Estimate For The Cost Of 20 Mother Bed Raising And Matc . Of 30000 Misc . Species Basketted Seedlings For Lalam Block At Panakkachira In Social Forestry Range Ponkunnam During 2019-20 And 20-21 Formation Of 20 Mother Bed Raising And Mtc . 30000 Misc .
Tender Overview
Project Description
Estimate For The Cost Of 20 Mother Bed Raising And Matc . Of 30000 Misc . Species Basketted Seedlings For Lalam Block At Panakkachira In Social Forestry Range Ponkunnam During 2019-20 And 20-21 Formation Of 20 Mother Bed Raising And Mtc . 30000 Misc . Species
BOQ
| Name of Work: Estimate for the cost of Formation of 20 mother beds, raising and maintenance of 30000 miscelleneous species basketted seedlings for Lalam Block at panakkachira in Ponkunnam Social Forestry Range During 2019-20 &20-21 | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Clearing the area for formation of beds(Modarate growth) for formation of mother bed | 0.172 | Ha | |
| 2 | 2 | Preparation of standerd seed beds of size 12mx1.2m for sowing seeds | 20 | Bed | |
| 3 | 3 | Cost of dried Cow dung including transportation (for 20 mother bed) | 2 | M3 | |
| 4 | 4 | Cost of seed including Transportation | 20 | Bed | |
| 5 | 5 | Sowing seeds in nursery beds and covering with straw etc. and removing cover after germination | 20 | Bed | |
| 6 | 6 | Cost of staw for mulching including transporting charges | 20 | Bed | |
| 7 | 7 | Watering mother beds twice daily for first 30 days(12x1.2x30x17) | 8640 | M2/day | |
| 8 | 8 | Watering mother beds once daily for next 30 days(12x1.2x30x17) | 8640 | M2/day | |
| 9 | 9 | Providing shade panthal for nursery beds excluding seniourage of materials(if used at site) | 10 | Bed | |
| 10 | 10 | Cost of materials for shade panthal | 10 | Bed | |
| 11 | 11 | Weeding mother bed as and when necessary | 12 | Bed | |
| 12 | 12 | Fencing around the nursery including collection of meterials(if done freshly only and asper actuals | 200 | RM | |
| 13 | 13 | Clearing the area for formation of beds(Modarate growth) forbasketted bed | 0.102 | Ha | |
| 14 | 14 | Cost of river sand including cost of transportation for making potting mixture including cost of transportation( to measured at site) | 1.8 | M3 | |
| 15 | 15 | Cost of dried Cow dung for making potting mixture including transportation | 3.6 | M3 | |
| 16 | 16 | Cost of coir pith compost including cost of transportation for making potting mixture | 1.8 | M3 | |
| 17 | 17 | Cost of ecofriendly printed non plastic seedlings bags | 3000 | No | |
| 18 | 18 | Cost of printed poly bags 12cmx18cm size with 100 gage thickness made of vergin plastic(22500) | 75 | kg | |
| 19 | 19 | Seiving of soil 7 mixing with cow dung, river sand and coirpith compost for filling in ply bags | 30000 | Bag | |
| 20 | 20 | Filling poly bag 12x18cm and watering to facilitate planting | 30000 | Bag | |
| 21 | 21 | Cost of new poyethene sheet for spreading on beds before stacking ply bags | 22 | Kg | |
| 22 | 22 | Providing platform by making support on all seeds of bed and arrange them properly in the dardenig area | 12 | Bed | |
| 23 | 23 | Pulling out seedlings from mother bed and transplanting in to poly bags | 30000 | Bag | |
| 24 | 24 | Providing shade panthal for necessary beds including seniourage of materials | 12 | Bed | |
| 25 | 25 | Cost of materials /Shade net for shade panthal | 12 | Bed | |
| 26 | 26 | Watering basketted bed twice daily for first 30 days(12x1.2x30x10) | 5184 | M2/day | |
| 27 | 27 | Watering basketted bed oncedaily for next 30 days(12x1.2x30x10) | 5184 | M2/day | |
| 28 | 28 | Watering basketted beds on alternative days for next 60 days(30 effective watering days) | 5184 | M2/day | |
| 29 | 29 | Watering basketted beds once in three days for next 30days(10 effective watering days) | 1728 | M2/day | |
| 30 | 30 | Weeding basketted beds as and when necessary | 6 | Bed | |
| 31 | 31 | Collection of forest soil for filling in poly bags | 12.8 | M3 | |
| 32 | 32 | Engaging man mazdoor for clearing and cleaning the nursery site before handing over/ completion of the transportation and arranging Root trainer tray | 1 | MM | |
| 33 | 33 | VDA | 758.72 | MM | |
| 34 | 34 | Cost of nursery board with frame and mount ( 6'x4' size) | 1 | No | |
| 35 | 35 | Cost of Species board for each set of species | 25 | No | |
| 36 | 36 | Contingencies | 1 | LS | |
| 37 | 37 | Contactor profit (10%) | 1 | LS |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender