| 1 | 1 | Clearing the area for formation of beds(Modarate growth) for formation of mother bed | | 0.172 | Ha |
|---|
| 2 | 2 | Preparation of standerd seed beds of size 12mx1.2m for sowing seeds | | 20 | Bed |
|---|
| 3 | 3 | Cost of dried Cow dung including transportation (for 20 mother bed) | | 2 | M3 |
|---|
| 4 | 4 | Cost of seed including Transportation | | 20 | Bed |
|---|
| 5 | 5 | Sowing seeds in nursery beds and covering with straw etc. and removing cover after germination | | 20 | Bed |
|---|
| 6 | 6 | Cost of staw for mulching including transporting charges | | 20 | Bed |
|---|
| 7 | 7 | Watering mother beds twice daily for first 30 days(12x1.2x30x17) | | 8640 | M2/day |
|---|
| 8 | 8 | Watering mother beds once daily for next 30 days(12x1.2x30x17) | | 8640 | M2/day |
|---|
| 9 | 9 | Providing shade panthal for nursery beds excluding seniourage of materials(if used at site) | | 10 | Bed |
|---|
| 10 | 10 | Cost of materials for shade panthal | | 10 | Bed |
|---|
| 11 | 11 | Weeding mother bed as and when necessary | | 12 | Bed |
|---|
| 12 | 12 | Fencing around the nursery including collection of meterials(if done freshly only and asper actuals | | 200 | RM |
|---|
| 13 | 13 | Clearing the area for formation of beds(Modarate growth) forbasketted bed | | 0.102 | Ha |
|---|
| 14 | 14 | Cost of river sand including cost of transportation for making potting mixture including cost of transportation( to measured at site) | | 1.8 | M3 |
|---|
| 15 | 15 | Cost of dried Cow dung for making potting mixture including transportation | | 3.6 | M3 |
|---|
| 16 | 16 | Cost of coir pith compost including cost of transportation for making potting mixture | | 1.8 | M3 |
|---|
| 17 | 17 | Cost of ecofriendly printed non plastic seedlings bags | | 3000 | No |
|---|
| 18 | 18 | Cost of printed poly bags 12cmx18cm size with 100 gage thickness made of vergin plastic(22500) | | 75 | kg |
|---|
| 19 | 19 | Seiving of soil 7 mixing with cow dung, river sand and coirpith compost for filling in ply bags | | 30000 | Bag |
|---|
| 20 | 20 | Filling poly bag 12x18cm and watering to facilitate planting | | 30000 | Bag |
|---|
| 21 | 21 | Cost of new poyethene sheet for spreading on beds before stacking ply bags | | 22 | Kg |
|---|
| 22 | 22 | Providing platform by making support on all seeds of bed and arrange them properly in the dardenig area | | 12 | Bed |
|---|
| 23 | 23 | Pulling out seedlings from mother bed and transplanting in to poly bags | | 30000 | Bag |
|---|
| 24 | 24 | Providing shade panthal for necessary beds including seniourage of materials | | 12 | Bed |
|---|
| 25 | 25 | Cost of materials /Shade net for shade panthal | | 12 | Bed |
|---|
| 26 | 26 | Watering basketted bed twice daily for first 30 days(12x1.2x30x10) | | 5184 | M2/day |
|---|
| 27 | 27 | Watering basketted bed oncedaily for next 30 days(12x1.2x30x10) | | 5184 | M2/day |
|---|
| 28 | 28 | Watering basketted beds on alternative days for next 60 days(30 effective watering days) | | 5184 | M2/day |
|---|
| 29 | 29 | Watering basketted beds once in three days for next 30days(10 effective watering days) | | 1728 | M2/day |
|---|
| 30 | 30 | Weeding basketted beds as and when necessary | | 6 | Bed |
|---|
| 31 | 31 | Collection of forest soil for filling in poly bags | | 12.8 | M3 |
|---|
| 32 | 32 | Engaging man mazdoor for clearing and cleaning the nursery site before handing over/ completion of the transportation and arranging Root trainer tray | | 1 | MM |
|---|
| 33 | 33 | VDA | | 758.72 | MM |
|---|
| 34 | 34 | Cost of nursery board with frame and mount ( 6'x4' size) | | 1 | No |
|---|
| 35 | 35 | Cost of Species board for each set of species | | 25 | No |
|---|
| 36 | 36 | Contingencies | | 1 | LS |
|---|
| 37 | 37 | Contactor profit (10%) | | 1 | LS |
|---|