Repairing And Removing Drainage Line At Various Places In Ward No . 01 Harsul In Corporator Fund . , Excavation For Road Way In Earth Soil With All Rodding And Removing Chock Up Of Existing Drainage Line Including Required Dewatering , Desilting Of Manholes , Desilting The Existing Drainage Line Using Rodding , Removing & Refixing Manhole Cover . Plugging Drainage Line Stacking The Silt As Directed , Controlling Traffic , Providing Lantern , Light Etc . If Required Providing Cautionay/ Warning Traffic Sign Boards , Providing Necessary Security Arrangements , Cleaning Site After Work , Getting Approval For Cleaning Work Etc . Comp . Mjp Dsr Page No . As Per Analysis Item No . 100Mmdia To 250Mm Dia Rcc/Seg Pipe , 100Mm Dia To 250Mm Dia Rcc/ Swg Pipe , 250Mm Dia To 450Mm Dia Rcc/ Swg Pipe , Excavation For Foundation/ Pipe Line Trenches In Earth Soil Of All Types , Sand , Gravel And Soft Murum , Including Removing The Excavated Material Upto A Distance 50 Mtr . & Lift As Below , Stacking And Spreading As Directed , Normal Dewatering Preparing The Bed For Foundation And Excluding Backfilling Etc . Comp . ( Bd-A-1/259 ) Lift 0 To 1 . 50M Mjp/ Dsr 2018-2019 , Excavation For Foundation/ Pipe Line Trenches In Hard Murum Incluing Removing The Excavated Material Upto A Distance 50Mtr . & Lift As Below , Stacking And Spreading As Directed By Engineer In Charge , Normal Dewatering Preparing The Bed For Foundation And Excluding Backfillin Etc . Comp . ( Bd-A-2/259 ) Lift 0 To 1 . 50M Mjp/ Dsr 2018-2019 , Excavation For Pipe Line Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphlat Road Including Removing The Excavated Material Upto A Distance 50M Beyond The Area And Lift As Below Stacking And Spreading As Directed By Engineer In Charge Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling Etc . Comp . ( Bd-A-4259 ) Lift 0 To 1 . 50M Mjp/ Dsr 2018-2019 , Removing Existing Pipe Of The Following Pipe Size Stoneware Pipe/ Rcc Pipes Excluding Cost Of Necessary Excavation And Refilling Of The Trenches , Breaking The Joints , Lifting The Pipes & Stacking To The Place As Directed By Engineer Incharge With All Leads And Lifts Including Cleaning The Surface Etc . Comp . ( Bd-A-1/259 ) Lift 0 To 1 . 50M Mjp Dsr Page No . 33 Item No . 1 , Providing Isi Standard Stoneware Pipes Including All Taxes ( Central And Local ) Inspection Charges , Railway Freight , Unloading From Railway Wagons , Loading Into Trucks , Transport To Departmental Stores , Unloading , Stacking Etc . Complete . ( As Per Mjp Dsr 2015-2016 ) Mjp Dsr Page No . 87 Item No . 1 Section , 9 . 300Mm Dia Swg Pipe , For 250Mm Dia , For 200Mm Dia , Lowring , Laying And Jointing In Proper Grade And Alignment Stoneware Pipes With Cement Joints In C . M . ( 1:1 ) Proportion Of Following Diameters Including Cost Of Conveyance From Store To Site Of Work Jointing Material , Labour , Giving Satisfactory Hydraulic Testing Etc . Complete . Mjp Dsr Page No . Section . 9 Item No . 2 , Page No . 87 , For 250Mm Dia , For 200Mm Dia , Providing And Constructing On Drainage Line B . B . Masonry Circular Manhole , Concentric Cone 0 . 90 Mtrs . Dia At Bottom And 0 . 5 Mtrs . Dia At Tip And Up To A Depth Of 1 . 50 Mtrs . With 23 Cm Thick Brick Work In C . M . 1:6 Prop . With 12Mm Thick Cement Plaster In 1:4 With Smooth Rendering 1:2:4 Coping & Fixing Approved Make And Quality S . F . R . C . Frame & Cover Of 56 Cm Dia Etc . Including All Necessary Excavation & 1:5:10 Bed Cc . Etc . All Complete As Directed By Engineer In Charge ( Rebate For Every Decrease In Depth Of 3 Cm Or Part There Of Rs . 1639/- Per 30 Cm ) Mjp Dsr 2018-2019 , Providing & Supplying Steel Fiber Reinforced Concrete [S . F . R . C . ] Frame & Cover Heavy Duty/ Medium Duty Of Rectangular Of Circular In Shape Of Approved Make Including Loading , Unloading , Transprotation , All Taxes Etc . Complete As Directed By Engineer In Charge . ( 20 Tones Capacity ) Mjp/ Dsr 2018-2019 , Raising The Manhole Chamber With Necessary Brick Work In Cm 1:6 & Plaster Including . . Etc . . Complete ( Per 30 Cm . ) Mjp/ Dsr 2018-2019 , Providing & Repairing To Existing Manhole Chamber After Fixing Pipes With Necessary Brick Work , Benching , Channeling Plastering Etc . Comp . Mjp/Dsr 2018-2019 , Refilling And The Trenches Available Excavatd Stiff With Soft Material First Over Pipe Line And Then Hard Material In 15Cm Layers With All Leads And Lifts Including Consolidation Surcharging , Etc . Comp . , Transport Of Surplus Material From Work Site To Any Disposal Place As Directed By Engineer In Charge With Lead Of -----Km Including And Stacking Etc . Complete . Mjp/ Dsr 2018-2019 Item No . Lead Of 5 . 00Km