Laying Of Rcc Slaw Over Badly Damaged Swd Nala And Laying Of Cc Road At Damaged Locations From Brundavan Hotel To Swamy Vivekanand Hotel Near Bot, Lagbour Office Lane In Gandhi Nagar Ward, Division - 15, Sec-Bad Zone, Ghmc (Rs. 6.05 Lakh) (Reserved For S, HYDERABAD-Telangana

Greater Hyderabad Municipal Corporation-GHMC has published Laying Of Rcc Slaw Over Badly Damaged Swd Nala And Laying Of Cc Road At Damaged Locations From Brundavan Hotel To Swamy Vivekanand Hotel Near Bot, Lagbour Office Lane In Gandhi Nagar Ward, Division - 15, Sec-Bad Zone, Ghmc (Rs. 6.05 Lakh) (Reserved For S. Submission Date for this Tender is 22-11-2019. RCC Road Tenders in HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

22518045
Laying Of Rcc Slaw Over Badly Damaged Swd Nala And Laying Of Cc Road At Damaged Locations From Brundavan Hotel To Swamy Vivekanand Hotel Near Bot, Lagbour Office Lane In Gandhi Nagar Ward, Division - 15, Sec-Bad Zone, Ghmc (Rs. 6.05 Lakh) (Reserved For S
Open Tender
Indian
Telangana
HYDERABAD
22-11-2019

Tender Details

Laying Of Rcc Slaw Over Badly Damaged Swd Nala And Laying Of Cc Road At Damaged Locations From Brundavan Hotel To Swamy Vivekanand Hotel Near Bot, Lagbour Office Lane In Gandhi Nagar Ward, Division - 15, Sec-Bad Zone, Ghmc (Rs. 6.05 Lakh) (Reserved For Sc Lccs Only)

Key Value

Document Fees
Refer document
EMD
INR 5175.0 /-
Tender Value
INR 5.17 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Laying of RCC Slab -- 78.75 1 Cum 188.88 14874.00
Carting of excavated material to a lead of 14 km from the site including labour charges etc., complete.
2 Laying of RCC Slab -- 10.00 1 Rmt. 178.85 1789.00
Carting of excavated material to a lead of 14 km from the site including labour charges etc., complete.
3 Laying of RCC Slab -- 4.00 1 No. 1542.00 6168.00
Supply and delivery of RCC base Frame with size of 0 .90 X 0.90 X 0.20 with load bearing capacity 40 MT made of Vibrated Reinforced Cement Concrete M40 design mix with 430 Kgs Cement/Cum. of Concrete, 20mm normal size Hard Granite Machine Crushed metal @ 0.92 Cum./Cum. of Concrete and sand @ 0.46 Cum./Cum. of Concrete for RCC works including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Seigniorage Charges, and Labour Charges for mixing, centering, laying Concrete tamping, vibrating, lifting, curing, finishing top surface including hire charges of concrete mixing machinery reinforced with High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars and fabrication charges, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,loading and unloadingetc and including transportion charges , Complete for finished item of Work.
4 Laying of RCC Slab -- 4.00 1 No. 2283.00 9132.00
Supply and delivery of RCC Perforated square cover of size 0 .70x 0.70x 0.125 with load bearing capacity 40 MT made of Vibrated Reinforced Cement Concrete M40 design mix with 430 Kgs Cement/Cum. of Concrete, 20mm normal size Hard Granite Machine Crushed metal @ 0.92 Cum./Cum. of Concrete and sand @ 0.46 Cum./Cum. of Concrete for RCC works including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Seigniorage Charges, and Labour Charges for mixing, centering, laying Concrete tamping, vibrating, lifting, curing, finishing top surface including hire charges of concrete mixing machinery reinforced with High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars and fabrication charges, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,loading and unloading .including transpotation charges, Complete for finished item of Work.
5 Laying of RCC Slab -- 40.00 1 Cum 4681.81 187272.00
Supply and placing of the Ready Mix Concrete (RMC) M30 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, centering, shuttering vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, for finished item of work. (M30-360 Kgs) {50% natural river sand + 50% rock sand}
6 Laying of RCC Slab -- 10.00 1 Cum 3917.65 39177.00
Supply and placing of the Ready Mix Concrete (RMC) M10 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, centering, shuttering vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, for finished item of work. (M10-220 Kgs), {50% natural river sand + 50% rock sand}
7 Laying of RCC Slab -- 15.75 1 Cum 6202.11 97683.00
Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete . (M25 with 380 Kgs)
8 Laying of RCC Slab -- 1260.00 1 Kg. 51.62 65041.00
Supplying, fitting and placing HYSD Fe 500 Grade steel for RCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire, chairs, space bars and all labour charges for cutting, bending, placing position, shifting to site, tying etc.. complete where they are not welded
9 Laying of RCC Slab -- 54.00 1 Sqm 88.11 4758.00
Flush Pointing to CRS/Brick Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site, including labour charges on all materials, curing etc., Complete for finished item of work.
10 Laying of RCC Slab -- 2.03 1 Cum 5646.05 11461.00
Plain Cement Concrete M20 nominal mix with 20mm metal with concrete mixture, using 400kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing including hire charges of machinary but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum {50% natural river sand + 50% rock sand}
11 Laying of RCC Slab -- 12.15 1 Cum 3736.97 45404.00
Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum
12 Laying of RCC Slab -- 36.75 1 Cum 216.58 7959.00
Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). (manual means)
13 Laying of RCC Slab -- 42.00 1 Cum 638.22 26805.00
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail