sanganapuram Road KM 0/0-2/0.800 Road Code R112 Therku Karungulam Panchayat in Valliyoor Panchayat Union, Tirunelveli District. | | | |
|---|
| 2 | 2 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | | 2046.06 | sqm |
|---|
| 3 | 3 | Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications. | | 1250 | sqm |
|---|
| 4 | 4 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | | 1534.54 | cum |
|---|
| 5 | 5 | Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.Km 0/0-1/0 | | 183.26 | cum |
|---|
| 6 | 6 | Km 1/0 - 2/080 | | 243 | cum |
|---|
| 7 | 7 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | | 468.75 | cum |
|---|
| 8 | 8 | Advance Bituminous patch work (Average thickness of of 50mm) with 45mm IRC HBG metal premixed with 44kg of Bitumen including cost and conveyance of metal from approved quarry, cost of bitumen, labour charges for leveling, tamping etc., complete complying with standard specification. | | 8.15 | cum |
|---|
| 9 | 9 | Km 1/6 - 2/080 | | 2.08 | cum |
|---|
| 10 | 10 | Advance Bituminous patch work (Average thickness of of 25mm) with 13.2mm IRC HBG metal premixed with 44kg of Bitumen including cost and conveyance of metal from approved quarry, cost of bitumen, labour charges for leveling, tamping etc., complete complying with standard specification. | | 3.81 | cum |
|---|
| 11 | 11 | Km 1/6 - 2/080 | | 2.69 | cum |
|---|
| 12 | 12 | 10(c).Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | | 3750 | sqm |
|---|
| 13 | 13 | Providing and laying TACK COAT over the BT surface using 3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | | 4050 | sqm |
|---|
| 14 | 14 | 10(d).Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | | 4050 | sqm |
|---|
| 15 | 15 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type \"A\" using 0.09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN vibrator roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete (Using Paver Finisher & Vibrator Roller)\n\n | | 7800 | sqm |
|---|
| 16 | 16 | Provision for Hectametre stone of size 0.75mx0.23mx0.10m | | 8 | nos |
|---|
| 17 | 17 | Provision for Kilometre stone of size 1.65mx0.45mx0.15m | | 2 | nos |
|---|
| 18 | 18 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package}\n(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | | 1 | GST Amount |
|---|