Defence Government Departments Closing in 0 days TDR #22486836

Tender For Offloading Of Nr Of Sullage Barge V For A Total Duration Of 150 Days Scheduled W.E.F. 01 Jan 2020 (Inclusive Of 60 Days Docking Period)

Issued by Government Departments · NAVAL DOCKYARD VISAKHAPATNAM, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
05 Dec 2019
0 days left
EMD
7.86 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
NAVAL DOCKYARD VISAKHAPATNAM → Andhra Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Offloading Of Nr Of Sullage Barge V For A Total Duration Of 150 Days Scheduled W.E.F. 01 Jan 2020 ( Inclusive Of 60 Days Docking Period ) -1 Work Pakage For Nr Sb-V N Hull Defect List N001 Ndocking Nvessel To Be Docked In Both Versions. Nnote 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises ( I.E Nd ( V ) Slipway / Drydock ) . Nnote 2:- Last Docked In Version I On 22 Aug B1542017 2 002 Ncleaning Of Under Water Hull And Boot Top Area Nhp Jet Cleaning Of Entire Under Water Area And Boot Top Area ( With A Pressure Not Exceeding 3000 Psi ) Remove The Marine Growth / Barnacles And Prepare For Survey. Nnote:- ( I ) U / W Area: 425 Sqm Including Boot Top 3 003 Ncleaning Of Internal Compartments - Sullage Tanks ( 06 Nos ) Nmanually Clean Fuel Tanks Free Of Accumulated Fuel And Residual Muck And Present For Survey. 4 004 Ncleaning Of Internal Compartments Nmanually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey. ( A ) Cable Locker 5 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey. ( B ) Forepeak Tank 6 004 Ncleaning Of Internal Compartments Nmanually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( C ) Cofferdam 1 7 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( D ) Cofferdam 2 8 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( E ) Cofferdam 3 9 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( F ) Cofferdam 4 10 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Oily Water And Grime / Muck And Present For Survey:- ( G ) Pump Room ( Bilges: 120 Sqm, Bulkheads:140 Sqm ) 11 004 Cleaning Of Internal Compartments - Asp Manually Clean Following Internal Compartments Free Of Accumulated Oily Water And Grime / Muck And Present For Survey:- ( H ) Steering Gear Room ( Bilges: 24 Sqm, Bulkheads:76 Sqm ) 12 05 Cleaning Of Void Spaces ( 06 Nos ) Manually Clean 06 Nos Void Spaces Of All Residues And Present For Survey. Note: Cleaning To Be Done With Detergent Water, Oil Absorbing / Removing Solution Or Powder, Rags, Cotton Jute Etc. Quote To Include Cost Of Cleaning Material Also. 13 006 Hull Survey - Visual Survey External And Internal Structures Carry Out Visual And Hammer Survey In Accordance With No 01 / 15 Of Under Water Hull , Boot Top Area, Above Water Hull, Super Structure, Weather Decks And All Internal Compartments ( I.E. Fw Tanks, Ballast Tanks, Fore Peak Tank, Engine Room, Steering Compartment, Fo Tanks, Cofferdams, All Stiffeners And Deck Fittings Etc. ) All Manholes To Be Inspected For Water Tightness, Chalk Impression Test To Be Carried Out. Note:- ( I ) Ls For Survey ( Ii ) Firm To Submit 07 Copies Of Hull Survey Report . 14 007 Hull Survey - Utg Survey External And Internal Structures Carry Out Utg Survey In Accordance With No 01 / 15 Of Under Water Hull , Boot Top Area, Above Water Hull, Super Structure, Weather Decks And All Internal Compartments ( I.E. Fw Tanks, Ballast Tanks, Fore Peak Tank, Engine Room, Steering Compartment, Fo Tanks, Cofferdams, All Stiffeners And Deck Fittings Etc. ) All Manholes To Be Inspected For Water Tightness, Chalk Impression Test To Be Carried Out. Note:- ( I ) Ls For Survey ( Ii ) Firm To Submit 07 Copies Of Hull Survey Report . ( Iii ) Quote For Utg Survey Points 15 008 Steel Renewal Nquote For Steel Renewal At Various Locations As Per Survey Report Nnote :- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Is 2062 Grade `B’ Quality Steel. Degutting / Regutting / Renewal Of All Obstructions In Way Of Steel Renewals Including Lagging / Panelling, Minor Fittings / Equipments With Their Foundations, Ventilation Systems, Staging Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Was Undertaken Etc. 16 009 Build Ups N ( A ) Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor Size 25 X 25 Mm 17 009 Build Ups N ( B ) Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor Size 50 X 50 Mm 18 010 Fairing Of Deformed Structure N Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team / Surveyor 19 011 Re-Welding Ncarry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team / Qc / Rmt. 20 012 Draft Marks Ndraught Marks Corroded / Eaten Away, To Be Renewed And Painted. Both Roman And Numeric. 21 013 Sacrificial Anodes N ( A ) Renew Sacrificial Anodes Those Consumed More Than 50% Type: Mk-I Note:- Anodes Will Be Supplied By Navy / Coy. 22 013 Sacrificial Anodes N ( B ) Renew Sacrificial Anodes Those Consumed More Than 50% Type: Mk-Vi Note:- Anodes Will Be Supplied By Navy / Coy. 23 014 Surface Preparation Under Water Area Nsurface Preparation To Sa 2.5 Std Using Grit Blasting On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. ( Areas Include C Channel For Rubber Fenders ) 24 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns 25 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns 26 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns 27 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns 28 015 Painting Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns 29 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Seaquantum Ultra ( Red Brown / Dark Red ) - 150 Microns 30 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns 31 016 Surface Preparation Boot Top Area Nsurface Preaparation To Sa 2.5 Standards Using Grit Blasting On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. ( Areas Include C Channel For Rubber Fenders ) 32 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 33 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns Dft 34 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns Dft 35 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns Dft 36 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns Dft 37 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Seaquantum Ultra ( Red Brown / Dark Red ) - 150 Microns Dft 38 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Black ) - 150 Microns Dft 39 018 Surface Prepartion Above Water Area And Bulwark Including Guardrails Carry Out Mechanical Cleaning To St3 Standard For Paint Application As Per Survey Report By Paint Oem Rep 40 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( A ) 1St Coat: Penguard Primer - 50 Microns Dft 41 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Jotamastic 80 ( Grey / Red Brown ) - 125 Microns Dft 42 019 Painting- Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Jotamastic 80 ( Grey / Red Brown ) - 125 Microns Dft 43 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( D ) 4Th Coat: Hard Top Xp Grey - 60 Microns Dft 44 020 Surface Prepartion Super Structure And Deck Fittings Carry Out Mechanical Cleaning To St3 Standard As Per Survey Report Of Paint Oem For Paint Application. 45 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 46 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Jotamastic 80 ( Red ) - 125 Microns Dft 47 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Jotamastic 80 ( Grey ) - 125 Microns Dft 48 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( D ) 4Th Coat: Hard Top Xp Grey 7040- 60 Microns Dft 49 022 Surface Prepartion Weather Decks Carry Out Hydro-Jet Blasting Of Entire Weather Deck, Bridge Deck And Flag Deck To Sa 2.5 Standards. 50 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 51 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Jotamastic 87 - 150 Microns Dft 52 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Jota Armour -800 Microns Dft 53 024 Surface Prepartion Internal Compartments - Fore Peak Tank, Cable Locker And Cofferdam Carry Out Mechanical Cleaning To St 3 Standard As Per Survey Report Of Paint Oem For Fore Peak Tank , Cable Locker And Cofferdam ( 04 ) . 54 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 55 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Anticorrosive - Balloxy Hb Light ( Bieze ) - 150 Microns 56 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Anticorrosive - Balloxy Hb Light ( Grey ) - 150 Microns 57 026 Surface Prepartion Internal Compartments - Pump Room And Asp Compartment Including Bilges Carry Out Mechanical Cleaning To St 3 Standard As Survey Report Of Paint Oem For Paint Application. ( I ) Pump Room ( Bilges-120 Sqm, Bulkheads-140 ) ( Ii ) Asp ( Bilges-24 Sqm, Bulkheads-76 ) 58 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 59 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anticorrosive - Jotacote Universal ( Aluminium ) - 150 Microns 60 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anticorrosive - Jotacote Universal ( Grey ) - 150 Microns 61 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Penguard Top Coat - 50 Microns. 62 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 63 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Interior Fire Retardent Paint-100 Microns 64 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Interior Fire Retardent Paint-100 Micron 65 029 Cleaing Of Ru Tanks Cleaning Of Fuel Oil Ru Tanksmanually Scrap And Clean To Bare Metal And Apply Two Coats Of Om 750 Oil In Following Tanks: Fuel Oil Ru Tanks ( 02Nos ) Note:- Quoted Cost Shall Be Inclusive Of Cost Of Oil Also. 66 030 Surafce Prepartion Bulkheads, Decks And Dadoes Of Internal Compartments Carry Out Mechanical Cleaning Of All Stores ( Naval Stores, Battery Stores, Co2 Room, Paint Stores, Pump Store, Deck Store And Eletrical Control Room ) To St 3 Standard As Survey Report Of Paint Oem For Paint Application. 67 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( A ) 1St Coat: Primer - Penguard 1X50 Microns 68 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( B ) 2Nd Coat : Jotamastic 80 Grey -1 X 150 Microns 69 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( C ) 3Rd Coat ; Burnswick Green Finishing Paint-100 Microns 70 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( A ) 1St Coat: Primer - Penguard 1X50 Microns 71 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 1St Coat: Interior Fire Retardent Paint-100 Microns 72 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 2Nd Coat: Interior Fire Retardent Paint-100 Microns 73 033 Surface Preaprtion Void Spaces Carry Out Surface Preaprtion To St 3 Standards Of Void Spaces As Survey Report Of Paint Oem For Paint Application. 74 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( A ) 1St Coat- Penguard Primer- 50 Microns 75 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( B ) 2Nd Coat Coat-Jotacoat Universal ( Al ) - 150 Microns 76 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( C ) 2Nd Coat Coat-Jotacoat Universal ( Grey ) - 150 Microns 77 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( D ) 3Rd Coat T-Penguard Top Coat- 50 Microns 78 035 Surface Preaprtion Sullage Tanks Carry Out Surface Preaprtion To St 3 Standards Of All Sullage Tanks / Fuel Tanks As Survey Report Of Paint Oem For Paint Application. 79 036 Painting Sullage Tanks - Jotun Paint Scheme Paint All Sullage Tanks With Following Paint Scheme:- ( A ) Tankguard Hb Light Grey - 150 Microns 80 036 Painting Sullage Tanks - Jotun Paint Scheme Paint All Sullage Tanks With Following Paint Scheme:- ( B ) Tankguard Hb Greyish Green - 150 Microns 81 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. Nnote : -The Job Involves Removal Of Anchors, Chain Cables And Accessories, Laying Out For Cleaning, Painting And Refitment. ( A ) Anchors - 03 82 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. ( B ) Chain Cable ( Dia 17.5Mm ) ( I ) Full Shackles- 08 ( Ii ) Half Shackles- 04 83 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( C ) Swivel Piece 84 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( D )  Lug Less Joining Shackles 85 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( E ) D - Shackles 86 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. ( F ) Chain Stopper / Compressor 87 038 Anchor Windlass Completely Strip & Overhaul Anchor Windlass, Renew Brake Linings, Refit And Prove For Satisfactory Operation. Quoted Price To Include Cost Of Liners And Spares Also. 88 039 Bollards ( A ) Twin Bollard And Foundation Corroded And Thinned. To Be Repaired / Renewed As Per Hull Survey Report. Doubler Plate Area-420Mmx420mm, Dia Of Pipe-219.1Mm, Height-1460Mm, Foundation Area-400Mmx400mmx90mm, Thickness Of Plate-10Mm Towing Gear Securing Rod Dia-50Mm. 89 039 Bollards ( B ) Towing Bollard And Foundatiosn Corroded And Thinned. To Be Repaired / Renewed As Per Hull Survey Report. Doubler Plate Area-420Mmx420mm, Dia Of Pipe-219.1Mm, Height-1460Mm, Foundation Area-400Mmx400mmx90mm, Thickness Of Plate-10Mm Towing Gear Securing Rod Dia-50Mm. 90 040 Guardrails ( A ) Fixed Verticals Guardrail Stanchions On Weather Deck Deformed / Bent From Deck. To Be Repaired / Renewed. ( Mat-Ms Angle Bar ) 91 040 Guardrails ( B ) Fixed Horizontal Guardrails On Weather Deck Deformed / Bent To Be Repaired / Renewed. ( Mat-Ms ) 92 041 Metallilc Chain Guardrails Metallic Chain Guardrails Of Stanchions Corroded To Chipped And Cleaned. Nrenewal Cost Should Include Cost Of Material Also. 93 042 Sanitry Sysytem Soil Pipes To Be Removed, Chemically Cleaned, Pressure Tested And Fitted Back In Situ. Mat: Ms , Dia: 04Inch. ( Pressure: 3Kg / Cm2 ) 94 043 Ventilation ( A ) Mushroom Type Natural Exhaust Ventilator To Be Removed, Cleaned / Overhauled And Fitted Back. Renew If Required. Details- Mush Room Head Dia-500 Mm, Height-1550 Mm 95 043 Ventilation ( B ) Mushroom Type Forced Supply Ventilator To Be Removed, Cleaned / Overhauled And Fitted Back. Renew If Required. Details- Mush Room Head Dia-370 Mm, Height-1550 Mm, 96 044 Drainage System Drain Pipe Leading From Mast Deck To 01 Deck And No. 1 Deck To Engine Room Corroded, Thinned And Holed, To Be Renewed. Mat: Gi, 03 Inch Dia. 97 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( A ) Ss Wash Basin To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. ( A ) Wash Basin 98 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. Sanitry Fittings In Crew Bathrooms And Wc To Be Renewed. ( B ) Provision Ss Tap: 1 / 2 Inch 99 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( C ) Ss Supply Pipeline Broken / Damaged To Be Renewed / Repaired. Mat : Cu-Ni, Dia: ½ Inch 100 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( D ) Drain Pipeline Broken / Damaged To Be Renewed / Repaired. Mat-Ms, Dia- 2 Inch 101 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( E ) Flush Valves To Be Renewed. Mat - Brass, Dia - 2 102 046 Fresh Water System Crew Bathrooms And Wc. .Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. ( A ) Ss Stop Cock 1’’ To Be Renewed 103 046 Fresh Water System Crew Bathrooms And Wc. ( B ) Shower Head To Be Fitted In Bathrooms Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. 104 047 Tyre Fenders Tyre Fender Damaged On P&S Side , To Be Renwed With Used Aircraft Tyre Fenders Moulded With 8 Mm White Natural Rubber. Mat- Rubber, Colour-White . No Painting Or Coating Of Any Other Form Will Be Permitted. Vendors To Adhere To Sow ( A ) Od 750Mm; Id 450 Mm , Width - 250 Mm 105 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side. ( B ) Chain Securing Brackets / Deck Eyes. 106 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( C ) Provission Of Securing Chain. 16 Mm Dia For Tyre Fenders 107 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( D ) Bush For Passing Chain On Tyres. 108 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( E ) Provision Of D Shackles For Tyre Fenders 109 048 D Shape Fenders ( A ) D Shaped Rubber Fenders Damaged / Perished To Be Renewed. Color - Grey / White Length - 1000 Mm Length Location - 44 On Shipside And 05 On Transom Material - Epdm Rubber As Per Nes170 110 048 D Shape Fenders Securing Brackets ( B ) Fender Securing Flat Bar Brackets To Be Repaired / Renewed As Necessasry. ( Mat- Ms ) . Size : 1100Mm X 110Mm X 08Mm 111 048 D Shape Fenders Securing Brackets ( C ) Fender Securing C Clamp Brackets To Be Repaired / Renewed As Necessasry. ( Mat- Ms ) . Size : 200Mm X 110Mm X 08Mm 112 049 Pneumatic Fender. ( A ) Provision Of Pneumatic Fender On ( P & S ) Side At Fwd And Aft Nspecification Of Fenders:- Size - 660X1160 Mm , Mat-Neoprene Blended Rubber Having 65 % Min Neoprene Content , Colour-White, Tensile Strength- 180 Kgf / Cm2, Elongation At Break- 400 % Min, Hardness- 700 Max, Tear Strength- Min 40 Kgf / Cm2, Compression Set- 30 % Max, Abrasion Resistance- 0.5 Cc Max. N 113 050 Pneumatic Fender Securing Arrangement ( A ) Fabrication Of Ms Eye With 08 Mm Thickness On Shipside. 114 050 Pneumatic Fender Securing Arrangement ( B ) Provision Of D Shackles, Dia 16 Mm 115 050 Pneumatic Fender Securing Arrangement ( C ) Provision Of Securing Chain 16 Mm Dia Length Rmt 4 Mtr Each 116 051 Sky Light Ss Butterfly Nuts And Tumbler Bolt Of Engine Room Sky Light &Exhaust Flaps Broken. To Be Renewed. Dia Of Bolt : 10 Mm & 6 Inch Length ( Mat-Ms ) . 117 052 Rubber Beading Rubber Beading Of Following Doors, Hatch And Skylight Perished / Cracked To Be Renewed And Chalk Test To Be Proved. ( Epdm Rubber With Shore Hardness 50 + 5O A ) ( A ) Wt Door 118 052 Rubber Beading Rubber Beading Of Following Doors, Hatch And Skylight Perished / Cracked To Be Renewed And Chalk Test To Be Proved. ( Epdm Rubber With Shore Hardness 50 + 5O A ) ( B ) Wt Hatch 119 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( A ) Forepeak Tanks 120 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( B ) Fuel / Sullage Tank 121 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( C ) Void Space 122 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( D ) Cable Locker 123 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( E ) Cofferdams 124 054 Bilge Paltform ( A ) Renew Bilge Platform Plate. Material- Aluminium Chequerd Plate, Thickness- 05 Mm 125 054 Bilge Platform ( B ) Supporting Brackets To Be Renewed Where Ever Required ( Mat - Ms ) . Securing Nut&Bolts To Be Of Mat-Ss. 126 055 Cleats Ms Cleats Perished / Thinned To Be Renewed ( Size-28 Mm ) . Quote Shall Includes Nuts Bolts And Associated Accessories 127 056 Ventilation System ( A ) Breather Pipes Of Various Tanks On Upper Deck Corroded And Thinned Including Wire Mesh, To Be Repaired / Renewed. ( Mat. Gi Pipe ) Pipe Dia 2 1 / 2 Inch 128 056 Ventilation System ( B ) Deck Distance Piece And Flanges Corroded To Be Renewed Including Rubber Joints. Dia 150Mm 129 056 Ventilation System ( C ) Ventilation Trunking Wire Mesh To Be Renewed At Damaged Areas. Size: 400Mmx600mm 130 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 131 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways.. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 132 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways.. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 133 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 134 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 135 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 136 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 137 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 138 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 139 060 Wt Hatches Wt Hatch Clips To Be Removed, Cleaned, Greased And Refitted Wt Hatch ( 0.6M X 0.6M ) 140 061 Wt Doors Wt Door Clips To Be Removed, Cleaned, Greased And Refitted Wt Doors 141 062 Nwt Nwt Wooden Door Of Wheel House Perished, To Be Repaired / Renewed Including Cylindrical Door Lock. 142 063 Manhole Rubber Joints Perished, To Be Renewed ( A ) Joints 143 063 Manhole ( B ) Studs Of Manholes Perished, To Be Renewed ( Only Defective Studs To Be Renewed As Per Survey Report ) Ms Studs With Nut, Size 20 Mm 144 063 Manhole ( C ) Manhole Covers Corroded / Thinned. To Be Renewed. Mat - Is 2062 Grade B Steel. Size - 2 X 1.5 145 064 Locking Arrangment ( A ) Mortise Locks In Accomodation Areas Defective To Be Renewed. 146 064 Locking Arrangment ( B ) Ms Hasp Staple / Locking Arrangemet On Ms Door And Hatches Corroded / Broken / Damaged To Be Renewed As Per Sample Fitted. 147 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( A ) Repair / Renewal Of Vessel Name Board Including Electroplating To Be Carried Out On Ship Side -02 148 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( B ) Vessel Illuminated Board With Perspex Sheet - 01 149 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( C ) Painting Of Vessel Name On Bulwark / Ship Side In Both Hindi And English With Fluorescent Paint -02 150 066 Furniture ( A ) Crca Kit Lockers Perished , To Be Renewed ( 90X80x45 Cm ) 151 066 Furniture ( B ) Crca Standing Lockers Perished, To Be Renewed ( 183X40x45 Cm ) 152 066 Furniture ( C ) Chairs In Crew Accomadation Persihed / Damaged , To Be Renewed 153 066 Furniture ( D ) Wooden Table Damaged / Pershed To Be Renewed 154 066 Furniture ( E ) Wood Paneling In Crew Rest Room And Wheel House Damged / Perished, To Be Renewed 155 Engineering Defect List N Nsullage Pump Engine, Make:-M / S Greaves, Model:-3Twa, Type:- ( Air Cooled, 4-Stroke, Vertical Inline, Diesel Fuelled ) , Sl No:- ( Port 1108031010027, Stbd-1108031010026 ) Rating:-25Hp, Rpm:-1500 156 1001 Nsullage Pump Engine N ( A ) Renewal Of Flexible Hoses ( En 853 2Sn Wire Braid, Dia 15 Mm, With St 1 / 4 Inch, Unf Male X Banjo 157 1001 Nsullage Pump Engine ( B ) Air Intake Filter To Be Renewed ( Part No. 271-3700-14 ) 158 1001 Nsullage Pump Engine ( C ) Renewal Of Engine Oil, Oil Will Be Supplied By Navy 159 1001 Nsullage Pump Engine ( D ) Renewal Of Corrosion Plug As Per Sample ( Dia - 10 Mm, Length- 40 Mm ) 160 1001 Nsullage Pump Engine ( E ) Renew Fuel Oil Filters Elements . ( Part No. 9451 037 401& 9451 037 420 ) 161 1001 Nsullage Pump Engine ( F ) Renewal Of Oil Filter ( Part No.500-2175-19 ) 162 1001 N Sullage Pump Engine ( G ) Engine To Be Started For Trial For 30 Minutes. 163 Sullage Pump Make:-M / S Tushaco Pump, Type:-Progressive, Cavity Screw, Model:-T1s 1450.1, Sl No:- ( Port 105182 / 5212, Stbd 105182 / 5211 ) , Capacity:-60Tph, Total Head-15Mwc, Speed-300Rpm 164 1002 N Sullage Pump ( A ) Overhauling Of Pumps To Be Done. Includes Removal, Renewal Weardown Parts And Fit Back. 165 1002 Nsullage Pump ( B ) Performance Trial For 30 Minutes Post Overhauling. 166 Stripping Pump Engine, Make:-M / S Greaves, Type:-Air Cooled, 4-Stroke, Electric Start Diesel Engine, Speed:-3000Rpm, Rating:-7.4Bhp, Sl No:- ( Port-A0l0403225, Stbd-A0l0403224 ) 167 1003 Nstripping Pump Engine ( A ) Lub Oil Sump To Be Drained, Cleaned. ( Sump Capacity 5 Liters ) 168 1003 N Stripping Pump Engine ( B ) Renew Air Filter Element 169 1003 N Stripping Pump Engine ( C ) Renew Fuel Oil Filters Element . 170 1003 N Stripping Pump Engine ( D ) Engine To Be Started For Trial For 30 Minutes. 171 Stripping Pump Make:-M / S B E Pump, Model:-Sh80-140N1-Dgs2-316, Type:-Horizontal, Self-Priming, Centrifugal, Capacity:-60Tph, Total Head:-15Mwc, Sl No:-Port-358898, Stbd-358899. 172 1004 Nstripping Pump ( A ) Overhauling Of Pumps Includes Removal, Renewal Weardown Parts ( Shaft, Mechanical Seals, Impeller, Gaskets ) And Fitted Back. 173 1004 Nstripping Pump ( B ) Performance Trial For 30 Minutes Post Overhauling. 174 Genset Make:-Kirloskar, Type:-Ha394, Sl No:-03.2017 / 1021253, Rating:-23.55Kw, 32Hp 175 1005 N Diesel Generator N ( A ) Renewal Of Flexible Hoses ( En 853 2Sn Wire Braid, Dia 15 Mm, With St 1 / 4 Inch, Unf Male X Banjo ) 176 1005 N Diesel Generator N ( B ) Air Intake Filter To Be Renewed. 177 1005 N Diesel Generator ( C ) Renewal Of Engine Oil Qty-10Ltr, Oil Will Be Supplied By Navy 178 1005 N Diesel Generator N ( E ) Renewal Of Fuel Filters ( Pre Filter &Micro Filter Element ) ( Part No. 34.032.02.0 & 34.032.03.0 ) 179 1005 N Diesel Generator ( F ) Renewal Of Oil Filter ( Part No. 03.040.19.0 ) 180 1005 Ndiesel Generator ( G ) Engine To Be Started For Trial For 30 Minutes. 181 Valve To Be Overhauled Make-Vijoli, Type-Screw Down, Overhauling Includes Renewal Of Wear Down Parts ( Spindle, Disc ) , Mat- Gm 182 1006 N Valves ( A ) Dia 150 Mm 183 1006 N Valves ( B ) Dia 50 Mm 184 1006 N Valves N ( C ) Dia 15 Mm 185 1006 N Valves N ( D ) Dia 80 Mm 186 Rubber Expansion Bellow ( With Flange ) To Be Renewed. Working Pr- 5 Bar, Fluid- Sullage Oil 187 1007 Nbellows N ( A ) Dia 150 Mm 188 1007 Nbellows N ( B ) Dia 80 Mm 189 Three Way Plug Cock To Be Overhauled, Mat - Ss 190 1008 Ncocks N ( A ) Dia 150 Mm 191 1008 Ncocks ( B ) Dia 80 Mm 192 Semi Rotary Hand Pump To Be Overhauled Make-Venus, Model-N97 193 1009 N Hand Pumps ( A ) Pump To Be Overhauled Includes Renewal Of Wear Down Parts. 194 1009 Nhand Pumps ( B ) Wooden Handled To Be Renewed. 195 1010 Noverhauling Of System V / V Nvalves N ( A ) Sdnr Globe V / V . Dia - 150 Mm 196 1010 Noverhauling Of System V / V Nvalves N ( B ) Sdnr Globe Suction V / V Of Sullage Tank. Dia- 80 Mm 197 1011 Nrelief Valve 80Mm Dia Relief Valve To Be Removed, Overhauled, Calibrate ( Pr-04Bar ) And Fitted Back. 198 Glycerine Filled Bourden Pr Gauges To Be Renewed, Make-An Instruments 199 1012 Npr. Gauges ( A ) Range:- -01 To 01 Kg ( Suction Pr Gauge ) 200 1012 N Pr. Gauges ( B ) Range:- 0 To 04 Kg ( Discharge Gauge ) 201 Co2 Fire Fighting Sytem Maker:-Shm Ship Care ( All Procedures To Be Carried As Mentioned Below And Replace Defective Parts If Required ) 202 1013 Nco2 Fire Fighting System ( A ) Co2 Cylinders To Be Removed, Chemically Cleaned, Pressure Tested And Recharged With 45Kg Co2 203 1013 Nco2 Fire Fighting System ( B ) Non Return Valves On Cylinder Heads To Be Overhauled. 204 1013 Nco2 Fire Fighting System ( C ) Co2 Discharge Nozzles To Be Opened, Checked For Chockages, Cleaned And Fitted Back 205 1013 Nco2 Fire Fighting System ( D ) Overhaul Of Relief Valve Assembly 206 1013 Nco2 Fire Fighting System ( E ) Overhaul Of Pressure Operated Switch 207 1013 Nco2 Fire Fighting System ( F ) Complete Co2 System Piping To Be Blown Through Using Hp Air To Prove System Free Of Blockages 208 1013 Nco2 Fire Fighting System ( G ) Co2 Cylinders ( 45 Kg Capacty ) And System Pipes To Be Painted As Per Coding Post Work Completion. 209 1013 Nco2 Fire Fighting System N ( H ) All System Pipes ( Dia-20 Mm ) To Be Painted As Per Coding Post Work Completion. 210 1013 Nco2 Fire Fighting System ( J ) Renewal Of Flexible Hoses As Per Sample ( Pr 275Bar ) 211 1013 Nco2 Fire Fighting System ( K ) Actuator To Be Overhauled Operated By N2 212 1013 Nco2 Fire Fighting System N ( L ) Solenoid To Be Checked For Operation And Renewed If Declared Ber. 213 1013 Nco2 Fire Fighting System N ( M ) Both Nitrogen Cylinders To Be Removed, Chemically Cleaned, Pressure Tested And Recharged With 10 Ltr N2 Each 214 1013 Nco2 Fire Fighting System ( N ) Pr Gauges To Be Renewed, Make-Wikarange-400 Kg / Cm2 215 1013 Nco2 Fire Fighting System N ( P ) Pr Gauges To Be Renewed, Make-Wikarange-200 Kg / Cm2 216 1013 Nco2 Fire Fighting System ( Q ) Undertake Testing Of The Co2 System As Follows: 217 1013 Nco2 Fire Fighting System N ( I ) Lamp Checks Of Various Indication In The Control Panel. Replace If Defective 218 1013 Nco2 Fire Fighting System ( Ii ) Open Pilot Control Box To Check Indication On The Panel 219 1013 Nco2 Fire Fighting System ( Iii ) Check Klaxon Horn And Strobe Comes On. 220 1013 Nco2 Fire Fighting System ( Iv ) Check Hooter And Fire Detector Replace If Defective. 221 1013 N Co2 Fire Fighting System N ( Q ) Pull Pressure Switch Knob Of Pr Swicth For Premature Discharge To Check Indication On The Panel. Pull The Pr Switch Knob For Co2 Discharge Indication. Check Indication Panel. The Premature Discharge Indication Shall Go Off. Reset Both The Knob After This Operation. The Indications Shoukd Go Off. Nnote: The Entire Co2 System To Be Proved For Functional Checks Without Co2 222 1014 N Misc Renewal Of Flexible Hoses On Discharge Side Of Hand Pump. Dia-65 Mm , Length 05 Mtr Each 223 1015, Nmisc Sounding Caps Of Tanks Damaged To Be Opened, Manufactured As Per Sample 224 1016 N Misc Cleaning / Renewal Of Sight Glass Of Ru Tank. Overhaul Spring Loaded Check Valve Of Both Tanks. Joints To Be Renewed And Fitted Back. 225 1017 Nmisc Nquick Shut Off Valves Of The Fuel Tanks To Be Overhauled. Arrangement Of The System Involved To Be Overhauled For Operating From Remote Position. ( Deck ) 226 1018 Nmisc Hydrant V / V And Fire Hydrants To Be Overhauled And Made Operational Dia- 50 Mm 227 Electrical Defect List N Neqpt / System: 3Ph 3Wire Sine Wave Invertor;Ac Input 415V, 3Ph;Dc Input 360V;Ac Out Put -415V, 3Ph, Sine Wave 228 2001 Ninverter Ncarry Out Overhauling / Checking / Fault Rectification Of Invertor And Made It Operational.Presently Mother Board Is Not Working. 229 2002 Nbatteries Nrenew The Sealed Maintance Free Lead Acid Batteries2000ah, 12V. Make: Exide 230 2003, Neqpt / System:Msb Nmsb N ( A ) Msb To Be Overhauled ( Includes Defective Switches To Be Renwed, Perished Control Wiring To Be Renewed With Crimping Of Proper Lugs, Marking Sleeves To Be Put On Control Wiring And Loose Wirng To Be Tied With Cable Ties ) ( Presently There Is No Deffective Parts, All Components Are Working. ) . Carryout Routines Mentioned Below And Prove Them For Satisfactory Performance. ( Calibration Certificates / Test Reports From Nabl Recognised Labs Are To Be Submitted. ) N N N N 231 2003 , Neqpt / System:Msb N Msb N ( B ) De-Energise Switchboard. Remove All Busbars, Insulators, Cts, Pts, Junction Boxes, Switch Contact Surfaces, Fuse Bases / Carriers And Other Components. Clean And Decarbonise The Busbar Using Soft Brush / Calico Cloth Dipped In Alcohol. Thoroughly Clean And Ascertain The Soundness Of These Components. Repair / Replaced Them As Required. 232 2003 Neqpt / System:Msb N Msb ( C ) Inspect Cables And Bus Bar . Replace All Defective Cables, Wirings, Lugs And Termination. Tighten Electrical Connections And Fasteners ( Cable -100 Mtr, 1 Sqm For 02 Sections ) 233 2003, Neqpt / System:Msb Nmsb ( D ) Apply Loctite ( Or Equivalent Compound ) To All Loose Screw / Nuts Of Breaker Asemblies. 234 2003 Neqpt / System:Msb N Msb ( E ) Examine Actuating Mechanism And Condition Of Contacts. Carry Out Repairs / Cleaning / Lubrication Of All Mechanical Parts And Contacts And Check For Satisfactory Operations 235 2003 Neqpt / System:Msb N Msb ( F ) Rubber Mat : Insulating Rubber Mat Deteriorated. To Be Renewed With Oil Resistance & Very High Voltage Resistance Electrical Rubber Mat In Front Of Msb. ( Thickness- 3Mm ) Make Vardhaman Model Class C 236 2004 Nbattery Charging System Provide Battery Chargering System 12V, Dc From Shore Supply System For Dg Starting Battery-1No At 1 Deck, & Sullage Pump Engines Starting Batteries 12V, 180Ah-4 Nos At Pump Room 237 2005 Nnav Lights Nrenew The Port Navigational Light Fitting Two Stair Type ( 230V, Ac & 24V Dc ) 238 2006 Ndynamos N Over Hauling 12V, Dc Dynamos Make:Tvs 239 2007 Nstarters Nover Hauling Of Self Starters 12V, 3Hp Dc Make:Tvs 240 2008 Ndg Starting System Ncarry Out Overhauling / Checking / Fault Rectification Of Engine Control & Starting Wiring System And Made It Operational.Renew The Any Deffective Parts ( Presently All Working ) 241 2009 Nmisc Renew The3core 25 Sq.Mm Multy Stand Copper Marine Shore Supply Cable. 242 2010 Neqpt / System: Shore Supply Pannel N Shore Supply Panel Carry Out Overhaul Of Shore Supply Pannel.Required To Renew The Window Glass ( 8X8 ) 243 2011 Neqpt / System: Motors N Motors Carry Out Overhaul Of 2 In Nos Blower Motors 415V.3Ph, 3Hp-1No, 230V, 1Ph, .25Hp-1No 244 2012 Neqpt / System: Ship Name Board Nmisc N ( A ) Renew The Acrylic 4Mm Sheet For Name Board Size:4X2.5 245 2012 Neqpt / System: Ship Name Board Nmisc ( B ) Renew The Led Tube Lights 20W, 2, 230V Ac 246 2013 Neqpt / System: Wall Mounted Fans Nmisc Nrenew The Wall Mounted Fans 300Mm Sweep, 230V Make:Bajaj / Philps 247 2014 Neqpt / System:Flood Lights Nmisc Renew The Led Flood Lamp 230V, 200W 248 Dry Dock And Allied Services Work Packages N N ( A ) Docking And Undocking Charges ( Both Versions ) 249 ( B ) Dock Blocks Preparation & Laying Out As Per Docking Plan 250 Dock Hire Charges For An Estimated Duration Of 60 Days As Per Ocr 251 Wet Basin / Alongside Hire Charges For The Remaining Duration ( I.E. Total Refit Duration Of – 60 Days Docking Period ) 252 Provision Of Sufficient Lighting For Duty Staff 253 Quote For Maintenance Of Two In No. Fire Lines For The Refit Duration . 254 Provision Of Two Transports ( Cars ) For Entire Refit Duration ( One For Refit Co-Ordinating Staff And One For Nd ( V ) Monitoring Team ) For 12 Hrs Or 100Km / Day Whichever Is Less 255 Provision Of Stationory / Office Items For Nd ( V ) / Refit Monitoring Team For Entire Refit Duration Period.Cater Budget Of Rs 2000 / - Per Month.Requirement Will Be Intimated Rmt / Ndv On As Requirement Basis.Payment At Actuals. Nnote:- Firms To Quote. 256 Mail Man Services ( 02 Nos ) For Entire Refit Duration ( One For User Department And One For Planning / Co-Ordinating Department ) To Be Provided For 10 Hrs Per Day 257 Qc Inspection For The Entire Scope Of Work By Third Party Irs / Lrs / Abs / Qc / Tpi For The Refit Duration As Per The Qis.

BOQ

Name of Work: <NORMAL REFIT OF IN SHIP>
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11.0001WORK PAKAGE FOR NR SB-V\n HULL DEFECT LIST\n001\nDocking\nVessel to be docked in both versions.\nNote 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) Slipway/Drydock).\nNote 2:- Last docked in Version I on 22 Aug B1542017Item no 11Firm not to quote
21.0002002\nCleaning of Under Water Hull and Boot Top Area\nHP jet cleaning of entire under water area and boot top area (with a pressure not exceeding 3000 PSI) remove the marine growth/barnacles and prepare for survey.\nNote:- (i) U/W area: 425 Sqm including boot topItem no 2425Sqm
31.0003003\nCleaning of Internal Compartments - Sullage tanks(06 Nos)\nManually clean fuel tanks free of accumulated fuel and residual muck and present for survey.Item no 3750Sqm
41.0004004\nCleaning of Internal Compartments\nManually clean following internal compartments free of accumulated water and residual muck and present for survey. (a) Cable lockerItem no 420Sqm
51.0005004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (b) Forepeak tankItem no 560Sqm
61.0006004\nCleaning of Internal Compartments \nManually clean following internal compartments free of accumulated water and residual muck and present for survey:- (c) Cofferdam 1Item no 6105Sqm
71.0007004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (d) Cofferdam 2Item no 770Sqm
81.0008004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (e) Cofferdam 3Item no 870Sqm
91.0009004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (f) Cofferdam 4Item no 970Sqm
101.001004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- (g) PUMP Room (Bilges: 120 Sqm, Bulkheads:140 Sqm)Item no 10260Sqm
111.0011004 Cleaning of Internal Compartments - ASP Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- (h) Steering gear room (Bilges: 24 Sqm, Bulkheads:76 Sqm)Item no 11100Sqm
121.001205 Cleaning of Void spaces (06 Nos) Manually clean 06 Nos void spaces of all residues and present for survey. Note: Cleaning to be done with detergent water, oil absorbing/removing solution or powder, rags, cotton jute etc. Quote to include cost of cleaning material also.Item no 12450Sqm
131.0013006 Hull Survey - Visual survey External and Internal Structures Carry out visual and hammer survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.) All manholes to be inspected for water tightness, chalk impression test to be carried out. Note:- (i) LS for survey (ii)Firm to submit 07 copies of hull survey report .Item no 133000Sqm
141.0014007 Hull Survey - UTG Survey External and Internal Structures Carry out UTG survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.) All manholes to be inspected for water tightness, chalk impression test to be carried out. Note:- (i) LS for survey (ii) Firm to submit 07 copies of hull survey report . (iii) Quote for UTG survey pointsItem no 145000Nos
151.0015008 Steel renewal\nQuote for steel renewal at various locations as per survey report\nNote :- Quoted repair cost shall include cost of both sides blasted and primed IS 2062 Grade `B’ quality steel. Degutting/ regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc.Item no 1510Ton
161.0016009 Build ups\n(a) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 25 x 25 mmItem no 16300Nos
171.0017009 Build ups\n(b) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 50 x 50 mmItem no 17150Nos
181.0018010 Fairing of deformed structure\n Carryout fairing of deformed structures as indicated by Hull Survey Team/ SurveyorItem no 1830Sqm
191.0019011 Re-welding\nCarry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.Item no 1930RMT
201.002012 Draft marks\nDraught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.Item no 2020Nos
211.0021013 Sacrificial anodes\n(a) Renew Sacrificial anodes those consumed more than 50% Type: MK-I Note:- Anodes will be supplied by Navy/COY.Item no 2114Nos
221.0022013 Sacrificial anodes\n(b) Renew Sacrificial anodes those consumed more than 50% Type: MK-VI Note:- Anodes will be supplied by Navy/COY.Item no 226Nos
231.0023014 Surface Preparation Under Water area \nSurface preparation to SA 2.5 std using grit blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application. (areas include 'C' channel for rubber fenders)Item no 23325Sqm
241.0024015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard primer -50 micronsItem no 24325Sqm
251.0025015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 micronsItem no 25325Sqm
261.0026015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 micronsItem no 26325Sqm
271.0027015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 micronsItem no 27325Sqm
281.0028015 Painting Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 micronsItem no 28325Sqm
291.0029015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 micronsItem no 29325Sqm
301.003015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 micronsItem no 30325Sqm
311.0031016 Surface Preparation Boot Top area \nSurface preaparation to SA 2.5 standards using grit blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application. (areas include 'C' channel for rubber fenders)Item no 31100Sqm
321.0032017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFTItem no 32100Sqm
331.0033017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns DFTItem no 33100Sqm
341.0034017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns DFTItem no 34100Sqm
351.0035017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns DFTItem no 35100Sqm
361.0036017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns DFTItem no 36100Sqm
371.0037017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns DFTItem no 37100Sqm
381.0038017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra (Black) - 150 microns DFTItem no 38100Sqm
391.0039018 Surface prepartion Above Water Area and Bulwark including guardrails Carry out mechanical cleaning to ST3 standard for paint application as per survey report by Paint OEM repItem no 39110Sqm
401.004019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: Penguard primer - 50 microns DFTItem no 40110Sqm
411.0041019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFTItem no 41110Sqm
421.0042019 Painting- Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFTItem no 42110Sqm
431.0043019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP Grey - 60 microns DFTItem no 43110Sqm
441.0044020 Surface prepartion Super Structure and Deck Fittings Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.Item no 44110Sqm
451.0045021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFTItem no 45110Sqm
461.0046021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80( Red ) - 125 microns DFTItem no 46110Sqm
471.0047021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c)3rd Coat: Jotamastic 80(Grey) - 125 microns DFTItem no 47110Sqm
481.0048021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP GREY 7040- 60 microns DFTItem no 48110Sqm
491.0049022 Surface prepartion Weather Decks Carry out hydro-jet blasting of entire weather deck, bridge deck and flag deck to SA 2.5 standards.Item no 49225Sqm
501.005023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFTItem no 50225Sqm
511.0051023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 - 150 microns DFTItem no 51225Sqm
521.0052023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota armour -800 microns DFTItem no 52225Sqm
531.0053024 Surface prepartion Internal Compartments - Fore Peak Tank, Cable locker and Cofferdam Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for fore peak tank , cable locker and cofferdam (04).Item no 53395Sqm
541.0054025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a)1st Coat: primer - Penguard primer -50 microns DFTItem no 54395Sqm
551.0055025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Balloxy HB light (Bieze) - 150 micronsItem no 55395Sqm
561.0056025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Balloxy HB light (Grey) - 150 micronsItem no 56395Sqm
571.0057026 Surface prepartion Internal Compartments - Pump Room and ASP Compartment including bilges Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. (i) Pump room ( Bilges-120 sqm, bulkheads-140) (ii) ASP ( Bilges-24 sqm, bulkheads-76)Item no 57360Sqm
581.0058027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFTItem no 58144Sqm
591.0059027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 micronsItem no 59144Sqm
601.006027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 micronsItem no 60144Sqm
611.0061027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns.Item no 61144Sqm
621.0062028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFTItem no 62216Sqm
631.0063028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Interior fire retardent paint-100 micronsItem no 63216Sqm
641.0064028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Interior fire retardent paint-100 micronItem no 64216Sqm
651.0065029 Cleaing of RU Tanks Cleaning of Fuel Oil RU TanksManually scrap and clean to bare metal and apply two coats of OM 750 oil in following tanks: Fuel Oil RU Tanks (02nos) Note:- Quoted cost shall be inclusive of cost of oil also.Item no 6540Sqm
661.0066030 Surafce prepartion Bulkheads, decks and dadoes of Internal compartments Carry out mechanical cleaning of all stores ( naval stores,battery stores, CO2 room, paint stores,pump store,deck store and eletrical control room) to ST 3 standard as survey report of Paint OEM for paint application.Item no 66280Sqm
671.0067031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 micronsItem no 6730Sqm
681.0068031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (b) 2nd coat : Jotamastic 80 grey -1 x 150 micronsItem no 6830Sqm
691.0069031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (c) 3rd coat ; Burnswick green finishing paint-100 micronsItem no 6930Sqm
701.007032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 micronsItem no 70250Sqm
711.0071032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b)1st Coat: Interior fire retardent paint-100 micronsItem no 71250Sqm
721.0072032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 2nd Coat: Interior fire retardent paint-100 micronsItem no 72250Sqm
731.0073033 Surface preaprtion Void spaces Carry out surface preaprtion to ST 3 standards of VOID Spaces as survey report of Paint OEM for paint application.Item no 73450Sqm
741.0074034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (a) 1st coat- penguard primer- 50 micronsItem no 74450Sqm
751.0075034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (b) 2nd coat coat-Jotacoat universal (Al)- 150 MICRONSItem no 75450Sqm
761.0076034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (c) 2nd coat coat-Jotacoat universal (GREY)- 150 MICRONSItem no 76450Sqm
771.0077034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (d) 3rd coat t-Penguard top coat- 50 MICRONSItem no 77450Sqm
781.0078035 Surface preaprtion Sullage Tanks Carry out surface preaprtion to ST 3 standards of all sullage tanks/fuel tanks as survey report of Paint OEM for paint application.Item no 78750Sqm
791.0079036 Painting Sullage Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (a) Tankguard HB light grey - 150 micronsItem no 79750Sqm
801.008036 Painting Sullage Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (b) Tankguard HB greyish green - 150 micronsItem no 80750Sqm
811.0081037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \nNote : -The job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. (a) Anchors - 03Item no 813Nos
821.0082037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (b) Chain cable(Dia 17.5mm) (i) Full Shackles- 08 (ii) Half Shackles- 04Item no 82275Rmt
831.0083037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \n(c) Swivel pieceItem no 836Nos
841.0084037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \n(d) Lug less joining shacklesItem no 8412Nos
851.0085037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \n(e) D - ShacklesItem no 854Nos
861.0086037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (f) Chain Stopper/compressorItem no 862Nos
871.0087038 Anchor windlass Completely strip & overhaul anchor windlass, renew brake linings, refit and prove for satisfactory operation. Quoted price to include cost of liners and spares also.Item no 871Nos
881.0088039 Bollards (a) Twin bollard and foundation corroded and thinned. To be repaired/ renewed as per hull survey report. Doubler plate Area-420MMx420MM, Dia of pipe-219.1MM, Height-1460MM,Foundation Area-400MMx400MMx90MM, Thickness of plate-10MM Towing gear Securing Rod Dia-50MM.Item no 888Nos
891.0089039 Bollards (b) Towing bollard and foundatiosn corroded and thinned. To be repaired/ renewed as per hull survey report. Doubler plate Area-420MMx420MM, Dia of pipe-219.1MM, Height-1460MM,Foundation Area-400MMx400MMx90MM, Thickness of plate-10MM Towing gear Securing Rod Dia-50MM.Item no 892Nos
901.009040 Guardrails (a)Fixed verticals guardrail stanchions on weather deck deformed/bent from deck. To be repaired/renewed. (Mat-MS angle bar)Item no 9060Nos
911.0091040 Guardrails (b) Fixed Horizontal guardrails on weather deck deformed/bent To be repaired/renewed. (Mat-MS)Item no 9150RMtrs
921.0092041 Metallilc chain guardrails Metallic chain guardrails of stanchions corroded to chipped and cleaned. \nRenewal cost should include cost of material also.Item no 9260RMtrs
931.0093042 Sanitry sysytem Soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. Mat: MS , Dia: 04inch. (Pressure: 3Kg/Cm2)Item no 9315RMtrs
941.0094043 Ventilation (a) Mushroom type natural exhaust ventilator to be removed, cleaned/ overhauled and fitted back. Renew if required. Details- Mush room head dia-500 mm, Height-1550 mmItem no 941Nos
951.0095043 Ventilation (b) Mushroom type forced supply ventilator to be removed, cleaned/ overhauled and fitted back. Renew if required. Details- Mush room head dia-370 mm, Height-1550 mm,Item no 952Nos
961.0096044 Drainage system Drain pipe leading from mast deck to 01 deck and No. 1 deck to engine room corroded, thinned and holed, to be renewed. Mat: GI, 03 inch dia.Item no 9610RMtrs
971.0097045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (a) SS Wash basin to be renewed. Note:- Quoted repair cost shall include cost all items/spares. (a) Wash basinItem no 972Nos
981.0098045 Sanitry system Sanitry fittingss in crew bathrooms and WC. Sanitry fittings in crew bathrooms and wc to be renewed. (b) Provision SS tap: 1/2 inchItem no 984Nos
991.0099045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (c) SS SUPPLY pipeline broken/damaged to be renewed/repaired. Mat : Cu-Ni, dia: ½ inchItem no 9930Nos
1001.01045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (d) Drain pipeline broken/damaged to be renewed/repaired. Mat-MS, dia- 2 inchItem no 10020RMtrs
1011.0101045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (e) Flush valves to be renewed. Mat - Brass, Dia - 2\"Item no 1012Nos
1021.0102046 Fresh water system Crew bathrooms and WC. .Note:- Quoted repair cost shall include cost all items/spares. (a) SS stop cock 1’’ to be renewedItem no 1024Nos
1031.0103046 Fresh water system Crew bathrooms and WC. (b) Shower head to be fitted in bathrooms Note:- Quoted repair cost shall include cost all items/spares.Item no 1034Nos
1041.0104047 Tyre fenders Tyre fender damaged on P&S side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) OD 750mm; ID 450 mm , width - 250 mmItem no 10424Nos
1051.0105047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side. (b) Chain Securing brackets/deck eyes.Item no 10572Nos
1061.0106047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (c) provission of Securing chain. 16 MM DIA for tyre fendersItem no 10672RMtrs
1071.0107047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (d) Bush for passing chain on tyres.Item no 10772Nos
1081.0108047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (e)Provision of D SHACKLES for tyre fendersItem no 10872Nos
1091.0109048 D shape Fenders (a) 'D' shaped rubber fenders damaged/perished to be renewed. Color - GREY/WHITE Length - 1000 mm length Location - 44 on shipside and 05 on transom Material - EPDM rubber as per NES170Item no 10949Nos
1101.011048 D shape Fenders Securing brackets (b) Fender securing flat bar brackets to be repaired/renewed as necessasry.(Mat- MS). Size : 1100MM x 110MM x 08MMItem no 11049Nos
1111.0111048 D shape Fenders Securing brackets (c) Fender securing 'C' clamp brackets to be repaired/renewed as necessasry.(Mat- MS). Size : 200MM x 110MM x 08MMItem no 11198Nos
1121.0112049 Pneumatic Fender. (a) Provision of Pneumatic Fender on (P & S) side at FWD and AFT \nSpecification of fenders:- Size - 660x1160 mm , Mat-Neoprene Blended Rubber having 65 % min Neoprene Content , Colour-White, Tensile strength- 180 Kgf/CM2, Elongation at break- 400 % min, Hardness- 700 max, Tear Strength- Min 40 Kgf/CM2, Compression set- 30 % Max, Abrasion resistance- 0.5 CC Max.\nItem no 1124Nos
1131.0113050 Pneumatic Fender Securing Arrangement (a) Fabrication of MS eye with 08 MM Thickness on shipside.Item no 11316Nos
1141.0114050 Pneumatic Fender Securing Arrangement (b) Provision of D Shackles, Dia 16 MMItem no 11464Nos
1151.0115050 Pneumatic Fender Securing Arrangement (c) Provision of Securing Chain 16 MM Dia length RMT 4 Mtr EachItem no 11520RMtrs
1161.0116051 Sky light SS butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. To be renewed. Dia of bolt : 10 mm & 6 inch length (Mat-MS).Item no 11610Nos
1171.0117052 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (a) WT doorItem no 11712Nos
1181.0118052 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (b) WT HatchItem no 1186Nos
1191.0119053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Forepeak TanksItem no 1192Nos
1201.012053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (b) Fuel/ sullage TankItem no 1206Nos
1211.0121053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (c) Void spaceItem no 1216Nos
1221.0122053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (d) cable lockerItem no 1221Nos
1231.0123053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (e) cofferdamsItem no 1234Nos
1241.0124054 Bilge paltform (a) Renew bilge platform plate. Material- aluminium chequerd plate, thickness- 05 mmItem no 12420Sqm
1251.0125054 Bilge platform (b) Supporting brackets to be renewed where ever required(Mat - Ms). Securing nut&bolts to be of Mat-SS.Item no 12520RMtrs
1261.0126055 Cleats MS cleats perished/thinned to be renewed (Size-28 mm). Quote shall includes nuts bolts and associated accessoriesItem no 1266Nos
1271.0127056 Ventilation System (a) Breather pipes of various tanks on upper deck corroded and thinned including wire mesh, to be repaired/renewed. (Mat. GI pipe) Pipe dia 2 1/2 inchItem no 12710Nos
1281.0128056 Ventilation System (b) Deck distance piece and flanges corroded to be renewed including rubber joints. Dia 150mmItem no 1285Nos
1291.0129056 Ventilation System (c) Ventilation trunking wire mesh to be renewed at damaged areas. Size: 400mmX600mmItem no 12924Nos
1301.013057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways. (a) Surface preparation and application of EROP. And Mass 98.Item no 13030Sqm
1311.0131057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.Item no 13130Sqm
1321.0132057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (c) Surface preparation and application of sealer coat on entire areaItem no 13230Sqm
1331.0133058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (a) Surface preparation and application of EROP. And Mass 98.Item no 1334Sqm
1341.0134058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.Item no 1344Sqm
1351.0135058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (c) Surface preparation and application of sealer coat on entire areaItem no 1354Sqm
1361.0136059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (a) Surface preparation and application of EROP. And Mass 98.Item no 1361Sqm
1371.0137059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.Item no 1371Sqm
1381.0138059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (c) Surface preparation and application of sealer coat on entire areaItem no 1381Sqm
1391.0139060 WT Hatches WT hatch clips to be removed, cleaned, greased and refitted WT Hatch (0.6M x 0.6M)Item no 1396Nos
1401.014061 WT Doors WT door clips to be removed, cleaned, greased and refitted WT DoorsItem no 14014Nos
1411.0141062 NWT NWT Wooden door of wheel house perished, to be repaired/renewed including cylindrical door lock.Item no 1412Nos
1421.0142063 Manhole Rubber Joints perished, to be renewed (a) JointsItem no 14210Nos
1431.0143063 Manhole (b) Studs of manholes perished, to be renewed (Only defective studs to be renewed as per survey report )MS Studs with nut, size 20 mmItem no 143100Nos
1441.0144063 Manhole (c) Manhole covers corroded/ thinned. To be renewed. Mat - IS 2062 Grade 'B' steel. Size - 2' X 1.5'Item no 14410Nos
1451.0145064 Locking arrangment (a) Mortise locks in accomodation areas defective to be renewed.Item no 1456Nos
1461.0146064 Locking arrangment (b) MS Hasp staple/ locking arrangemet on MS Door and hatches corroded/ broken/ damaged to be renewed as per sample fitted.Item no 14616Nos
1471.0147065 Name Board Following name board perished/damaged, to be renewed/repaired. (a) repair/renewal of vessel name board including electroplating to be carried out on ship side -02Item no 1472Nos
1481.0148065 Name Board Following name board perished/damaged, to be renewed/repaired. (b) Vessel illuminated board with Perspex sheet - 01Item no 1481Nos
1491.0149065 Name Board Following name board perished/damaged, to be renewed/repaired. (c) Painting of vessel name on bulwark/Ship side in both Hindi and English with fluorescent paint -02Item no 1492Nos
1501.015066 Furniture (a) CRCA kit lockers perished , to be renewed (90x80x45 cm )Item no 1506Nos
1511.0151066 Furniture (b) CRCA standing lockers perished, to be renewed (183x40x45 cm)Item no 1513Nos
1521.0152066 Furniture (c) Chairs in crew accomadation persihed/damaged , to be renewedItem no 1526Nos
1531.0153066 Furniture (d) Wooden table damaged/pershed to be renewedItem no 1531Nos
1541.0154066 Furniture (e) Wood paneling in crew rest room and wheel house damged/perished, to be renewedItem no 15420Sqm
1551.0155ENGINEERING DEFECT LIST \n\nSullage Pump Engine,MAKE:-M/S GREAVES,MODEL:-3TWA,TYPE:-(AIR COOLED,4-STROKE,VERTICAL INLINE,DIESEL FUELLED),SL NO:-(PORT 1108031010027,STBD-1108031010026)RATING:-25HP,RPM:-1500Item no 1552FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1561.01561001\nSullage Pump Engine \n(a) Renewal of flexible hoses ( EN 853 2SN wire braid, dia 15 mm, with ST 1/4 inch, UNF MALE X BanjoItem no 15610Nos
1571.01571001\nSullage Pump Engine (b) Air intake filter to be renewed ( Part No. 271-3700-14)Item no 1572Nos
1581.01581001\nSullage Pump Engine (c) Renewal of engine oil,Oil will be supplied by NAVYItem no 15810Ltrs
1591.01591001\nSullage Pump Engine (d) Renewal of corrosion plug as per sample (dia - 10 mm, length- 40 mm)Item no 1594Nos
1601.0161001\nSullage Pump Engine (e) Renew Fuel oil filters elements .(part no. 9451 037 401& 9451 037 420)Item no 1604Nos
1611.01611001\nSullage Pump Engine (f) Renewal of oil filter ( Part No.500-2175-19)Item no 1614Nos
1621.01621001\n Sullage Pump Engine (g) Engine to be started for trial for 30 minutes.Item no 1622Nos
1631.0163Sullage Pump MAKE:-M/S TUSHACO PUMP,TYPE:-Progressive,Cavity Screw,MODEL:-T1S 1450.1,SL NO:-(PORT 105182/5212,STBD 105182/5211),Capacity:-60TPH,Total Head-15MWC,Speed-300rpmItem no 1632FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1641.01641002 \n Sullage Pump (a) Overhauling of pumps to be done. includes removal,renewal weardown parts and fit back.Item no 1642Nos
1651.01651002\nSullage Pump (b) Performance trial for 30 minutes post overhauling.Item no 1652Nos
1661.0166Stripping Pump Engine,Make:-M/S Greaves,Type:-Air cooled,4-Stroke,Electric Start Diesel Engine,Speed:-3000rpm,Rating:-7.4bhp,SL No:-(Port-A0L0403225,Stbd-A0L0403224)Item no 1662FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1671.01671003\nStripping Pump Engine (a) Lub oil sump to be drained, cleaned.(sump capacity 5 liters)Item no 1671Nos
1681.01681003\n Stripping Pump Engine (b) Renew air filter elementItem no 1681Nos
1691.01691003\n Stripping Pump Engine (c) Renew Fuel oil filters element .Item no 1691Nos
1701.0171003\n Stripping Pump Engine (d) Engine to be started for trial for 30 minutes.Item no 1701Nos
1711.0171Stripping Pump Make:-M/S B E Pump,Model:-SH80-140N1-DGS2-316,Type:-Horizontal,Self-Priming,Centrifugal,Capacity:-60TPH,Total head:-15MWC,SL NO:-Port-358898,Stbd-358899.Item no 1712FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1721.01721004\nStripping Pump (a) Overhauling of pumps includes removal,renewal weardown parts(Shaft,mechanical seals,impeller,gaskets) and fitted back.Item no 1722Nos
1731.01731004\nStripping Pump (b) Performance trial for 30 minutes post overhauling.Item no 1732Nos
1741.0174Genset Make:-Kirloskar,Type:-HA394,Sl No:-03.2017/1021253,Rating:-23.55kw,32HpItem no 1741FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1751.01751005\n Diesel Generator \n(a) Renewal of flexible hoses ( EN 853 2SN wire braid, dia 15 mm, with ST 1/4 inch, UNF MALE X Banjo)Item no 1754Nos
1761.01761005\n Diesel Generator \n(b) Air intake filter to be renewed.Item no 1761Nos
1771.01771005\n Diesel Generator (c) Renewal of engine oil Qty-10ltr,Oil will be supplied by NAVYItem no 1771Nos
1781.01781005\n Diesel Generator \n(e) Renewal of fuel filters(pre filter &Micro filter element) (Part No. 34.032.02.0 & 34.032.03.0)Item no 1782Nos
1791.01791005\n Diesel Generator (f) Renewal of oil filter( Part No. 03.040.19.0)Item no 1792Nos
1801.0181005\nDiesel Generator (g)Engine to be started for trial for 30 minutes.Item no 1801Nos
1811.0181Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GMItem no 1811FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1821.01821006\n Valves (a) Dia 150 mmItem no 1826Nos
1831.01831006\n Valves (b) Dia 50 mmItem no 1837Nos
1841.01841006\n Valves \n(c) Dia 15 mmItem no 1844Nos
1851.01851006\n Valves \n(d) Dia 80 mmItem no 1854Nos
1861.0186Rubber Expansion Bellow (with flange ) to be Renewed. Working Pr- 5 bar, Fluid- sullage oilItem no 1861FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1871.01871007\nBellows \n(a) Dia 150 mmItem no 1874Nos
1881.01881007\nBellows \n (b) Dia 80 mmItem no 1884Nos
1891.0189Three way Plug Cock to be Overhauled, Mat - SSItem no 1891FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1901.0191008\nCocks \n(a) Dia 150 mmItem no 1901Nos
1911.01911008\nCocks (b) Dia 80 mmItem no 1911Nos
1921.0192Semi Rotary Hand Pump to be Overhauled Make-VENUS,Model-N97Item no 1921FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1931.01931009\n Hand Pumps (a) Pump to be overhauled includes renewal of wear down parts.Item no 1937Nos
1941.01941009\nHand Pumps (b) Wooden handled to be renewed.Item no 1947Nos
1951.01951010\nOverhauling of System V/V \nValves \n(a)SDNR globe v/v . Dia - 150 mmItem no 1958Nos
1961.01961010\nOverhauling of System V/V \nValves \n(b)SDNR globe suction v/v of sullage tank. Dia- 80 mmItem no 1966Nos
1971.01971011\nRelief Valve 80mm Dia Relief Valve to be removed,overhauled,calibrate(pr-04bar) and fitted back.Item no 1971Nos
1981.0198Glycerine filled Bourden Pr Gauges to be Renewed,Make-AN InstrumentsItem no 1981FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
1991.01991012 \nPr. Gauges (a) Range:- -01 to 01 kg (suction pr gauge)Item no 1994Nos
2001.021012\n Pr. Gauges (b) Range:- 0 to 04 kg (discharge gauge)Item no 2004Nos
2011.0201CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required)Item no 2011FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
2021.02021013\nCO2 Fire Fighting System (a) CO2 cylinders to be removed, chemically cleaned, pressure tested and recharged with 45kg CO2Item no 2022Nos
2031.02031013\nCO2 Fire Fighting System (b) Non return valves on cylinder heads to be overhauled.Item no 2032Nos
2041.02041013\nCO2 Fire Fighting System (c) CO2 discharge nozzles to be opened, checked for chockages, cleaned and fitted backItem no 20410Nos
2051.02051013\nCO2 Fire Fighting System (d) Overhaul of relief valve assemblyItem no 2051Nos
2061.02061013\nCO2 Fire Fighting System (e) Overhaul of pressure operated switchItem no 2062Nos
2071.02071013\nCO2 Fire Fighting System (f) Complete Co2 system piping to be blown through using HP air to prove system free of blockagesItem no 2071Nos
2081.02081013\nCO2 Fire Fighting System (g) CO2 cylinders (45 kg capacty) and system pipes to be painted as per coding post work completion.Item no 2081Set
2091.02091013\nCO2 Fire Fighting System \n (h) All system pipes (dia-20 mm) to be painted as per coding post work completion.Item no 20930Mtrs
2101.0211013\nCO2 Fire Fighting System (j) Renewal of flexible hoses as per sample (pr 275bar)Item no 2102Nos
2111.02111013\nCO2 Fire Fighting System (k) Actuator to be overhauled operated by N2Item no 2111Nos
2121.02121013\nCO2 Fire Fighting System \n(l) Solenoid to be checked for operation and renewed if declared BER.Item no 2122Nos
2131.02131013\nCO2 Fire Fighting System \n(m) Both Nitrogen cylinders to be removed, chemically cleaned, pressure tested and recharged with 10 ltr N2 eachItem no 2132Nos
2141.02141013\nCO2 Fire Fighting System (n) Pr gauges to be renewed,Make-WIKARange-400 kg/cm2Item no 2141Nos
2151.02151013\nCO2 Fire Fighting System \n(p) Pr gauges to be renewed,Make-WIKARange-200 kg/cm2Item no 2151Nos
2161.02161013\nCO2 Fire Fighting System (q) Undertake Testing of the CO2 system as follows:Item no 2161FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
2171.02171013\nCO2 Fire Fighting System \n(i) Lamp checks of various ' Indication' in the Control Panel. Replace if defectiveItem no 2177Nos
2181.02181013\nCO2 Fire Fighting System (ii) Open Pilot control Box to check indication on the panelItem no 2181Nos
2191.02191013\nCO2 Fire Fighting System (iii) Check Klaxon Horn and strobe comes on.Item no 2191Nos
2201.0221013\nCO2 Fire Fighting System (iv) Check Hooter and Fire detector replace if defective.Item no 2201Nos
2211.02211013\n CO2 Fire Fighting System \n(q) Pull pressure switch knob of pr swicth for premature discharge to check indication on the panel. Pull the pr switch knob for CO2 discharge indication. Check indication panel. The premature discharge indication shall go off. Reset both the knob after this operation. The indications shoukd go off.\nNote: The entire CO2 system to be proved for functional checks without Co2Item no 2211Nos
2221.02221014\n Misc Renewal of flexible hoses on discharge side of hand pump. Dia-65 mm , length 05 mtr eachItem no 2225Nos
2231.02231015,\nMisc Sounding caps of tanks damaged to be opened, manufactured as per sampleItem no 22311No.s
2241.02241016\n Misc Cleaning / Renewal of sight glass of RU tank. Overhaul Spring loaded check valve of both tanks. Joints to be renewed and fitted back.Item no 2242No.s
2251.02251017\nMisc \nQuick Shut Off valves of the fuel tanks to be overhauled. Arrangement of the system involved to be overhauled for operating from remote position.(deck)Item no 2252No.s
2261.02261018\nMisc Hydrant v/v and fire hydrants to be overhauled and made operational Dia- 50 mmItem no 2262No.s
2271.0227ELECTRICAL DEFECT LIST\n\nEqpt/System: 3ph 3wire sine wave Invertor;AC input 415V,3ph;DC input 360V;AC out put -415V,3Ph,sine waveItem no 2271FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
2281.02282001\nInverter \ncarry out overhauling/checking/fault rectification of invertor and made it operational.presently Mother board is not working.Item no 2281Nos
2291.02292002\nBatteries \nRenew the Sealed Maintance free Lead acid batteries2000AH,12V. Make: ExideItem no 22939Nos
2301.0232003, \nEqpt/System:MSB \nMSB \n(a) MSB to be overhauled (includes defective switches to be renwed, perished control wiring to be renewed with crimping of proper lugs, marking sleeves to be put on control wiring and loose wirng to be tied with cable ties) (presently there is no deffective parts,all components are working.). Carryout routines mentioned below and prove them for satisfactory performance. (calibration certificates/test reports from NABL recognised Labs are to be submitted.) \n\n\n\nItem no 2301Nos
2311.02312003 ,\nEqpt/System:MSB \n MSB \n(b) De-energise switchboard. Remove all busbars, insulators, CTs, PTs, junction boxes, switch contact surfaces, fuse bases/carriers and other components. Clean and decarbonise the busbar using soft brush/calico cloth dipped in alcohol. Thoroughly clean and ascertain the soundness of these components. Repair/replaced them as required.Item no 2311Nos
2321.02322003 \nEqpt/System:MSB \n MSB ( c ) Inspect cables and bus bar . Replace all Defective cables, wirings, lugs and termination. Tighten electrical connections and fasteners(Cable -100 mtr,1 sqm for 02 sections )Item no 232100Nos
2331.02332003, \nEqpt/System:MSB \nMSB (d) Apply LOCTITE ( or equivalent compound) to all loose screw/nuts of breaker asemblies.Item no 233150Nos
2341.02342003\nEqpt/System:MSB \n MSB ( e ) Examine actuating mechanism and condition of contacts. Carry out repairs/ cleaning / lubrication of all mechanical parts and contacts and check for satisfactory operationsItem no 2344Nos
2351.02352003\nEqpt/System:MSB \n MSB (f) Rubber mat : Insulating Rubber Mat deteriorated. To be Renewed with oil resistance & very high voltage resistance Electrical rubber mat in front of MSB.(Thickness- 3mm) Make vardhaman model class cItem no 2356sq.mtrs
2361.02362004\nBattery Charging System Provide Battery chargering system 12V,DC from shore supply system for DG starting battery-1no at 1 deck, & sullage pump engines starting batteries 12V,180AH-4 nos at pump roomItem no 2362Nos
2371.02372005\nNav lights \nRenew the port navigational light fitting TWO stair type (230V,AC & 24V DC)Item no 2371Nos
2381.02382006 \nDynamos \n Over hauling 12V,DC Dynamos Make:TVSItem no 2385nos
2391.02392007\nStarters \nOver hauling of self starters 12V,3HP DC Make:TVSItem no 2395Nos
2401.0242008\nDG Starting System \nCarry out overhauling/checking/fault rectification of engine control & starting wiring system and made it operational.Renew the any deffective parts (presently all working)Item no 2405Nos
2411.02412009\nMisc Renew the3core 25 sq.mm multy stand copper marine shore supply cable.Item no 241100Rmtrs
2421.02422010\nEqpt/System: shore supply pannel \n Shore supply panel Carry out overhaul of shore supply pannel.required to renew the window glass (8\"X8\")Item no 2421Nos
2431.02432011\nEqpt/System: Motors\n Motors Carry out overhaul of 2 in nos blower motors 415V.3Ph,3HP-1no,230V,1Ph,.25HP-1noItem no 2432Nos
2441.02442012\nEqpt/System: Ship Name Board \nMisc \n(a)Renew the acrylic 4mm sheet for name board Size:4'X2.5'Item no 2442Nos
2451.02452012\nEqpt/System: Ship Name Board \nMisc (b)Renew the LED tube lights 20W,2',230V ACItem no 2452Nos
2461.02462013\nEqpt/System: Wall mounted Fans \nMisc \nRenew the wall mounted fans 300mm sweep,230V Make:Bajaj/philpsItem no 2468Nos
2471.02472014\nEqpt/System:Flood lights \nMisc Renew the LED flood lamp 230V,200WItem no 2472Nos
2481.0248DRY DOCK AND ALLIED SERVICES WORK PACKAGES\n\n(A) Docking and undocking charges (Both Versions)Item no 2482Verson\nFirm not to quote
2491.0249(B) Dock blocks preparation & laying out as per docking planItem no 2492LS\nFirm not to quote
2501.025Dock hire charges for an estimated duration of 60 Days as per OCRItem no 2501Days\nFirm not to quote
2511.0251Wet basin/alongside hire charges for the remaining duration (i.e. total refit duration of – 60 days docking period)Item no 2511Days\nFirm not to quote
2521.0252Provision of sufficient lighting for duty staffItem no 252150Days
2531.0253Quote for maintenance of two in no. fire lines for the refit duration .Item no 253150Days
2541.0254Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is lessItem no 254150Days
2551.0255Provision of Stationory/Office items for ND(V)/Refit monitoring team for entire refit duration period.Cater budget of Rs 2000/- per month.Requirement will be intimated RMT/NDV on as requirement basis.Payment at actuals.\nNote:- firms to quote.Item no 2553Months
2561.0256Mail man services (02 Nos) for entire refit duration (one for user department and one for planning / Co-ordinating department ) to be provided for 10 Hrs per dayItem no 256150Days
2571.0257QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS.Item no 2571Firm not to quote

AI Tender Summary

OUR REF NO 22486836
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 05-12-2019
Authority
Authority Name Indian Navy
Work Description Tender For Offloading Of Nr Of Sullage Barge V For A Total Duration Of 150 Days Scheduled W.E.F. 01 Jan 2020 ( Inclusive Of 60 Days Docking Period ) -1 Work Pakage For Nr Sb-V N Hull Defect List N001 Ndocking Nvessel To Be Docked In Both Versions. Nnote 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises ( I.E Nd ( V ) Slipway / Drydock ) . Nnote 2:- Last Docked In Version I On 22 Aug B1542017 2 002 Ncleaning Of Under Water Hull And Boot Top Area Nhp Jet Cleaning Of Entire Under Water Area And Boot Top Area ( With A Pressure Not Exceeding 3000 Psi ) Remove The Marine Growth / Barnacles And Prepare For Survey. Nnote:- ( I ) U / W Area: 425 Sqm Including Boot Top 3 003 Ncleaning Of Internal Compartments - Sullage Tanks ( 06 Nos ) Nmanually Clean Fuel Tanks Free Of Accumulated Fuel And Residual Muck And Present For Survey. 4 004 Ncleaning Of Internal Compartments Nmanually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey. ( A ) Cable Locker 5 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey. ( B ) Forepeak Tank 6 004 Ncleaning Of Internal Compartments Nmanually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( C ) Cofferdam 1 7 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( D ) Cofferdam 2 8 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( E ) Cofferdam 3 9 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( F ) Cofferdam 4 10 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Oily Water And Grime / Muck And Present For Survey:- ( G ) Pump Room ( Bilges: 120 Sqm, Bulkheads:140 Sqm ) 11 004 Cleaning Of Internal Compartments - Asp Manually Clean Following Internal Compartments Free Of Accumulated Oily Water And Grime / Muck And Present For Survey:- ( H ) Steering Gear Room ( Bilges: 24 Sqm, Bulkheads:76 Sqm ) 12 05 Cleaning Of Void Spaces ( 06 Nos ) Manually Clean 06 Nos Void Spaces Of All Residues And Present For Survey. Note: Cleaning To Be Done With Detergent Water, Oil Absorbing / Removing Solution Or Powder, Rags, Cotton Jute Etc. Quote To Include Cost Of Cleaning Material Also. 13 006 Hull Survey - Visual Survey External And Internal Structures Carry Out Visual And Hammer Survey In Accordance With No 01 / 15 Of Under Water Hull , Boot Top Area, Above Water Hull, Super Structure, Weather Decks And All Internal Compartments ( I.E. Fw Tanks, Ballast Tanks, Fore Peak Tank, Engine Room, Steering Compartment, Fo Tanks, Cofferdams, All Stiffeners And Deck Fittings Etc. ) All Manholes To Be Inspected For Water Tightness, Chalk Impression Test To Be Carried Out. Note:- ( I ) Ls For Survey ( Ii ) Firm To Submit 07 Copies Of Hull Survey Report . 14 007 Hull Survey - Utg Survey External And Internal Structures Carry Out Utg Survey In Accordance With No 01 / 15 Of Under Water Hull , Boot Top Area, Above Water Hull, Super Structure, Weather Decks And All Internal Compartments ( I.E. Fw Tanks, Ballast Tanks, Fore Peak Tank, Engine Room, Steering Compartment, Fo Tanks, Cofferdams, All Stiffeners And Deck Fittings Etc. ) All Manholes To Be Inspected For Water Tightness, Chalk Impression Test To Be Carried Out. Note:- ( I ) Ls For Survey ( Ii ) Firm To Submit 07 Copies Of Hull Survey Report . ( Iii ) Quote For Utg Survey Points 15 008 Steel Renewal Nquote For Steel Renewal At Various Locations As Per Survey Report Nnote :- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Is 2062 Grade `B’ Quality Steel. Degutting / Regutting / Renewal Of All Obstructions In Way Of Steel Renewals Including Lagging / Panelling, Minor Fittings / Equipments With Their Foundations, Ventilation Systems, Staging Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Was Undertaken Etc. 16 009 Build Ups N ( A ) Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor Size 25 X 25 Mm 17 009 Build Ups N ( B ) Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor Size 50 X 50 Mm 18 010 Fairing Of Deformed Structure N Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team / Surveyor 19 011 Re-Welding Ncarry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team / Qc / Rmt. 20 012 Draft Marks Ndraught Marks Corroded / Eaten Away, To Be Renewed And Painted. Both Roman And Numeric. 21 013 Sacrificial Anodes N ( A ) Renew Sacrificial Anodes Those Consumed More Than 50% Type: Mk-I Note:- Anodes Will Be Supplied By Navy / Coy. 22 013 Sacrificial Anodes N ( B ) Renew Sacrificial Anodes Those Consumed More Than 50% Type: Mk-Vi Note:- Anodes Will Be Supplied By Navy / Coy. 23 014 Surface Preparation Under Water Area Nsurface Preparation To Sa 2.5 Std Using Grit Blasting On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. ( Areas Include C Channel For Rubber Fenders ) 24 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns 25 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns 26 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns 27 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns 28 015 Painting Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns 29 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Seaquantum Ultra ( Red Brown / Dark Red ) - 150 Microns 30 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns 31 016 Surface Preparation Boot Top Area Nsurface Preaparation To Sa 2.5 Standards Using Grit Blasting On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. ( Areas Include C Channel For Rubber Fenders ) 32 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 33 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns Dft 34 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns Dft 35 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns Dft 36 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns Dft 37 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Seaquantum Ultra ( Red Brown / Dark Red ) - 150 Microns Dft 38 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Black ) - 150 Microns Dft 39 018 Surface Prepartion Above Water Area And Bulwark Including Guardrails Carry Out Mechanical Cleaning To St3 Standard For Paint Application As Per Survey Report By Paint Oem Rep 40 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( A ) 1St Coat: Penguard Primer - 50 Microns Dft 41 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Jotamastic 80 ( Grey / Red Brown ) - 125 Microns Dft 42 019 Painting- Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Jotamastic 80 ( Grey / Red Brown ) - 125 Microns Dft 43 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( D ) 4Th Coat: Hard Top Xp Grey - 60 Microns Dft 44 020 Surface Prepartion Super Structure And Deck Fittings Carry Out Mechanical Cleaning To St3 Standard As Per Survey Report Of Paint Oem For Paint Application. 45 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 46 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Jotamastic 80 ( Red ) - 125 Microns Dft 47 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Jotamastic 80 ( Grey ) - 125 Microns Dft 48 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( D ) 4Th Coat: Hard Top Xp Grey 7040- 60 Microns Dft 49 022 Surface Prepartion Weather Decks Carry Out Hydro-Jet Blasting Of Entire Weather Deck, Bridge Deck And Flag Deck To Sa 2.5 Standards. 50 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 51 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Jotamastic 87 - 150 Microns Dft 52 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Jota Armour -800 Microns Dft 53 024 Surface Prepartion Internal Compartments - Fore Peak Tank, Cable Locker And Cofferdam Carry Out Mechanical Cleaning To St 3 Standard As Per Survey Report Of Paint Oem For Fore Peak Tank , Cable Locker And Cofferdam ( 04 ) . 54 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 55 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Anticorrosive - Balloxy Hb Light ( Bieze ) - 150 Microns 56 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Anticorrosive - Balloxy Hb Light ( Grey ) - 150 Microns 57 026 Surface Prepartion Internal Compartments - Pump Room And Asp Compartment Including Bilges Carry Out Mechanical Cleaning To St 3 Standard As Survey Report Of Paint Oem For Paint Application. ( I ) Pump Room ( Bilges-120 Sqm, Bulkheads-140 ) ( Ii ) Asp ( Bilges-24 Sqm, Bulkheads-76 ) 58 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 59 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anticorrosive - Jotacote Universal ( Aluminium ) - 150 Microns 60 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anticorrosive - Jotacote Universal ( Grey ) - 150 Microns 61 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Penguard Top Coat - 50 Microns. 62 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 63 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Interior Fire Retardent Paint-100 Microns 64 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Interior Fire Retardent Paint-100 Micron 65 029 Cleaing Of Ru Tanks Cleaning Of Fuel Oil Ru Tanksmanually Scrap And Clean To Bare Metal And Apply Two Coats Of Om 750 Oil In Following Tanks: Fuel Oil Ru Tanks ( 02Nos ) Note:- Quoted Cost Shall Be Inclusive Of Cost Of Oil Also. 66 030 Surafce Prepartion Bulkheads, Decks And Dadoes Of Internal Compartments Carry Out Mechanical Cleaning Of All Stores ( Naval Stores, Battery Stores, Co2 Room, Paint Stores, Pump Store, Deck Store And Eletrical Control Room ) To St 3 Standard As Survey Report Of Paint Oem For Paint Application. 67 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( A ) 1St Coat: Primer - Penguard 1X50 Microns 68 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( B ) 2Nd Coat : Jotamastic 80 Grey -1 X 150 Microns 69 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( C ) 3Rd Coat ; Burnswick Green Finishing Paint-100 Microns 70 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( A ) 1St Coat: Primer - Penguard 1X50 Microns 71 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 1St Coat: Interior Fire Retardent Paint-100 Microns 72 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 2Nd Coat: Interior Fire Retardent Paint-100 Microns 73 033 Surface Preaprtion Void Spaces Carry Out Surface Preaprtion To St 3 Standards Of Void Spaces As Survey Report Of Paint Oem For Paint Application. 74 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( A ) 1St Coat- Penguard Primer- 50 Microns 75 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( B ) 2Nd Coat Coat-Jotacoat Universal ( Al ) - 150 Microns 76 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( C ) 2Nd Coat Coat-Jotacoat Universal ( Grey ) - 150 Microns 77 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( D ) 3Rd Coat T-Penguard Top Coat- 50 Microns 78 035 Surface Preaprtion Sullage Tanks Carry Out Surface Preaprtion To St 3 Standards Of All Sullage Tanks / Fuel Tanks As Survey Report Of Paint Oem For Paint Application. 79 036 Painting Sullage Tanks - Jotun Paint Scheme Paint All Sullage Tanks With Following Paint Scheme:- ( A ) Tankguard Hb Light Grey - 150 Microns 80 036 Painting Sullage Tanks - Jotun Paint Scheme Paint All Sullage Tanks With Following Paint Scheme:- ( B ) Tankguard Hb Greyish Green - 150 Microns 81 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. Nnote : -The Job Involves Removal Of Anchors, Chain Cables And Accessories, Laying Out For Cleaning, Painting And Refitment. ( A ) Anchors - 03 82 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. ( B ) Chain Cable ( Dia 17.5Mm ) ( I ) Full Shackles- 08 ( Ii ) Half Shackles- 04 83 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( C ) Swivel Piece 84 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( D )  Lug Less Joining Shackles 85 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( E ) D - Shackles 86 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. ( F ) Chain Stopper / Compressor 87 038 Anchor Windlass Completely Strip & Overhaul Anchor Windlass, Renew Brake Linings, Refit And Prove For Satisfactory Operation. Quoted Price To Include Cost Of Liners And Spares Also. 88 039 Bollards ( A ) Twin Bollard And Foundation Corroded And Thinned. To Be Repaired / Renewed As Per Hull Survey Report. Doubler Plate Area-420Mmx420mm, Dia Of Pipe-219.1Mm, Height-1460Mm, Foundation Area-400Mmx400mmx90mm, Thickness Of Plate-10Mm Towing Gear Securing Rod Dia-50Mm. 89 039 Bollards ( B ) Towing Bollard And Foundatiosn Corroded And Thinned. To Be Repaired / Renewed As Per Hull Survey Report. Doubler Plate Area-420Mmx420mm, Dia Of Pipe-219.1Mm, Height-1460Mm, Foundation Area-400Mmx400mmx90mm, Thickness Of Plate-10Mm Towing Gear Securing Rod Dia-50Mm. 90 040 Guardrails ( A ) Fixed Verticals Guardrail Stanchions On Weather Deck Deformed / Bent From Deck. To Be Repaired / Renewed. ( Mat-Ms Angle Bar ) 91 040 Guardrails ( B ) Fixed Horizontal Guardrails On Weather Deck Deformed / Bent To Be Repaired / Renewed. ( Mat-Ms ) 92 041 Metallilc Chain Guardrails Metallic Chain Guardrails Of Stanchions Corroded To Chipped And Cleaned. Nrenewal Cost Should Include Cost Of Material Also. 93 042 Sanitry Sysytem Soil Pipes To Be Removed, Chemically Cleaned, Pressure Tested And Fitted Back In Situ. Mat: Ms , Dia: 04Inch. ( Pressure: 3Kg / Cm2 ) 94 043 Ventilation ( A ) Mushroom Type Natural Exhaust Ventilator To Be Removed, Cleaned / Overhauled And Fitted Back. Renew If Required. Details- Mush Room Head Dia-500 Mm, Height-1550 Mm 95 043 Ventilation ( B ) Mushroom Type Forced Supply Ventilator To Be Removed, Cleaned / Overhauled And Fitted Back. Renew If Required. Details- Mush Room Head Dia-370 Mm, Height-1550 Mm, 96 044 Drainage System Drain Pipe Leading From Mast Deck To 01 Deck And No. 1 Deck To Engine Room Corroded, Thinned And Holed, To Be Renewed. Mat: Gi, 03 Inch Dia. 97 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( A ) Ss Wash Basin To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. ( A ) Wash Basin 98 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. Sanitry Fittings In Crew Bathrooms And Wc To Be Renewed. ( B ) Provision Ss Tap: 1 / 2 Inch 99 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( C ) Ss Supply Pipeline Broken / Damaged To Be Renewed / Repaired. Mat : Cu-Ni, Dia: ½ Inch 100 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( D ) Drain Pipeline Broken / Damaged To Be Renewed / Repaired. Mat-Ms, Dia- 2 Inch 101 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( E ) Flush Valves To Be Renewed. Mat - Brass, Dia - 2 102 046 Fresh Water System Crew Bathrooms And Wc. .Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. ( A ) Ss Stop Cock 1’’ To Be Renewed 103 046 Fresh Water System Crew Bathrooms And Wc. ( B ) Shower Head To Be Fitted In Bathrooms Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. 104 047 Tyre Fenders Tyre Fender Damaged On P&S Side , To Be Renwed With Used Aircraft Tyre Fenders Moulded With 8 Mm White Natural Rubber. Mat- Rubber, Colour-White . No Painting Or Coating Of Any Other Form Will Be Permitted. Vendors To Adhere To Sow ( A ) Od 750Mm; Id 450 Mm , Width - 250 Mm 105 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side. ( B ) Chain Securing Brackets / Deck Eyes. 106 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( C ) Provission Of Securing Chain. 16 Mm Dia For Tyre Fenders 107 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( D ) Bush For Passing Chain On Tyres. 108 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( E ) Provision Of D Shackles For Tyre Fenders 109 048 D Shape Fenders ( A ) D Shaped Rubber Fenders Damaged / Perished To Be Renewed. Color - Grey / White Length - 1000 Mm Length Location - 44 On Shipside And 05 On Transom Material - Epdm Rubber As Per Nes170 110 048 D Shape Fenders Securing Brackets ( B ) Fender Securing Flat Bar Brackets To Be Repaired / Renewed As Necessasry. ( Mat- Ms ) . Size : 1100Mm X 110Mm X 08Mm 111 048 D Shape Fenders Securing Brackets ( C ) Fender Securing C Clamp Brackets To Be Repaired / Renewed As Necessasry. ( Mat- Ms ) . Size : 200Mm X 110Mm X 08Mm 112 049 Pneumatic Fender. ( A ) Provision Of Pneumatic Fender On ( P & S ) Side At Fwd And Aft Nspecification Of Fenders:- Size - 660X1160 Mm , Mat-Neoprene Blended Rubber Having 65 % Min Neoprene Content , Colour-White, Tensile Strength- 180 Kgf / Cm2, Elongation At Break- 400 % Min, Hardness- 700 Max, Tear Strength- Min 40 Kgf / Cm2, Compression Set- 30 % Max, Abrasion Resistance- 0.5 Cc Max. N 113 050 Pneumatic Fender Securing Arrangement ( A ) Fabrication Of Ms Eye With 08 Mm Thickness On Shipside. 114 050 Pneumatic Fender Securing Arrangement ( B ) Provision Of D Shackles, Dia 16 Mm 115 050 Pneumatic Fender Securing Arrangement ( C ) Provision Of Securing Chain 16 Mm Dia Length Rmt 4 Mtr Each 116 051 Sky Light Ss Butterfly Nuts And Tumbler Bolt Of Engine Room Sky Light &Exhaust Flaps Broken. To Be Renewed. Dia Of Bolt : 10 Mm & 6 Inch Length ( Mat-Ms ) . 117 052 Rubber Beading Rubber Beading Of Following Doors, Hatch And Skylight Perished / Cracked To Be Renewed And Chalk Test To Be Proved. ( Epdm Rubber With Shore Hardness 50 + 5O A ) ( A ) Wt Door 118 052 Rubber Beading Rubber Beading Of Following Doors, Hatch And Skylight Perished / Cracked To Be Renewed And Chalk Test To Be Proved. ( Epdm Rubber With Shore Hardness 50 + 5O A ) ( B ) Wt Hatch 119 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( A ) Forepeak Tanks 120 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( B ) Fuel / Sullage Tank 121 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( C ) Void Space 122 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( D ) Cable Locker 123 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( E ) Cofferdams 124 054 Bilge Paltform ( A ) Renew Bilge Platform Plate. Material- Aluminium Chequerd Plate, Thickness- 05 Mm 125 054 Bilge Platform ( B ) Supporting Brackets To Be Renewed Where Ever Required ( Mat - Ms ) . Securing Nut&Bolts To Be Of Mat-Ss. 126 055 Cleats Ms Cleats Perished / Thinned To Be Renewed ( Size-28 Mm ) . Quote Shall Includes Nuts Bolts And Associated Accessories 127 056 Ventilation System ( A ) Breather Pipes Of Various Tanks On Upper Deck Corroded And Thinned Including Wire Mesh, To Be Repaired / Renewed. ( Mat. Gi Pipe ) Pipe Dia 2 1 / 2 Inch 128 056 Ventilation System ( B ) Deck Distance Piece And Flanges Corroded To Be Renewed Including Rubber Joints. Dia 150Mm 129 056 Ventilation System ( C ) Ventilation Trunking Wire Mesh To Be Renewed At Damaged Areas. Size: 400Mmx600mm 130 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 131 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways.. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 132 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways.. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 133 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 134 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 135 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 136 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 137 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 138 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 139 060 Wt Hatches Wt Hatch Clips To Be Removed, Cleaned, Greased And Refitted Wt Hatch ( 0.6M X 0.6M ) 140 061 Wt Doors Wt Door Clips To Be Removed, Cleaned, Greased And Refitted Wt Doors 141 062 Nwt Nwt Wooden Door Of Wheel House Perished, To Be Repaired / Renewed Including Cylindrical Door Lock. 142 063 Manhole Rubber Joints Perished, To Be Renewed ( A ) Joints 143 063 Manhole ( B ) Studs Of Manholes Perished, To Be Renewed ( Only Defective Studs To Be Renewed As Per Survey Report ) Ms Studs With Nut, Size 20 Mm 144 063 Manhole ( C ) Manhole Covers Corroded / Thinned. To Be Renewed. Mat - Is 2062 Grade B Steel. Size - 2 X 1.5 145 064 Locking Arrangment ( A ) Mortise Locks In Accomodation Areas Defective To Be Renewed. 146 064 Locking Arrangment ( B ) Ms Hasp Staple / Locking Arrangemet On Ms Door And Hatches Corroded / Broken / Damaged To Be Renewed As Per Sample Fitted. 147 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( A ) Repair / Renewal Of Vessel Name Board Including Electroplating To Be Carried Out On Ship Side -02 148 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( B ) Vessel Illuminated Board With Perspex Sheet - 01 149 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( C ) Painting Of Vessel Name On Bulwark / Ship Side In Both Hindi And English With Fluorescent Paint -02 150 066 Furniture ( A ) Crca Kit Lockers Perished , To Be Renewed ( 90X80x45 Cm ) 151 066 Furniture ( B ) Crca Standing Lockers Perished, To Be Renewed ( 183X40x45 Cm ) 152 066 Furniture ( C ) Chairs In Crew Accomadation Persihed / Damaged , To Be Renewed 153 066 Furniture ( D ) Wooden Table Damaged / Pershed To Be Renewed 154 066 Furniture ( E ) Wood Paneling In Crew Rest Room And Wheel House Damged / Perished, To Be Renewed 155 Engineering Defect List N Nsullage Pump Engine, Make:-M / S Greaves, Model:-3Twa, Type:- ( Air Cooled, 4-Stroke, Vertical Inline, Diesel Fuelled ) , Sl No:- ( Port 1108031010027, Stbd-1108031010026 ) Rating:-25Hp, Rpm:-1500 156 1001 Nsullage Pump Engine N ( A ) Renewal Of Flexible Hoses ( En 853 2Sn Wire Braid, Dia 15 Mm, With St 1 / 4 Inch, Unf Male X Banjo 157 1001 Nsullage Pump Engine ( B ) Air Intake Filter To Be Renewed ( Part No. 271-3700-14 ) 158 1001 Nsullage Pump Engine ( C ) Renewal Of Engine Oil, Oil Will Be Supplied By Navy 159 1001 Nsullage Pump Engine ( D ) Renewal Of Corrosion Plug As Per Sample ( Dia - 10 Mm, Length- 40 Mm ) 160 1001 Nsullage Pump Engine ( E ) Renew Fuel Oil Filters Elements . ( Part No. 9451 037 401& 9451 037 420 ) 161 1001 Nsullage Pump Engine ( F ) Renewal Of Oil Filter ( Part No.500-2175-19 ) 162 1001 N Sullage Pump Engine ( G ) Engine To Be Started For Trial For 30 Minutes. 163 Sullage Pump Make:-M / S Tushaco Pump, Type:-Progressive, Cavity Screw, Model:-T1s 1450.1, Sl No:- ( Port 105182 / 5212, Stbd 105182 / 5211 ) , Capacity:-60Tph, Total Head-15Mwc, Speed-300Rpm 164 1002 N Sullage Pump ( A ) Overhauling Of Pumps To Be Done. Includes Removal, Renewal Weardown Parts And Fit Back. 165 1002 Nsullage Pump ( B ) Performance Trial For 30 Minutes Post Overhauling. 166 Stripping Pump Engine, Make:-M / S Greaves, Type:-Air Cooled, 4-Stroke, Electric Start Diesel Engine, Speed:-3000Rpm, Rating:-7.4Bhp, Sl No:- ( Port-A0l0403225, Stbd-A0l0403224 ) 167 1003 Nstripping Pump Engine ( A ) Lub Oil Sump To Be Drained, Cleaned. ( Sump Capacity 5 Liters ) 168 1003 N Stripping Pump Engine ( B ) Renew Air Filter Element 169 1003 N Stripping Pump Engine ( C ) Renew Fuel Oil Filters Element . 170 1003 N Stripping Pump Engine ( D ) Engine To Be Started For Trial For 30 Minutes. 171 Stripping Pump Make:-M / S B E Pump, Model:-Sh80-140N1-Dgs2-316, Type:-Horizontal, Self-Priming, Centrifugal, Capacity:-60Tph, Total Head:-15Mwc, Sl No:-Port-358898, Stbd-358899. 172 1004 Nstripping Pump ( A ) Overhauling Of Pumps Includes Removal, Renewal Weardown Parts ( Shaft, Mechanical Seals, Impeller, Gaskets ) And Fitted Back. 173 1004 Nstripping Pump ( B ) Performance Trial For 30 Minutes Post Overhauling. 174 Genset Make:-Kirloskar, Type:-Ha394, Sl No:-03.2017 / 1021253, Rating:-23.55Kw, 32Hp 175 1005 N Diesel Generator N ( A ) Renewal Of Flexible Hoses ( En 853 2Sn Wire Braid, Dia 15 Mm, With St 1 / 4 Inch, Unf Male X Banjo ) 176 1005 N Diesel Generator N ( B ) Air Intake Filter To Be Renewed. 177 1005 N Diesel Generator ( C ) Renewal Of Engine Oil Qty-10Ltr, Oil Will Be Supplied By Navy 178 1005 N Diesel Generator N ( E ) Renewal Of Fuel Filters ( Pre Filter &Micro Filter Element ) ( Part No. 34.032.02.0 & 34.032.03.0 ) 179 1005 N Diesel Generator ( F ) Renewal Of Oil Filter ( Part No. 03.040.19.0 ) 180 1005 Ndiesel Generator ( G ) Engine To Be Started For Trial For 30 Minutes. 181 Valve To Be Overhauled Make-Vijoli, Type-Screw Down, Overhauling Includes Renewal Of Wear Down Parts ( Spindle, Disc ) , Mat- Gm 182 1006 N Valves ( A ) Dia 150 Mm 183 1006 N Valves ( B ) Dia 50 Mm 184 1006 N Valves N ( C ) Dia 15 Mm 185 1006 N Valves N ( D ) Dia 80 Mm 186 Rubber Expansion Bellow ( With Flange ) To Be Renewed. Working Pr- 5 Bar, Fluid- Sullage Oil 187 1007 Nbellows N ( A ) Dia 150 Mm 188 1007 Nbellows N ( B ) Dia 80 Mm 189 Three Way Plug Cock To Be Overhauled, Mat - Ss 190 1008 Ncocks N ( A ) Dia 150 Mm 191 1008 Ncocks ( B ) Dia 80 Mm 192 Semi Rotary Hand Pump To Be Overhauled Make-Venus, Model-N97 193 1009 N Hand Pumps ( A ) Pump To Be Overhauled Includes Renewal Of Wear Down Parts. 194 1009 Nhand Pumps ( B ) Wooden Handled To Be Renewed. 195 1010 Noverhauling Of System V / V Nvalves N ( A ) Sdnr Globe V / V . Dia - 150 Mm 196 1010 Noverhauling Of System V / V Nvalves N ( B ) Sdnr Globe Suction V / V Of Sullage Tank. Dia- 80 Mm 197 1011 Nrelief Valve 80Mm Dia Relief Valve To Be Removed, Overhauled, Calibrate ( Pr-04Bar ) And Fitted Back. 198 Glycerine Filled Bourden Pr Gauges To Be Renewed, Make-An Instruments 199 1012 Npr. Gauges ( A ) Range:- -01 To 01 Kg ( Suction Pr Gauge ) 200 1012 N Pr. Gauges ( B ) Range:- 0 To 04 Kg ( Discharge Gauge ) 201 Co2 Fire Fighting Sytem Maker:-Shm Ship Care ( All Procedures To Be Carried As Mentioned Below And Replace Defective Parts If Required ) 202 1013 Nco2 Fire Fighting System ( A ) Co2 Cylinders To Be Removed, Chemically Cleaned, Pressure Tested And Recharged With 45Kg Co2 203 1013 Nco2 Fire Fighting System ( B ) Non Return Valves On Cylinder Heads To Be Overhauled. 204 1013 Nco2 Fire Fighting System ( C ) Co2 Discharge Nozzles To Be Opened, Checked For Chockages, Cleaned And Fitted Back 205 1013 Nco2 Fire Fighting System ( D ) Overhaul Of Relief Valve Assembly 206 1013 Nco2 Fire Fighting System ( E ) Overhaul Of Pressure Operated Switch 207 1013 Nco2 Fire Fighting System ( F ) Complete Co2 System Piping To Be Blown Through Using Hp Air To Prove System Free Of Blockages 208 1013 Nco2 Fire Fighting System ( G ) Co2 Cylinders ( 45 Kg Capacty ) And System Pipes To Be Painted As Per Coding Post Work Completion. 209 1013 Nco2 Fire Fighting System N ( H ) All System Pipes ( Dia-20 Mm ) To Be Painted As Per Coding Post Work Completion. 210 1013 Nco2 Fire Fighting System ( J ) Renewal Of Flexible Hoses As Per Sample ( Pr 275Bar ) 211 1013 Nco2 Fire Fighting System ( K ) Actuator To Be Overhauled Operated By N2 212 1013 Nco2 Fire Fighting System N ( L ) Solenoid To Be Checked For Operation And Renewed If Declared Ber. 213 1013 Nco2 Fire Fighting System N ( M ) Both Nitrogen Cylinders To Be Removed, Chemically Cleaned, Pressure Tested And Recharged With 10 Ltr N2 Each 214 1013 Nco2 Fire Fighting System ( N ) Pr Gauges To Be Renewed, Make-Wikarange-400 Kg / Cm2 215 1013 Nco2 Fire Fighting System N ( P ) Pr Gauges To Be Renewed, Make-Wikarange-200 Kg / Cm2 216 1013 Nco2 Fire Fighting System ( Q ) Undertake Testing Of The Co2 System As Follows: 217 1013 Nco2 Fire Fighting System N ( I ) Lamp Checks Of Various Indication In The Control Panel. Replace If Defective 218 1013 Nco2 Fire Fighting System ( Ii ) Open Pilot Control Box To Check Indication On The Panel 219 1013 Nco2 Fire Fighting System ( Iii ) Check Klaxon Horn And Strobe Comes On. 220 1013 Nco2 Fire Fighting System ( Iv ) Check Hooter And Fire Detector Replace If Defective. 221 1013 N Co2 Fire Fighting System N ( Q ) Pull Pressure Switch Knob Of Pr Swicth For Premature Discharge To Check Indication On The Panel. Pull The Pr Switch Knob For Co2 Discharge Indication. Check Indication Panel. The Premature Discharge Indication Shall Go Off. Reset Both The Knob After This Operation. The Indications Shoukd Go Off. Nnote: The Entire Co2 System To Be Proved For Functional Checks Without Co2 222 1014 N Misc Renewal Of Flexible Hoses On Discharge Side Of Hand Pump. Dia-65 Mm , Length 05 Mtr Each 223 1015, Nmisc Sounding Caps Of Tanks Damaged To Be Opened, Manufactured As Per Sample 224 1016 N Misc Cleaning / Renewal Of Sight Glass Of Ru Tank. Overhaul Spring Loaded Check Valve Of Both Tanks. Joints To Be Renewed And Fitted Back. 225 1017 Nmisc Nquick Shut Off Valves Of The Fuel Tanks To Be Overhauled. Arrangement Of The System Involved To Be Overhauled For Operating From Remote Position. ( Deck ) 226 1018 Nmisc Hydrant V / V And Fire Hydrants To Be Overhauled And Made Operational Dia- 50 Mm 227 Electrical Defect List N Neqpt / System: 3Ph 3Wire Sine Wave Invertor;Ac Input 415V, 3Ph;Dc Input 360V;Ac Out Put -415V, 3Ph, Sine Wave 228 2001 Ninverter Ncarry Out Overhauling / Checking / Fault Rectification Of Invertor And Made It Operational.Presently Mother Board Is Not Working. 229 2002 Nbatteries Nrenew The Sealed Maintance Free Lead Acid Batteries2000ah, 12V. Make: Exide 230 2003, Neqpt / System:Msb Nmsb N ( A ) Msb To Be Overhauled ( Includes Defective Switches To Be Renwed, Perished Control Wiring To Be Renewed With Crimping Of Proper Lugs, Marking Sleeves To Be Put On Control Wiring And Loose Wirng To Be Tied With Cable Ties ) ( Presently There Is No Deffective Parts, All Components Are Working. ) . Carryout Routines Mentioned Below And Prove Them For Satisfactory Performance. ( Calibration Certificates / Test Reports From Nabl Recognised Labs Are To Be Submitted. ) N N N N 231 2003 , Neqpt / System:Msb N Msb N ( B ) De-Energise Switchboard. Remove All Busbars, Insulators, Cts, Pts, Junction Boxes, Switch Contact Surfaces, Fuse Bases / Carriers And Other Components. Clean And Decarbonise The Busbar Using Soft Brush / Calico Cloth Dipped In Alcohol. Thoroughly Clean And Ascertain The Soundness Of These Components. Repair / Replaced Them As Required. 232 2003 Neqpt / System:Msb N Msb ( C ) Inspect Cables And Bus Bar . Replace All Defective Cables, Wirings, Lugs And Termination. Tighten Electrical Connections And Fasteners ( Cable -100 Mtr, 1 Sqm For 02 Sections ) 233 2003, Neqpt / System:Msb Nmsb ( D ) Apply Loctite ( Or Equivalent Compound ) To All Loose Screw / Nuts Of Breaker Asemblies. 234 2003 Neqpt / System:Msb N Msb ( E ) Examine Actuating Mechanism And Condition Of Contacts. Carry Out Repairs / Cleaning / Lubrication Of All Mechanical Parts And Contacts And Check For Satisfactory Operations 235 2003 Neqpt / System:Msb N Msb ( F ) Rubber Mat : Insulating Rubber Mat Deteriorated. To Be Renewed With Oil Resistance & Very High Voltage Resistance Electrical Rubber Mat In Front Of Msb. ( Thickness- 3Mm ) Make Vardhaman Model Class C 236 2004 Nbattery Charging System Provide Battery Chargering System 12V, Dc From Shore Supply System For Dg Starting Battery-1No At 1 Deck, & Sullage Pump Engines Starting Batteries 12V, 180Ah-4 Nos At Pump Room 237 2005 Nnav Lights Nrenew The Port Navigational Light Fitting Two Stair Type ( 230V, Ac & 24V Dc ) 238 2006 Ndynamos N Over Hauling 12V, Dc Dynamos Make:Tvs 239 2007 Nstarters Nover Hauling Of Self Starters 12V, 3Hp Dc Make:Tvs 240 2008 Ndg Starting System Ncarry Out Overhauling / Checking / Fault Rectification Of Engine Control & Starting Wiring System And Made It Operational.Renew The Any Deffective Parts ( Presently All Working ) 241 2009 Nmisc Renew The3core 25 Sq.Mm Multy Stand Copper Marine Shore Supply Cable. 242 2010 Neqpt / System: Shore Supply Pannel N Shore Supply Panel Carry Out Overhaul Of Shore Supply Pannel.Required To Renew The Window Glass ( 8X8 ) 243 2011 Neqpt / System: Motors N Motors Carry Out Overhaul Of 2 In Nos Blower Motors 415V.3Ph, 3Hp-1No, 230V, 1Ph, .25Hp-1No 244 2012 Neqpt / System: Ship Name Board Nmisc N ( A ) Renew The Acrylic 4Mm Sheet For Name Board Size:4X2.5 245 2012 Neqpt / System: Ship Name Board Nmisc ( B ) Renew The Led Tube Lights 20W, 2, 230V Ac 246 2013 Neqpt / System: Wall Mounted Fans Nmisc Nrenew The Wall Mounted Fans 300Mm Sweep, 230V Make:Bajaj / Philps 247 2014 Neqpt / System:Flood Lights Nmisc Renew The Led Flood Lamp 230V, 200W 248 Dry Dock And Allied Services Work Packages N N ( A ) Docking And Undocking Charges ( Both Versions ) 249 ( B ) Dock Blocks Preparation & Laying Out As Per Docking Plan 250 Dock Hire Charges For An Estimated Duration Of 60 Days As Per Ocr 251 Wet Basin / Alongside Hire Charges For The Remaining Duration ( I.E. Total Refit Duration Of – 60 Days Docking Period ) 252 Provision Of Sufficient Lighting For Duty Staff 253 Quote For Maintenance Of Two In No. Fire Lines For The Refit Duration . 254 Provision Of Two Transports ( Cars ) For Entire Refit Duration ( One For Refit Co-Ordinating Staff And One For Nd ( V ) Monitoring Team ) For 12 Hrs Or 100Km / Day Whichever Is Less 255 Provision Of Stationory / Office Items For Nd ( V ) / Refit Monitoring Team For Entire Refit Duration Period.Cater Budget Of Rs 2000 / - Per Month.Requirement Will Be Intimated Rmt / Ndv On As Requirement Basis.Payment At Actuals. Nnote:- Firms To Quote. 256 Mail Man Services ( 02 Nos ) For Entire Refit Duration ( One For User Department And One For Planning / Co-Ordinating Department ) To Be Provided For 10 Hrs Per Day 257 Qc Inspection For The Entire Scope Of Work By Third Party Irs / Lrs / Abs / Qc / Tpi For The Refit Duration As Per The Qis.
Basic Detail
Tender No COM/0336/SB V/NR O/L-20A
Bidding Type Tender
Location
City NAVAL DOCKYARD VISAKHAPATNAM
State Andhra Pradesh
Key Dates
Publish Date 13 Nov 2019
Submission Date 05 Dec 2019
Open Date 06 Dec 2019
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 7.86 Lakhs
Exemption Not Available
Document List
8621E98C-79E8-4223-8602-AB0F6ED54A3B.html
BOQ_333655.xls
Tendernotice_1.pdf
RFPSBV.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 13, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 05, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 06, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

8621E98C-79E8-4223-8602-AB0F6ED54A3B.html

xls

BOQ_333655.xls

pdf

Tendernotice_1.pdf

pdf

RFPSBV.pdf

TenderDetail
Loading tenders