Tender For Offloading Nr Of Sullage Barge, NAVAL DOCKYARD VISAKHAPATNAM-Andhra Pradesh

Indian Navy-IN has published Tender For Offloading Nr Of Sullage Barge. Submission Date for this Tender is 05-12-2019. Loading Work Tenders in NAVAL DOCKYARD VISAKHAPATNAM Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

22486799
Tender For Offloading Nr Of Sullage Barge
Open Tender
Indian
Andhra Pradesh
NAVAL DOCKYARD VISAKHAPATNAM
05-12-2019

Tender Details

Tender For Offloading Nr Of Sullage Barge=1 Work Pakage For Nr Sb-I Nhull Defect List N001 Ndocking Nvessel To Be Docked In Both Versions. Nnote 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises ( I.E Nd ( V ) Slipway / Drydock ) . Nnote 2:- Last Docked In Version I On 22 Aug 2017 N 2 002 Cleaning Of Under Water Hull And Boot Top Area Hp Jet Cleaning Of Entire Under Water Area And Boot Top Area ( With A Pressure Not Exceeding 3000 Psi ) Remove The Marine Growth / Barnacles And Prepare For Survey. Note:- ( I ) U / W Area: 425 Sqm Including Boot Top 3 003 Cleaning Of Internal Compartments - Sullage Tanks ( 06 Nos ) Manually Clean Fuel Tanks Free Of Accumulated Fuel And Residual Muck And Present For Survey. 4 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey. ( A ) Cable Locker 5 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey. ( B ) Forepeak Tank 6 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( C ) Cofferdam 1 7 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( D ) Cofferdam 2 8 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( E ) Cofferdam 3 9 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Water And Residual Muck And Present For Survey:- ( F ) Cofferdam 4 10 004 Cleaning Of Internal Compartments Manually Clean Following Internal Compartments Free Of Accumulated Oily Water And Grime / Muck And Present For Survey:- ( G ) Pump Room ( Bilges: 120 Sqm, Bulkheads:140 Sqm ) 11 004 Cleaning Of Internal Compartments - Asp Manually Clean Following Internal Compartments Free Of Accumulated Oily Water And Grime / Muck And Present For Survey:- ( H ) Steering Gear Room ( Bilges: 24 Sqm, Bulkheads:76 Sqm ) 12 05 Cleaning Of Void Spaces ( 06 Nos ) Manually Clean 06 Nos Void Spaces Of All Residues And Present For Survey. Note: Cleaning To Be Done With Detergent Water, Oil Absorbing / Removing Solution Or Powder, Rags, Cotton Jute Etc. Quote To Include Cost Of Cleaning Material Also. 13 006 Hull Survey - Visual Survey External And Internal Structures Carry Out Visual And Hammer Survey In Accordance With No 01 / 15 Of Under Water Hull , Boot Top Area, Above Water Hull, Super Structure, Weather Decks And All Internal Compartments ( I.E. Fw Tanks, Ballast Tanks, Fore Peak Tank, Engine Room, Steering Compartment, Fo Tanks, Cofferdams, All Stiffeners And Deck Fittings Etc. ) All Manholes To Be Inspected For Water Tightness, Chalk Impression Test To Be Carried Out. Note:- ( I ) Ls For Survey ( Ii ) Firm To Submit 07 Copies Of Hull Survey Report . 14 007 Hull Survey - Utg Survey External And Internal Structures Carry Out Utg Survey In Accordance With No 01 / 15 Of Under Water Hull , Boot Top Area, Above Water Hull, Super Structure, Weather Decks And All Internal Compartments ( I.E. Fw Tanks, Ballast Tanks, Fore Peak Tank, Engine Room, Steering Compartment, Fo Tanks, Cofferdams, All Stiffeners And Deck Fittings Etc. ) All Manholes To Be Inspected For Water Tightness, Chalk Impression Test To Be Carried Out. Note:- ( I ) Ls For Survey ( Ii ) Firm To Submit 07 Copies Of Hull Survey Report . ( Iii ) Quote For Utg Survey Points 15 008 Steel Renewal Nquote For Steel Renewal At Various Locations As Per Survey Report Nnote :- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Is 2062 Grade `B’ Quality Steel. Degutting / Regutting / Renewal Of All Obstructions In Way Of Steel Renewals Including Lagging / Panelling, Minor Fittings / Equipments With Their Foundations, Ventilation Systems, Staging Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Was Undertaken Etc. 16 009 Build Ups N ( A ) Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor Size 25 X 25 Mm 17 009 Build Ups N ( B ) Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor Size 50 X 50 Mm 18 010 Fairing Of Deformed Structure N Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team / Surveyor 19 011 Re-Welding Ncarry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team / Qc / Rmt. 20 012 Draft Marks Ndraught Marks Corroded / Eaten Away, To Be Renewed And Painted. Both Roman And Numeric. 21 013 Sacrificial Anodes N ( A ) Renew Sacrificial Anodes Those Consumed More Than 50% Type: Mk-I Note:- Anodes Will Be Supplied By Navy / Coy. 22 013 Sacrificial Anodes N ( B ) Renew Sacrificial Anodes Those Consumed More Than 50% Type: Mk-Vi Note:- Anodes Will Be Supplied By Navy / Coy. 23 014 Surface Preparation Under Water Area Nsurface Preparation To Sa 2.5 Std Using Grit Blasting On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. ( Areas Include C Channel For Rubber Fenders ) 24 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns 25 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns 26 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns 27 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns 28 015 Painting Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns 29 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Seaquantum Ultra ( Red Brown / Dark Red ) - 150 Microns 30 015 Painting Under Water Area - Jotun Scheme. Paint Under Water Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns 31 016 Surface Preparation Boot Top Area Nsurface Preaparation To Sa 2.5 Standards Using Grit Blasting On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. ( Areas Include C Channel For Rubber Fenders ) 32 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 33 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns Dft 34 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns Dft 35 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns Dft 36 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F: Seaquantum Ultra ( Brown / Light Red ) - 150 Microns Dft 37 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Seaquantum Ultra ( Red Brown / Dark Red ) - 150 Microns Dft 38 017 Painting Boot Top Area - Jotun Scheme. Paint Boot Top Area With Following Paint Scheme. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Black ) - 150 Microns Dft 39 018 Surface Prepartion Above Water Area And Bulwark Including Guardrails Carry Out Mechanical Cleaning To St3 Standard For Paint Application As Per Survey Report By Paint Oem Rep 40 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( A ) 1St Coat: Penguard Primer - 50 Microns Dft 41 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Jotamastic 80 ( Grey / Red Brown ) - 125 Microns Dft 42 019 Painting- Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Jotamastic 80 ( Grey / Red Brown ) - 125 Microns Dft 43 019 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( D ) 4Th Coat: Hard Top Xp Grey - 60 Microns Dft 44 020 Surface Prepartion Super Structure And Deck Fittings Carry Out Mechanical Cleaning To St3 Standard As Per Survey Report Of Paint Oem For Paint Application. 45 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 46 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Jotamastic 80 ( Red ) - 125 Microns Dft 47 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Jotamastic 80 ( Grey ) - 125 Microns Dft 48 021 Painting Super Structure And Deck Fittings - Jotun Scheme. Paint Superstructure Area With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( D ) 4Th Coat: Hard Top Xp Grey 7040- 60 Microns Dft 49 022 Surface Prepartion Weather Decks Carry Out Hydro-Jet Blasting Of Entire Weather Deck, Bridge Deck And Flag Deck To Sa 2.5 Standards. 50 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 51 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Jotamastic 87 - 150 Microns Dft 52 023 Painting Paint Weather Decks - Jotun Scheme. Paint Weather Decks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Jota Armour -800 Microns Dft 53 024 Surface Prepartion Internal Compartments - Fore Peak Tank, Cable Locker And Cofferdam Carry Out Mechanical Cleaning To St 3 Standard As Per Survey Report Of Paint Oem For Fore Peak Tank , Cable Locker And Cofferdam ( 04 ) . 54 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 55 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( B ) 2Nd Coat: Anticorrosive - Balloxy Hb Light ( Bieze ) - 150 Microns 56 025 Painting Fore Peak Tanks, Ballast Tanks And Cable Locker - Jotun Scheme. Paint Fore Peak Tanks, Ballast Tanks And Cable Locker With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also ( C ) 3Rd Coat: Anticorrosive - Balloxy Hb Light ( Grey ) - 150 Microns 57 026 Surface Prepartion Internal Compartments - Pump Room And Asp Compartment Including Bilges Carry Out Mechanical Cleaning To St 3 Standard As Survey Report Of Paint Oem For Paint Application. ( I ) Pump Room ( Bilges-120 Sqm, Bulkheads-140 ) ( Ii ) Asp ( Bilges-24 Sqm, Bulkheads-76 ) 58 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 59 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anticorrosive - Jotacote Universal ( Aluminium ) - 150 Microns 60 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anticorrosive - Jotacote Universal ( Grey ) - 150 Microns 61 027 Painting Machinery Bilges - Jotun Scheme. Paint Bilges Of Pump Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Penguard Top Coat - 50 Microns. 62 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 63 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Interior Fire Retardent Paint-100 Microns 64 028 Painting Bulkheads Of Pump Room And Asp - Jotun Scheme. Paint Bulkheads And Deckheads Of Pump Room And Asp Compartments With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Interior Fire Retardent Paint-100 Micron 65 029 Cleaing Of Ru Tanks Cleaning Of Fuel Oil Ru Tanksmanually Scrap And Clean To Bare Metal And Apply Two Coats Of Om 750 Oil In Following Tanks: Fuel Oil Ru Tanks ( 02Nos ) Note:- Quoted Cost Shall Be Inclusive Of Cost Of Oil Also. 66 030 Surafce Prepartion Bulkheads, Decks And Dadoes Of Internal Compartments Carry Out Mechanical Cleaning Of All Stores ( Naval Stores, Battery Stores, Co2 Room, Paint Stores, Pump Store, Deck Store And Eletrical Control Room ) To St 3 Standard As Survey Report Of Paint Oem For Paint Application. 67 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( A ) 1St Coat: Primer - Penguard 1X50 Microns 68 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( B ) 2Nd Coat : Jotamastic 80 Grey -1 X 150 Microns 69 031 Painting Internal Compartments Decks And Dadoes- Jotun Scheme. Carry Out Painting Of Internal Compartments Decks And Dadoes At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( C ) 3Rd Coat ; Burnswick Green Finishing Paint-100 Microns 70 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. ( A ) 1St Coat: Primer - Penguard 1X50 Microns 71 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 1St Coat: Interior Fire Retardent Paint-100 Microns 72 032 Painting Internal Compartments Bulkheads - Jotun Scheme. Carry Out Painting Of Internal Compartments Bulkheads And Deck Heads Area At Following Locations:- Naval Store, Battery Store, Co2 Room, Paint Store, Pump Store, Deck Store And Eletrical Control Room. Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 2Nd Coat: Interior Fire Retardent Paint-100 Microns 73 033 Surface Preaprtion Void Spaces Carry Out Surface Preaprtion To St 3 Standards Of Void Spaces As Survey Report Of Paint Oem For Paint Application. 74 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( A ) 1St Coat- Penguard Primer- 50 Microns 75 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( B ) 2Nd Coat Coat-Jotacoat Universal ( Al ) - 150 Microns 76 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( C ) 2Nd Coat Coat-Jotacoat Universal ( Grey ) - 150 Microns 77 034 Painting Void Spaces - Jotun Scheme. Carry Out Painting Of 06 Void Spaces With Following Paint Scheme ( D ) 3Rd Coat T-Penguard Top Coat- 50 Microns 78 035 Surface Preaprtion Sullage Tanks Carry Out Surface Preaprtion To St 3 Standards Of All Sullage Tanks / Fuel Tanks As Survey Report Of Paint Oem For Paint Application. 79 036 Painting Sullage Tanks - Jotun Paint Scheme Paint All Sullage Tanks With Following Paint Scheme:- ( A ) Tankguard Hb Light Grey - 150 Microns 80 036 Painting Sullage Tanks - Jotun Paint Scheme Paint All Sullage Tanks With Following Paint Scheme:- ( B ) Tankguard Hb Greyish Green - 150 Microns 81 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. Nnote : -The Job Involves Removal Of Anchors, Chain Cables And Accessories, Laying Out For Cleaning, Painting And Refitment. ( A ) Anchors - 03 82 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. ( B ) Chain Cable ( Dia 17.5Mm ) ( I ) Full Shackles- 08 ( Ii ) Half Shackles- 04 83 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( C ) Swivel Piece 84 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( D )  Lug Less Joining Shackles 85 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. N ( E ) D - Shackles 86 037 Anchor And Anchor Chain Cable. Anchor And Anchor Chain Cable And Associated Fittings Are To Be Hydro Jet Blasted To Bare Metal, Eased For Free Movement And To Present For Survey At Ndv / Mfab Dept. Paint With Black Bituminous Paint Post Survey Iaw No 12 / 2001 And Refit Back. ( F ) Chain Stopper / Compressor 87 038 Anchor Windlass Completely Strip & Overhaul Anchor Windlass, Renew Brake Linings, Refit And Prove For Satisfactory Operation. Quoted Price To Include Cost Of Liners And Spares Also. 88 039 Bollards ( A ) Twin Bollard And Foundation Corroded And Thinned. To Be Repaired / Renewed As Per Hull Survey Report. Doubler Plate Area-420Mmx420mm, Dia Of Pipe-219.1Mm, Height-1460Mm, Foundation Area-400Mmx400mmx90mm, Thickness Of Plate-10Mm Towing Gear Securing Rod Dia-50Mm. 89 039 Bollards ( B ) Towing Bollard And Foundatiosn Corroded And Thinned. To Be Repaired / Renewed As Per Hull Survey Report. Doubler Plate Area-420Mmx420mm, Dia Of Pipe-219.1Mm, Height-1460Mm, Foundation Area-400Mmx400mmx90mm, Thickness Of Plate-10Mm Towing Gear Securing Rod Dia-50Mm. 90 040 Guardrails ( A ) Fixed Verticals Guardrail Stanchions On Weather Deck Deformed / Bent From Deck. To Be Repaired / Renewed. ( Mat-Ms Angle Bar ) 91 040 Nguardrails N ( B ) Fixed Horizontal Guardrails On Weather Deck Deformed / Bent To Be Repaired / Renewed. N ( Mat-Ms ) 92 041 Metallilc Chain Guardrails Metallic Chain Guardrails Of Stanchions Corroded To Chipped And Cleaned. Nrenewal Cost Should Include Cost Of Material Also. 93 042 Sanitry Sysytem Soil Pipes To Be Removed, Chemically Cleaned, Pressure Tested And Fitted Back In Situ. Mat: Ms , Dia: 04Inch. ( Pressure: 3Kg / Cm2 ) 94 043 Ventilation ( A ) Mushroom Type Natural Exhaust Ventilator To Be Removed, Cleaned / Overhauled And Fitted Back. Renew If Required. Details- Mush Room Head Dia-500 Mm, Height-1550 Mm 95 043 Ventilation ( B ) Mushroom Type Forced Supply Ventilator To Be Removed, Cleaned / Overhauled And Fitted Back. Renew If Required. Details- Mush Room Head Dia-370 Mm, Height-1550 Mm, 96 044 Drainage System Drain Pipe Leading From Mast Deck To 01 Deck And No. 1 Deck To Engine Room Corroded, Thinned And Holed, To Be Renewed. Mat: Gi, 03 Inch Dia. 97 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( A ) Ss Wash Basin To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. ( A ) Wash Basin 98 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. Sanitry Fittings In Crew Bathrooms And Wc To Be Renewed. ( B ) Provision Ss Tap: 1 / 2 Inch 99 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( C ) Ss Supply Pipeline Broken / Damaged To Be Renewed / Repaired. Mat : Cu-Ni, Dia: ½ Inch 100 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( D ) Drain Pipeline Broken / Damaged To Be Renewed / Repaired. Mat-Ms, Dia- 2 Inch 101 045 Sanitry System Sanitry Fittingss In Crew Bathrooms And Wc. ( E ) Flush Valves To Be Renewed. Mat - Brass, Dia - 2 102 046 Fresh Water System Crew Bathrooms And Wc. .Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. ( A ) Ss Stop Cock 1’’ To Be Renewed 103 046 Fresh Water System Crew Bathrooms And Wc. ( B ) Shower Head To Be Fitted In Bathrooms Note:- Quoted Repair Cost Shall Include Cost All Items / Spares. 104 047 Tyre Fenders Tyre Fender Damaged On P&S Side , To Be Renwed With Used Aircraft Tyre Fenders Moulded With 8 Mm White Natural Rubber. Mat- Rubber, Colour-White . No Painting Or Coating Of Any Other Form Will Be Permitted. Vendors To Adhere To Sow ( A ) Od 750Mm; Id 450 Mm , Width - 250 Mm 105 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side. ( B ) Chain Securing Brackets / Deck Eyes. 106 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( C ) Provission Of Securing Chain. 16 Mm Dia For Tyre Fenders 107 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( D ) Bush For Passing Chain On Tyres. 108 047 Tyre Fenders Provision Of Securing Arrangment In All Tyre Fenders For Fitment On Ship Side ( E ) Provision Of D Shackles For Tyre Fenders 109 048 D Shape Fenders ( A ) D Shaped Rubber Fenders Damaged / Perished To Be Renewed. Color - Grey / White Length - 1000 Mm Length Location - 44 On Shipside And 05 On Transom Material - Epdm Rubber As Per Nes170 110 048 D Shape Fenders Securing Brackets ( B ) Fender Securing Flat Bar Brackets To Be Repaired / Renewed As Necessasry. ( Mat- Ms ) . Nsize : 1100Mm X 110Mm X 08Mm 111 048 D Shape Fenders Securing Brackets ( C ) Fender Securing C Clamp Brackets To Be Repaired / Renewed As Necessasry. ( Mat- Ms ) . Size : 200Mm X 110Mm X 08Mm 112 049 Pneumatic Fender. ( A ) Provision Of Pneumatic Fender On ( P & S ) Side At Fwd And Aft Specification Of Fenders:- Size - 660X1160 Mm , Mat-Neoprene Blended Rubber Having 65 % Min Neoprene Content , Colour-White, Tensile Strength- 180 Kgf / Cm2, Elongation At Break- 400 % Min, Hardness- 700 Max, Tear Strength- Min 40 Kgf / Cm2, Compression Set- 30 % Max, Abrasion Resistance- 0.5 Cc Max. N 113 050 Pneumatic Fender Securing Arrangement ( A ) Fabrication Of Ms Eye With 08 Mm Thickness On Shipside. 114 050 Pneumatic Fender Securing Arrangement ( B ) Provision Of D Shackles, Dia 16 Mm 115 050 Pneumatic Fender Securing Arrangement ( C ) Provision Of Securing Chain 16 Mm Dia Length Rmt 4 Mtr Each 116 051 Sky Light Ss Butterfly Nuts And Tumbler Bolt Of Engine Room Sky Light &Exhaust Flaps Broken. To Be Renewed. Dia Of Bolt : 10 Mm & 6 Inch Length ( Mat-Ms ) . 117 052 Rubber Beading Rubber Beading Of Following Doors, Hatch And Skylight Perished / Cracked To Be Renewed And Chalk Test To Be Proved. ( Epdm Rubber With Shore Hardness 50 + 5O A ) ( A ) Wt Door 118 052 Rubber Beading Rubber Beading Of Following Doors, Hatch And Skylight Perished / Cracked To Be Renewed And Chalk Test To Be Proved. ( Epdm Rubber With Shore Hardness 50 + 5O A ) ( B ) Wt Hatch 119 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( A ) Forepeak Tanks 120 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( B ) Fuel / Sullage Tank 121 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( C ) Void Space 122 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( D ) Cable Locker 123 053 Apt Air Pressure Test Of The Following Tanks To Be Undertaken And Rectify The Defects If Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Nnote:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. ( E ) Cofferdams 124 054 Bilge Paltform ( A ) Renew Bilge Platform Plate. Material- Aluminium Chequerd Plate, Thickness- 05 Mm 125 054 Bilge Platform ( B ) Supporting Brackets To Be Renewed Where Ever Required ( Mat - Ms ) . Securing Nut&Bolts To Be Of Mat-Ss. 126 055 Cleats Ms Cleats Perished / Thinned To Be Renewed ( Size-28 Mm ) . Quote Shall Includes Nuts Bolts And Associated Accessories 127 056 Ventilation System ( A ) Breather Pipes Of Various Tanks On Upper Deck Corroded And Thinned Including Wire Mesh, To Be Repaired / Renewed. ( Mat. Gi Pipe ) Pipe Dia 2 1 / 2 Inch 128 056 Ventilation System ( B ) Deck Distance Piece And Flanges Corroded To Be Renewed Including Rubber Joints. Dia 150Mm 129 056 Ventilation System ( C ) Ventilation Trunking Wire Mesh To Be Renewed At Damaged Areas. Size: 400Mmx600mm 130 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 131 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways.. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 132 057 Deck Underlay Dry Compatments Deck Underlay ( Macrotech ) To Be Repaired / Renewed At Uprooted / Damaged / Steel Renewed, Accommodation Areas, Wheel House And Alleways.. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 133 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 134 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 135 058 Deck Underlay Wet Compartments Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms At Uprooted / Damaged / Steel Renewed. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 136 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( A ) Surface Preparation And Application Of Erop. And Mass 98. 137 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( B ) Surface Preparation To Be Carried Out By Buffing On Mass 98 And Application Of Mass 96. 138 059 Deck Underlay Dadoe Area Deck Underlay ( Macrotech ) To Be Repaired / Renewed In Bathrooms. ( C ) Surface Preparation And Application Of Sealer Coat On Entire Area 139 060 Wt Hatches Wt Hatch Clips To Be Removed, Cleaned, Greased And Refitted Wt Hatch ( 0.6M X 0.6M ) 140 061 Wt Doors Wt Door Clips To Be Removed, Cleaned, Greased And Refitted Wt Doors 141 062 Nwt Nwt Wooden Door Of Wheel House Perished, To Be Repaired / Renewed Including Cylindrical Door Lock. 142 063 Manhole Rubber Joints Perished, To Be Renewed ( A ) Joints 143 063 Manhole ( B ) Studs Of Manholes Perished, To Be Renewed ( Only Defective Studs To Be Renewed As Per Survey Report ) Ms Studs With Nut, Size 20 Mm 144 063 Manhole ( C ) Manhole Covers Corroded / Thinned. To Be Renewed. Mat - Is 2062 Grade B Steel. Size - 2 X 1.5 145 064 Locking Arrangment ( A ) Mortise Locks In Accomodation Areas Defective To Be Renewed. 146 064 Locking Arrangment ( B ) Ms Hasp Staple / Locking Arrangemet On Ms Door And Hatches Corroded / Broken / Damaged To Be Renewed As Per Sample Fitted. 147 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( A ) Repair / Renewal Of Vessel Name Board Including Electroplating To Be Carried Out On Ship Side -02 148 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( B ) Vessel Illuminated Board With Perspex Sheet - 01 149 065 Name Board Following Name Board Perished / Damaged, To Be Renewed / Repaired. ( C ) Painting Of Vessel Name On Bulwark / Ship Side In Both Hindi And English With Fluorescent Paint -02 150 066 Furniture ( A ) Crca Kit Lockers Perished , To Be Renewed ( 90X80x45 Cm ) 151 066 Furniture ( B ) Crca Standing Lockers Perished, To Be Renewed ( 183X40x45 Cm ) 152 066 Furniture ( C ) Chairs In Crew Accomadation Persihed / Damaged , To Be Renewed 153 066 Furniture ( D ) Wooden Table Damaged / Pershed To Be Renewed 154 066 Furniture ( E ) Wood Paneling In Crew Rest Room And Wheel House Damged / Perished, To Be Renewed 155 Engineering Defect List N Nsullage Pump Engine, Make:-M / S Greaves, Model:-3Twa, Type:- ( Air Cooled, 4-Stroke, Vertical Inline, Diesel Fuelled ) , Sl No:- ( Port 1108031010027, Stbd-1108031010026 ) Rating:-25Hp, Rpm:-1500 156 1001 Nsullage Pump Engine ( A ) Renewal Of Flexible Hoses ( En 853 2Sn Wire Braid, Dia 15 Mm, With St 1 / 4 Inch, Unf Male X Banjo 157 1001 Nsullage Pump Engine ( B ) Air Intake Filter To Be Renewed ( Part No. 271-3700-14 ) 158 1001 Nsullage Pump Engine ( C ) Renewal Of Engine Oil, Oil Will Be Supplied By Navy 159 1001 Nsullage Pump Engine ( D ) Renewal Of Corrosion Plug As Per Sample ( Dia - 10 Mm, Length- 40 Mm ) 160 1001 Nsullage Pump Engine ( E ) Renew Fuel Oil Filters Elements . ( Part No. 9451 037 401& 9451 037 420 ) 161 1001 Nsullage Pump Engine ( F ) Renewal Of Oil Filter ( Part No.500-2175-19 ) 162 1001 N Sullage Pump Engine ( G ) Engine To Be Started For Trial For 30 Minutes. 163 Sullage Pump Make:-M / S Tushaco Pump, Type:-Progressive, Cavity Screw, Model:-T1s 1450.1, Sl No:- ( Port 105182 / 5212, Stbd 105182 / 5211 ) , Capacity:-60Tph, Total Head-15Mwc, Speed-300Rpm 164 1002 N Sullage Pump ( A ) Overhauling Of Pumps To Be Done. Includes Removal, Renewal Weardown Parts And Fit Back. 165 1002 Nsullage Pump ( B ) Performance Trial For 30 Minutes Post Overhauling. 166 Stripping Pump Engine, Make:-M / S Greaves, Type:-Air Cooled, 4-Stroke, Electric Start Diesel Engine, Speed:-3000Rpm, Rating:-7.4Bhp, Sl No:- ( Port-A0l0403225, Stbd-A0l0403224 ) 167 1003 Nstripping Pump Engine ( A ) Lub Oil Sump To Be Drained, Cleaned. ( Sump Capacity 5 Liters ) 168 1003 N Stripping Pump Engine ( B ) Renew Air Filter Element 169 1003 N Stripping Pump Engine ( C ) Renew Fuel Oil Filters Element . 170 1003 N Stripping Pump Engine ( D ) Engine To Be Started For Trial For 30 Minutes. 171 Stripping Pump Make:-M / S B E Pump, Model:-Sh80-140N1-Dgs2-316, Type:-Horizontal, Self-Priming, Centrifugal, Capacity:-60Tph, Total Head:-15Mwc, Sl No:-Port-358898, Stbd-358899. 172 1004 Nstripping Pump ( A ) Overhauling Of Pumps Includes Removal, Renewal Weardown Parts ( Shaft, Mechanical Seals, Impeller, Gaskets ) And Fitted Back. 173 1004 Nstripping Pump ( B ) Performance Trial For 30 Minutes Post Overhauling. 174 Genset Make:-Kirloskar, Type:-Ha394, Sl No:-03.2017 / 1021253, Rating:-23.55Kw, 32Hp 175 1005 N Diesel Generator ( A ) Renewal Of Flexible Hoses ( En 853 2Sn Wire Braid, Dia 15 Mm, With St 1 / 4 Inch, Unf Male X Banjo ) 176 1005 N Diesel Generator ( B ) Air Intake Filter To Be Renewed. 177 1005 N Diesel Generator ( C ) Renewal Of Engine Oil Qty-10Ltr, Oil Will Be Supplied By Navy 178 1005 N Diesel Generator ( E ) Renewal Of Fuel Filters ( Pre Filter &Micro Filter Element ) ( Part No. 34.032.02.0 & 34.032.03.0 ) 179 1005 N Diesel Generator ( F ) Renewal Of Oil Filter ( Part No. 03.040.19.0 ) 180 1005 Ndiesel Generator ( G ) Engine To Be Started For Trial For 30 Minutes. 181 Valve To Be Overhauled Make-Vijoli, Type-Screw Down, Overhauling Includes Renewal Of Wear Down Parts ( Spindle, Disc ) , Mat- Gm 182 1006 N Valves ( A ) Dia 150 Mm 183 1006 N Valves ( B ) Dia 50 Mm 184 1006 N Valves ( C ) Dia 15 Mm 185 1006 N Valves ( D ) Dia 80 Mm 186 Rubber Expansion Bellow ( With Flange ) To Be Renewed. Working Pr- 5 Bar, Fluid- Sullage Oil 187 1007 Nbellows ( A ) Dia 150 Mm 188 1007 Nbellows ( B ) Dia 80 Mm 189 Three Way Plug Cock To Be Overhauled, Mat - Ss 190 1008 Ncocks ( A ) Dia 150 Mm 191 1008 Ncocks ( B ) Dia 80 Mm 192 Semi Rotary Hand Pump To Be Overhauled Make-Venus, Model-N97 193 1009 N Hand Pumps ( A ) Pump To Be Overhauled Includes Renewal Of Wear Down Parts. 194 1009 Nhand Pumps ( B ) Wooden Handled To Be Renewed. 195 1010 Noverhauling Of System V / V Nvalves ( A ) Sdnr Globe V / V . Dia - 150 Mm 196 1010 Noverhauling Of System V / V Nvalves ( B ) Sdnr Globe Suction V / V Of Sullage Tank. Dia- 80 Mm 197 1011 Nrelief Valve 80Mm Dia Relief Valve To Be Removed, Overhauled, Calibrate ( Pr-04Bar ) And Fitted Back. 198 Glycerine Filled Bourden Pr Gauges To Be Renewed, Make-An Instruments 199 1012 Npr. Gauges ( A ) Range:- -01 To 01 Kg ( Suction Pr Gauge ) 200 1012 N Pr. Gauges ( B ) Range:- 0 To 04 Kg ( Discharge Gauge ) 201 Co2 Fire Fighting Sytem Maker:-Shm Ship Care ( All Procedures To Be Carried As Mentioned Below And Replace Defective Parts If Required ) 202 1013 Nco2 Fire Fighting System ( A ) Co2 Cylinders To Be Removed, Chemically Cleaned, Pressure Tested And Recharged With 45Kg Co2 203 1013 Nco2 Fire Fighting System ( B ) Non Return Valves On Cylinder Heads To Be Overhauled. 204 1013 Nco2 Fire Fighting System ( C ) Co2 Discharge Nozzles To Be Opened, Checked For Chockages, Cleaned And Fitted Back 205 1013 Nco2 Fire Fighting System ( D ) Overhaul Of Relief Valve Assembly 206 1013 Nco2 Fire Fighting System ( E ) Overhaul Of Pressure Operated Switch 207 1013 Nco2 Fire Fighting System ( F ) Complete Co2 System Piping To Be Blown Through Using Hp Air To Prove System Free Of Blockages 208 1013 Nco2 Fire Fighting System ( G ) Co2 Cylinders ( 45 Kg Capacty ) And System Pipes To Be Painted As Per Coding Post Work Completion. 209 1013 Nco2 Fire Fighting System ( H ) All System Pipes ( Dia-20 Mm ) To Be Painted As Per Coding Post Work Completion. 210 1013 Nco2 Fire Fighting System ( J ) Renewal Of Flexible Hoses As Per Sample ( Pr 275Bar ) 211 1013 Nco2 Fire Fighting System ( K ) Actuator To Be Overhauled Operated By N2 212 1013 Nco2 Fire Fighting System ( L ) Solenoid To Be Checked For Operation And Renewed If Declared Ber. 213 1013 Nco2 Fire Fighting System ( M ) Both Nitrogen Cylinders To Be Removed, Chemically Cleaned, Pressure Tested And Recharged With 10 Ltr N2 Each 214 1013 Nco2 Fire Fighting System ( N ) Pr Gauges To Be Renewed, Make-Wikarange-400 Kg / Cm2 215 1013 Nco2 Fire Fighting System ( P ) Pr Gauges To Be Renewed, Make-Wikarange-200 Kg / Cm2 216 1013 Nco2 Fire Fighting System ( Q ) Undertake Testing Of The Co2 System As Follows: 217 1013 Nco2 Fire Fighting System ( I ) Lamp Checks Of Various Indication In The Control Panel. Replace If Defective 218 1013 Nco2 Fire Fighting System ( Ii ) Open Pilot Control Box To Check Indication On The Panel 219 1013 Nco2 Fire Fighting System ( Iii ) Check Klaxon Horn And Strobe Comes On. 220 1013 Nco2 Fire Fighting System ( Iv ) Check Hooter And Fire Detector Replace If Defective. 221 1013 N Co2 Fire Fighting System ( Q ) Pull Pressure Switch Knob Of Pr Swicth For Premature Discharge To Check Indication On The Panel. Pull The Pr Switch Knob For Co2 Discharge Indication. Check Indication Panel. The Premature Discharge Indication Shall Go Off. Reset Both The Knob After This Operation. The Indications Shoukd Go Off. Nnote: The Entire Co2 System To Be Proved For Functional Checks Without Co2 222 1014 N Misc Renewal Of Flexible Hoses On Discharge Side Of Hand Pump. Dia-65 Mm , Length 05 Mtr Each 223 1015, Nmisc Sounding Caps Of Tanks Damaged To Be Opened, Manufactured As Per Sample 224 1016 N Misc Cleaning / Renewal Of Sight Glass Of Ru Tank. Overhaul Spring Loaded Check Valve Of Both Tanks. Joints To Be Renewed And Fitted Back. 225 1017 Nmisc Quick Shut Off Valves Of The Fuel Tanks To Be Overhauled. Arrangement Of The System Involved To Be Overhauled For Operating From Remote Position. ( Deck ) 226 1018 Nmisc Hydrant V / V And Fire Hydrants To Be Overhauled And Made Operational Dia- 50 Mm 227 Electrical Defect List Neqpt / System: 3Ph 3Wire Sine Wave Invertor;Ac Input 415V, 3Ph;Dc Input 360V;Ac Out Put -415V, 3Ph, Sine Wave 228 2001 Ninverter Carry Out Overhauling / Checking / Fault Rectification Of Invertor And Made It Operational.Presently Mother Board Is Not Working. 229 2002 Nbatteries Renew The Sealed Maintance Free Lead Acid Batteries2000ah, 12V. Make: Exide 230 2003, Neqpt / System:Msb Nmsb ( A ) Msb To Be Overhauled ( Includes Defective Switches To Be Renwed, Perished Control Wiring To Be Renewed With Crimping Of Proper Lugs, Marking Sleeves To Be Put On Control Wiring And Loose Wirng To Be Tied With Cable Ties ) ( Presently There Is No Deffective Parts, All Components Are Working. ) . Carryout Routines Mentioned Below And Prove Them For Satisfactory Performance. ( Calibration Certificates / Test Reports From Nabl Recognised Labs Are To Be Submitted. ) N N N N 231 2003 , Neqpt / System:Msb N Msb N ( B ) De-Energise Switchboard. Remove All Busbars, Insulators, Cts, Pts, Junction Boxes, Switch Contact Surfaces, Fuse Bases / Carriers And Other Components. Clean And Decarbonise The Busbar Using Soft Brush / Calico Cloth Dipped In Alcohol. Thoroughly Clean And Ascertain The Soundness Of These Components. Repair / Replaced Them As Required. 232 2003 Neqpt / System:Msb N Msb ( C ) Inspect Cables And Bus Bar . Replace All Defective Cables, Wirings, Lugs And Termination. Tighten Electrical Connections And Fasteners ( Cable -100 Mtr, 1 Sqm For 02 Sections ) 233 2003, Neqpt / System:Msb Nmsb ( D ) Apply Loctite ( Or Equivalent Compound ) To All Loose Screw / Nuts Of Breaker Asemblies. 234 2003 Neqpt / System:Msb N Msb ( E ) Examine Actuating Mechanism And Condition Of Contacts. Carry Out Repairs / Cleaning / Lubrication Of All Mechanical Parts And Contacts And Check For Satisfactory Operations 235 2003 Neqpt / System:Msb N Msb ( F ) Rubber Mat : Insulating Rubber Mat Deteriorated. To Be Renewed With Oil Resistance & Very High Voltage Resistance Electrical Rubber Mat In Front Of Msb. ( Thickness- 3Mm ) Make Vardhaman Model Class C 236 2004 Nbattery Charging System Provide Battery Chargering System 12V, Dc From Shore Supply System For Dg Starting Battery-1No At 1 Deck, & Sullage Pump Engines Starting Batteries 12V, 180Ah-4 Nos At Pump Room 237 2005 Nnav Lights Renew The Port Navigational Light Fitting Two Stair Type ( 230V, Ac & 24V Dc ) 238 2006 Ndynamos Over Hauling 12V, Dc Dynamos Make:Tvs 239 2007 Nstarters Over Hauling Of Self Starters 12V, 3Hp Dc Make:Tvs 240 2008 Ndg Starting System Carry Out Overhauling / Checking / Fault Rectification Of Engine Control & Starting Wiring System And Made It Operational.Renew The Any Deffective Parts ( Presently All Working ) 241 2009 Nmisc Renew The3core 25 Sq.Mm Multy Stand Copper Marine Shore Supply Cable. 242 2010 Neqpt / System: Shore Supply Pannel N Shore Supply Panel Carry Out Overhaul Of Shore Supply Pannel.Required To Renew The Window Glass ( 8X8 ) 243 2011 Neqpt / System: Motors N Motors Carry Out Overhaul Of 2 In Nos Blower Motors 415V.3Ph, 3Hp-1No, 230V, 1Ph, .25Hp-1No 244 2012 Neqpt / System: Ship Name Board Nmisc ( A ) Renew The Acrylic 4Mm Sheet For Name Board Size:4X2.5 245 2012 Neqpt / System: Ship Name Board Nmisc ( B ) Renew The Led Tube Lights 20W, 2, 230V Ac 246 2013 Neqpt / System: Wall Mounted Fans Nmisc Renew The Wall Mounted Fans 300Mm Sweep, 230V Make:Bajaj / Philps 247 2014 Neqpt / System:Flood Lights Nmisc Renew The Led Flood Lamp 230V, 200W 248 Dry Dock And Allied Services Work Packages N N ( A ) Docking And Undocking Charges ( Both Versions ) / Nnote:-Docking And Undocking Will Be Done By Navy In Navy Permises I.E Nd ( V ) / Slipway 249 ( B ) Dock Blocks Preparation & Laying Out As Per Docking Plan / Nnote :- Job Will Done By Navy 250 Dock Hire Charges For An Estimated Duration Of 60 Days As Per Ocr / Ndry Dock Facility Will Privided By Navy In Navy Permises 251 Wet Basin / Alongside Hire Charges For The Remaining Duration ( I.E. Total Refit Duration Of – 60 Days Docking Period ) 252 Provision Of Sufficient Lighting For Duty Staff 253 Quote For Maintenance Of Two In No. Fire Lines For The Refit Duration . 254 Provision Of Two Transports ( Cars ) For Entire Refit Duration ( One For Refit Co-Ordinating Staff And One For Nd ( V ) Monitoring Team ) For 12 Hrs Or 100Km / Day Whichever Is Less 255 Provision Of Stationory / Office Items For Nd ( V ) / Refit Monitoring Team For Entire Refit Duration Period. Cater Budget Of Rs 2000 / - Per Month. Requirement Will Be Intimated Rmt / Ndv On As Requirement Basis. Payment At Actuals. Nnote:- Firms To Quote. 256 Nmail Man Services ( 02 Nos ) For Entire Refit Duration ( One For User Department And One For Planning / Co-Ordinating Department ) To Be Provided For 10 Hrs Per Day 257 N Nqc Inspection For The Entire Scope Of Work By Third Party Irs / Lrs / Abs / Qc / Tpi For The Refit Duration As Per The Qis.

Key Value

Document Fees
Refer document
EMD
INR 786100.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: <NORMAL REFIT OF IN SHIP>
Sl. No. Item Description Item Code / Make Quantity Units
1 1.0001 WORK PAKAGE FOR NR SB-I\nHULL DEFECT LIST\n001\nDocking\nVessel to be docked in both versions.\nNote 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) Slipway/Drydock).\nNote 2:- Last docked in Version I on 22 Aug 2017\n Item no 1 1 Firm not to quote
2 1.0002 002 Cleaning of Under Water Hull and Boot Top Area HP jet cleaning of entire under water area and boot top area (with a pressure not exceeding 3000 PSI) remove the marine growth/barnacles and prepare for survey. Note:- (i) U/W area: 425 Sqm including boot top Item no 2 425 Sqm
3 1.0003 003 Cleaning of Internal Compartments - Sullage tanks(06 Nos) Manually clean fuel tanks free of accumulated fuel and residual muck and present for survey. Item no 3 750 Sqm
4 1.0004 004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (a) Cable locker Item no 4 20 Sqm
5 1.0005 004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (b) Forepeak tank Item no 5 60 Sqm
6 1.0006 004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (c) Cofferdam 1 Item no 6 105 Sqm
7 1.0007 004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (d) Cofferdam 2 Item no 7 70 Sqm
8 1.0008 004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (e) Cofferdam 3 Item no 8 70 Sqm
9 1.0009 004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (f) Cofferdam 4 Item no 9 70 Sqm
10 1.001 004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- (g) PUMP Room (Bilges: 120 Sqm, Bulkheads:140 Sqm) Item no 10 260 Sqm
11 1.0011 004 Cleaning of Internal Compartments - ASP Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- (h) Steering gear room (Bilges: 24 Sqm, Bulkheads:76 Sqm) Item no 11 100 Sqm
12 1.0012 05 Cleaning of Void spaces (06 Nos) Manually clean 06 Nos void spaces of all residues and present for survey. Note: Cleaning to be done with detergent water, oil absorbing/removing solution or powder, rags, cotton jute etc. Quote to include cost of cleaning material also. Item no 12 450 Sqm
13 1.0013 006 Hull Survey - Visual survey External and Internal Structures Carry out visual and hammer survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.) All manholes to be inspected for water tightness, chalk impression test to be carried out. Note:- (i) LS for survey (ii)Firm to submit 07 copies of hull survey report . Item no 13 3000 Sqm
14 1.0014 007 Hull Survey - UTG Survey External and Internal Structures Carry out UTG survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.) All manholes to be inspected for water tightness, chalk impression test to be carried out. Note:- (i) LS for survey (ii) Firm to submit 07 copies of hull survey report . (iii) Quote for UTG survey points Item no 14 5000 Nos
15 1.0015 008 Steel renewal\nQuote for steel renewal at various locations as per survey report\nNote :- Quoted repair cost shall include cost of both sides blasted and primed IS 2062 Grade `B’ quality steel. Degutting/ regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc. Item no 15 10 Ton
16 1.0016 009 Build ups\n(a) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 25 x 25 mm Item no 16 300 Nos
17 1.0017 009 Build ups\n(b) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 50 x 50 mm Item no 17 150 Nos
18 1.0018 010 Fairing of deformed structure\n Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor Item no 18 30 Sqm
19 1.0019 011 Re-welding\nCarry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT. Item no 19 30 RMT
20 1.002 012 Draft marks\nDraught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric. Item no 20 20 Nos
21 1.0021 013 Sacrificial anodes\n(a) Renew Sacrificial anodes those consumed more than 50% Type: MK-I Note:- Anodes will be supplied by Navy/COY. Item no 21 14 Nos
22 1.0022 013 Sacrificial anodes\n(b) Renew Sacrificial anodes those consumed more than 50% Type: MK-VI Note:- Anodes will be supplied by Navy/COY. Item no 22 6 Nos
23 1.0023 014 Surface Preparation Under Water area \nSurface preparation to SA 2.5 std using grit blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application. (areas include 'C' channel for rubber fenders) Item no 23 325 Sqm
24 1.0024 015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard primer -50 microns Item no 24 325 Sqm
25 1.0025 015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns Item no 25 325 Sqm
26 1.0026 015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns Item no 26 325 Sqm
27 1.0027 015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns Item no 27 325 Sqm
28 1.0028 015 Painting Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns Item no 28 325 Sqm
29 1.0029 015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns Item no 29 325 Sqm
30 1.003 015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns Item no 30 325 Sqm
31 1.0031 016 Surface Preparation Boot Top area \nSurface preaparation to SA 2.5 standards using grit blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application. (areas include 'C' channel for rubber fenders) Item no 31 100 Sqm
32 1.0032 017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT Item no 32 100 Sqm
33 1.0033 017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns DFT Item no 33 100 Sqm
34 1.0034 017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns DFT Item no 34 100 Sqm
35 1.0035 017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns DFT Item no 35 100 Sqm
36 1.0036 017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns DFT Item no 36 100 Sqm
37 1.0037 017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns DFT Item no 37 100 Sqm
38 1.0038 017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra (Black) - 150 microns DFT Item no 38 100 Sqm
39 1.0039 018 Surface prepartion Above Water Area and Bulwark including guardrails Carry out mechanical cleaning to ST3 standard for paint application as per survey report by Paint OEM rep Item no 39 110 Sqm
40 1.004 019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: Penguard primer - 50 microns DFT Item no 40 110 Sqm
41 1.0041 019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT Item no 41 110 Sqm
42 1.0042 019 Painting- Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT Item no 42 110 Sqm
43 1.0043 019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP Grey - 60 microns DFT Item no 43 110 Sqm
44 1.0044 020 Surface prepartion Super Structure and Deck Fittings Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application. Item no 44 110 Sqm
45 1.0045 021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT Item no 45 110 Sqm
46 1.0046 021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80( Red ) - 125 microns DFT Item no 46 110 Sqm
47 1.0047 021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c)3rd Coat: Jotamastic 80(Grey) - 125 microns DFT Item no 47 110 Sqm
48 1.0048 021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP GREY 7040- 60 microns DFT Item no 48 110 Sqm
49 1.0049 022 Surface prepartion Weather Decks Carry out hydro-jet blasting of entire weather deck, bridge deck and flag deck to SA 2.5 standards. Item no 49 225 Sqm
50 1.005 023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT Item no 50 225 Sqm
51 1.0051 023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 - 150 microns DFT Item no 51 225 Sqm
52 1.0052 023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota armour -800 microns DFT Item no 52 225 Sqm
53 1.0053 024 Surface prepartion Internal Compartments - Fore Peak Tank, Cable locker and Cofferdam Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for fore peak tank , cable locker and cofferdam (04). Item no 53 395 Sqm
54 1.0054 025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a)1st Coat: primer - Penguard primer -50 microns DFT Item no 54 395 Sqm
55 1.0055 025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Balloxy HB light (Bieze) - 150 microns Item no 55 395 Sqm
56 1.0056 025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Balloxy HB light (Grey) - 150 microns Item no 56 395 Sqm
57 1.0057 026 Surface prepartion Internal Compartments - Pump Room and ASP Compartment including bilges Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. (i) Pump room ( Bilges-120 sqm, bulkheads-140) (ii) ASP ( Bilges-24 sqm, bulkheads-76) Item no 57 360 Sqm
58 1.0058 027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT Item no 58 144 Sqm
59 1.0059 027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns Item no 59 144 Sqm
60 1.006 027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns Item no 60 144 Sqm
61 1.0061 027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns. Item no 61 144 Sqm
62 1.0062 028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT Item no 62 216 Sqm
63 1.0063 028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Interior fire retardent paint-100 microns Item no 63 216 Sqm
64 1.0064 028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Interior fire retardent paint-100 micron Item no 64 216 Sqm
65 1.0065 029 Cleaing of RU Tanks Cleaning of Fuel Oil RU TanksManually scrap and clean to bare metal and apply two coats of OM 750 oil in following tanks: Fuel Oil RU Tanks (02nos) Note:- Quoted cost shall be inclusive of cost of oil also. Item no 65 40 Sqm
66 1.0066 030 Surafce prepartion Bulkheads, decks and dadoes of Internal compartments Carry out mechanical cleaning of all stores ( naval stores,battery stores, CO2 room, paint stores,pump store,deck store and eletrical control room) to ST 3 standard as survey report of Paint OEM for paint application. Item no 66 280 Sqm
67 1.0067 031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 microns Item no 67 30 Sqm
68 1.0068 031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (b) 2nd coat : Jotamastic 80 grey -1 x 150 microns Item no 68 30 Sqm
69 1.0069 031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (c) 3rd coat ; Burnswick green finishing paint-100 microns Item no 69 30 Sqm
70 1.007 032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 microns Item no 70 250 Sqm
71 1.0071 032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b)1st Coat: Interior fire retardent paint-100 microns Item no 71 250 Sqm
72 1.0072 032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 2nd Coat: Interior fire retardent paint-100 microns Item no 72 250 Sqm
73 1.0073 033 Surface preaprtion Void spaces Carry out surface preaprtion to ST 3 standards of VOID Spaces as survey report of Paint OEM for paint application. Item no 73 450 Sqm
74 1.0074 034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (a) 1st coat- penguard primer- 50 microns Item no 74 450 Sqm
75 1.0075 034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (b) 2nd coat coat-Jotacoat universal (Al)- 150 MICRONS Item no 75 450 Sqm
76 1.0076 034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (c) 2nd coat coat-Jotacoat universal (GREY)- 150 MICRONS Item no 76 450 Sqm
77 1.0077 034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (d) 3rd coat t-Penguard top coat- 50 MICRONS Item no 77 450 Sqm
78 1.0078 035 Surface preaprtion Sullage Tanks Carry out surface preaprtion to ST 3 standards of all sullage tanks/fuel tanks as survey report of Paint OEM for paint application. Item no 78 750 Sqm
79 1.0079 036 Painting Sullage Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (a) Tankguard HB light grey - 150 microns Item no 79 750 Sqm
80 1.008 036 Painting Sullage Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (b) Tankguard HB greyish green - 150 microns Item no 80 750 Sqm
81 1.0081 037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \nNote : -The job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. (a) Anchors - 03 Item no 81 3 Nos
82 1.0082 037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (b) Chain cable(Dia 17.5mm) (i) Full Shackles- 08 (ii) Half Shackles- 04 Item no 82 275 Rmt
83 1.0083 037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \n(c) Swivel piece Item no 83 6 Nos
84 1.0084 037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \n(d)  Lug less joining shackles Item no 84 12 Nos
85 1.0085 037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. \n(e) D - Shackles Item no 85 4 Nos
86 1.0086 037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (f) Chain Stopper/compressor Item no 86 2 Nos
87 1.0087 038 Anchor windlass Completely strip & overhaul anchor windlass, renew brake linings, refit and prove for satisfactory operation. Quoted price to include cost of liners and spares also. Item no 87 1 Nos
88 1.0088 039 Bollards (a) Twin bollard and foundation corroded and thinned. To be repaired/ renewed as per hull survey report. Doubler plate Area-420MMx420MM, Dia of pipe-219.1MM, Height-1460MM,Foundation Area-400MMx400MMx90MM, Thickness of plate-10MM Towing gear Securing Rod Dia-50MM. Item no 88 8 Nos
89 1.0089 039 Bollards (b) Towing bollard and foundatiosn corroded and thinned. To be repaired/ renewed as per hull survey report. Doubler plate Area-420MMx420MM, Dia of pipe-219.1MM, Height-1460MM,Foundation Area-400MMx400MMx90MM, Thickness of plate-10MM Towing gear Securing Rod Dia-50MM. Item no 89 2 Nos
90 1.009 040 Guardrails (a)Fixed verticals guardrail stanchions on weather deck deformed/bent from deck. To be repaired/renewed. (Mat-MS angle bar) Item no 90 60 Nos
91 1.0091 040\nGuardrails\n(b) Fixed Horizontal guardrails on weather deck deformed/bent To be repaired/renewed.\n(Mat-MS) Item no 91 50 RMtrs
92 1.0092 041 Metallilc chain guardrails Metallic chain guardrails of stanchions corroded to chipped and cleaned. \nRenewal cost should include cost of material also. Item no 92 60 RMtrs
93 1.0093 042 Sanitry sysytem Soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. Mat: MS , Dia: 04inch. (Pressure: 3Kg/Cm2) Item no 93 15 RMtrs
94 1.0094 043 Ventilation (a) Mushroom type natural exhaust ventilator to be removed, cleaned/ overhauled and fitted back. Renew if required. Details- Mush room head dia-500 mm, Height-1550 mm Item no 94 1 Nos
95 1.0095 043 Ventilation (b) Mushroom type forced supply ventilator to be removed, cleaned/ overhauled and fitted back. Renew if required. Details- Mush room head dia-370 mm, Height-1550 mm, Item no 95 2 Nos
96 1.0096 044 Drainage system Drain pipe leading from mast deck to 01 deck and No. 1 deck to engine room corroded, thinned and holed, to be renewed. Mat: GI, 03 inch dia. Item no 96 10 RMtrs
97 1.0097 045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (a) SS Wash basin to be renewed. Note:- Quoted repair cost shall include cost all items/spares. (a) Wash basin Item no 97 2 Nos
98 1.0098 045 Sanitry system Sanitry fittingss in crew bathrooms and WC. Sanitry fittings in crew bathrooms and wc to be renewed. (b) Provision SS tap: 1/2 inch Item no 98 4 Nos
99 1.0099 045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (c) SS SUPPLY pipeline broken/damaged to be renewed/repaired. Mat : Cu-Ni, dia: ½ inch Item no 99 30 Nos
100 1.01 045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (d) Drain pipeline broken/damaged to be renewed/repaired. Mat-MS, dia- 2 inch Item no 100 20 RMtrs
101 1.0101 045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (e) Flush valves to be renewed. Mat - Brass, Dia - 2" Item no 101 2 Nos
102 1.0102 046 Fresh water system Crew bathrooms and WC. .Note:- Quoted repair cost shall include cost all items/spares. (a) SS stop cock 1’’ to be renewed Item no 102 4 Nos
103 1.0103 046 Fresh water system Crew bathrooms and WC. (b) Shower head to be fitted in bathrooms Note:- Quoted repair cost shall include cost all items/spares. Item no 103 4 Nos
104 1.0104 047 Tyre fenders Tyre fender damaged on P&S side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) OD 750mm; ID 450 mm , width - 250 mm Item no 104 24 Nos
105 1.0105 047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side. (b) Chain Securing brackets/deck eyes. Item no 105 72 Nos
106 1.0106 047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (c) provission of Securing chain. 16 MM DIA for tyre fenders Item no 106 72 RMtrs
107 1.0107 047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (d) Bush for passing chain on tyres. Item no 107 72 Nos
108 1.0108 047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (e)Provision of D SHACKLES for tyre fenders Item no 108 72 Nos
109 1.0109 048 D shape Fenders (a) 'D' shaped rubber fenders damaged/perished to be renewed. Color - GREY/WHITE Length - 1000 mm length Location - 44 on shipside and 05 on transom Material - EPDM rubber as per NES170 Item no 109 49 Nos
110 1.011 048 D shape Fenders Securing brackets (b) Fender securing flat bar brackets to be repaired/renewed as necessasry.(Mat- MS). \nSize : 1100MM x 110MM x 08MM Item no 110 49 Nos
111 1.0111 048 D shape Fenders Securing brackets (c) Fender securing 'C' clamp brackets to be repaired/renewed as necessasry.(Mat- MS). Size : 200MM x 110MM x 08MM Item no 111 98 Nos
112 1.0112 049 Pneumatic Fender. (a) Provision of Pneumatic Fender on (P & S) side at FWD and AFT Specification of fenders:- Size - 660x1160 mm , Mat-Neoprene Blended Rubber having 65 % min Neoprene Content , Colour-White, Tensile strength- 180 Kgf/CM2, Elongation at break- 400 % min, Hardness- 700 max, Tear Strength- Min 40 Kgf/CM2, Compression set- 30 % Max, Abrasion resistance- 0.5 CC Max.\n Item no 112 4 Nos
113 1.0113 050 Pneumatic Fender Securing Arrangement (a) Fabrication of MS eye with 08 MM Thickness on shipside. Item no 113 16 Nos
114 1.0114 050 Pneumatic Fender Securing Arrangement (b) Provision of D Shackles, Dia 16 MM Item no 114 64 Nos
115 1.0115 050 Pneumatic Fender Securing Arrangement (c) Provision of Securing Chain 16 MM Dia length RMT 4 Mtr Each Item no 115 20 RMtrs
116 1.0116 051 Sky light SS butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. To be renewed. Dia of bolt : 10 mm & 6 inch length (Mat-MS). Item no 116 10 Nos
117 1.0117 052 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (a) WT door Item no 117 12 Nos
118 1.0118 052 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (b) WT Hatch Item no 118 6 Nos
119 1.0119 053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Forepeak Tanks Item no 119 2 Nos
120 1.012 053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (b) Fuel/ sullage Tank Item no 120 6 Nos
121 1.0121 053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (c) Void space Item no 121 6 Nos
122 1.0122 053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (d) cable locker Item no 122 1 Nos
123 1.0123 053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. \nNote:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (e) cofferdams Item no 123 4 Nos
124 1.0124 054 Bilge paltform (a) Renew bilge platform plate. Material- aluminium chequerd plate, thickness- 05 mm Item no 124 20 Sqm
125 1.0125 054 Bilge platform (b) Supporting brackets to be renewed where ever required(Mat - Ms). Securing nut&bolts to be of Mat-SS. Item no 125 20 RMtrs
126 1.0126 055 Cleats MS cleats perished/thinned to be renewed (Size-28 mm). Quote shall includes nuts bolts and associated accessories Item no 126 6 Nos
127 1.0127 056 Ventilation System (a) Breather pipes of various tanks on upper deck corroded and thinned including wire mesh, to be repaired/renewed. (Mat. GI pipe) Pipe dia 2 1/2 inch Item no 127 10 Nos
128 1.0128 056 Ventilation System (b) Deck distance piece and flanges corroded to be renewed including rubber joints. Dia 150mm Item no 128 5 Nos
129 1.0129 056 Ventilation System (c) Ventilation trunking wire mesh to be renewed at damaged areas. Size: 400mmX600mm Item no 129 24 Nos
130 1.013 057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways. (a) Surface preparation and application of EROP. And Mass 98. Item no 130 30 Sqm
131 1.0131 057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96. Item no 131 30 Sqm
132 1.0132 057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (c) Surface preparation and application of sealer coat on entire area Item no 132 30 Sqm
133 1.0133 058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (a) Surface preparation and application of EROP. And Mass 98. Item no 133 4 Sqm
134 1.0134 058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96. Item no 134 4 Sqm
135 1.0135 058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (c) Surface preparation and application of sealer coat on entire area Item no 135 4 Sqm
136 1.0136 059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (a) Surface preparation and application of EROP. And Mass 98. Item no 136 1 Sqm
137 1.0137 059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96. Item no 137 1 Sqm
138 1.0138 059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (c) Surface preparation and application of sealer coat on entire area Item no 138 1 Sqm
139 1.0139 060 WT Hatches WT hatch clips to be removed, cleaned, greased and refitted WT Hatch (0.6M x 0.6M) Item no 139 6 Nos
140 1.014 061 WT Doors WT door clips to be removed, cleaned, greased and refitted WT Doors Item no 140 14 Nos
141 1.0141 062 NWT NWT Wooden door of wheel house perished, to be repaired/renewed including cylindrical door lock. Item no 141 2 Nos
142 1.0142 063 Manhole Rubber Joints perished, to be renewed (a) Joints Item no 142 10 Nos
143 1.0143 063 Manhole (b) Studs of manholes perished, to be renewed (Only defective studs to be renewed as per survey report )MS Studs with nut, size 20 mm Item no 143 100 Nos
144 1.0144 063 Manhole (c) Manhole covers corroded/ thinned. To be renewed. Mat - IS 2062 Grade 'B' steel. Size - 2' X 1.5' Item no 144 10 Nos
145 1.0145 064 Locking arrangment (a) Mortise locks in accomodation areas defective to be renewed. Item no 145 6 Nos
146 1.0146 064 Locking arrangment (b) MS Hasp staple/ locking arrangemet on MS Door and hatches corroded/ broken/ damaged to be renewed as per sample fitted. Item no 146 16 Nos
147 1.0147 065 Name Board Following name board perished/damaged, to be renewed/repaired. (a) repair/renewal of vessel name board including electroplating to be carried out on ship side -02 Item no 147 2 Nos
148 1.0148 065 Name Board Following name board perished/damaged, to be renewed/repaired. (b) Vessel illuminated board with Perspex sheet - 01 Item no 148 1 Nos
149 1.0149 065 Name Board Following name board perished/damaged, to be renewed/repaired. (c) Painting of vessel name on bulwark/Ship side in both Hindi and English with fluorescent paint -02 Item no 149 2 Nos
150 1.015 066 Furniture (a) CRCA kit lockers perished , to be renewed (90x80x45 cm ) Item no 150 6 Nos
151 1.0151 066 Furniture (b) CRCA standing lockers perished, to be renewed (183x40x45 cm) Item no 151 3 Nos
152 1.0152 066 Furniture (c) Chairs in crew accomadation persihed/damaged , to be renewed Item no 152 6 Nos
153 1.0153 066 Furniture (d) Wooden table damaged/pershed to be renewed Item no 153 1 Nos
154 1.0154 066 Furniture (e) Wood paneling in crew rest room and wheel house damged/perished, to be renewed Item no 154 20 Sqm
155 1.0155 ENGINEERING DEFECT LIST \n\nSullage Pump Engine,MAKE:-M/S GREAVES,MODEL:-3TWA,TYPE:-(AIR COOLED,4-STROKE,VERTICAL INLINE,DIESEL FUELLED),SL NO:-(PORT 1108031010027,STBD-1108031010026)RATING:-25HP,RPM:-1500 Item no 155 2 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
156 1.0156 1001\nSullage Pump Engine (a) Renewal of flexible hoses ( EN 853 2SN wire braid, dia 15 mm, with ST 1/4 inch, UNF MALE X Banjo Item no 156 10 Nos
157 1.0157 1001\nSullage Pump Engine (b) Air intake filter to be renewed ( Part No. 271-3700-14) Item no 157 2 Nos
158 1.0158 1001\nSullage Pump Engine (c) Renewal of engine oil,Oil will be supplied by NAVY Item no 158 10 Ltrs
159 1.0159 1001\nSullage Pump Engine (d) Renewal of corrosion plug as per sample (dia - 10 mm, length- 40 mm) Item no 159 4 Nos
160 1.016 1001\nSullage Pump Engine (e) Renew Fuel oil filters elements .(part no. 9451 037 401& 9451 037 420) Item no 160 4 Nos
161 1.0161 1001\nSullage Pump Engine (f) Renewal of oil filter ( Part No.500-2175-19) Item no 161 4 Nos
162 1.0162 1001\n Sullage Pump Engine (g) Engine to be started for trial for 30 minutes. Item no 162 2 Nos
163 1.0163 Sullage Pump MAKE:-M/S TUSHACO PUMP,TYPE:-Progressive,Cavity Screw,MODEL:-T1S 1450.1,SL NO:-(PORT 105182/5212,STBD 105182/5211),Capacity:-60TPH,Total Head-15MWC,Speed-300rpm Item no 163 2 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
164 1.0164 1002 \n Sullage Pump (a) Overhauling of pumps to be done. includes removal,renewal weardown parts and fit back. Item no 164 2 Nos
165 1.0165 1002\nSullage Pump (b) Performance trial for 30 minutes post overhauling. Item no 165 2 Nos
166 1.0166 Stripping Pump Engine,Make:-M/S Greaves,Type:-Air cooled,4-Stroke,Electric Start Diesel Engine,Speed:-3000rpm,Rating:-7.4bhp,SL No:-(Port-A0L0403225,Stbd-A0L0403224) Item no 166 2 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
167 1.0167 1003\nStripping Pump Engine (a) Lub oil sump to be drained, cleaned.(sump capacity 5 liters) Item no 167 1 Nos
168 1.0168 1003\n Stripping Pump Engine (b) Renew air filter element Item no 168 1 Nos
169 1.0169 1003\n Stripping Pump Engine (c) Renew Fuel oil filters element . Item no 169 1 Nos
170 1.017 1003\n Stripping Pump Engine (d) Engine to be started for trial for 30 minutes. Item no 170 1 Nos
171 1.0171 Stripping Pump Make:-M/S B E Pump,Model:-SH80-140N1-DGS2-316,Type:-Horizontal,Self-Priming,Centrifugal,Capacity:-60TPH,Total head:-15MWC,SL NO:-Port-358898,Stbd-358899. Item no 171 2 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
172 1.0172 1004\nStripping Pump (a) Overhauling of pumps includes removal,renewal weardown parts(Shaft,mechanical seals,impeller,gaskets) and fitted back. Item no 172 2 Nos
173 1.0173 1004\nStripping Pump (b) Performance trial for 30 minutes post overhauling. Item no 173 2 Nos
174 1.0174 Genset Make:-Kirloskar,Type:-HA394,Sl No:-03.2017/1021253,Rating:-23.55kw,32Hp Item no 174 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
175 1.0175 1005\n Diesel Generator (a) Renewal of flexible hoses ( EN 853 2SN wire braid, dia 15 mm, with ST 1/4 inch, UNF MALE X Banjo) Item no 175 4 Nos
176 1.0176 1005\n Diesel Generator (b) Air intake filter to be renewed. Item no 176 1 Nos
177 1.0177 1005\n Diesel Generator (c) Renewal of engine oil Qty-10ltr,Oil will be supplied by NAVY Item no 177 1 Nos
178 1.0178 1005\n Diesel Generator (e) Renewal of fuel filters(pre filter &Micro filter element) (Part No. 34.032.02.0 & 34.032.03.0) Item no 178 2 Nos
179 1.0179 1005\n Diesel Generator (f) Renewal of oil filter( Part No. 03.040.19.0) Item no 179 2 Nos
180 1.018 1005\nDiesel Generator (g)Engine to be started for trial for 30 minutes. Item no 180 1 Nos
181 1.0181 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM Item no 181 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
182 1.0182 1006\n Valves (a) Dia 150 mm Item no 182 6 Nos
183 1.0183 1006\n Valves (b) Dia 50 mm Item no 183 7 Nos
184 1.0184 1006\n Valves (c) Dia 15 mm Item no 184 4 Nos
185 1.0185 1006\n Valves (d) Dia 80 mm Item no 185 4 Nos
186 1.0186 Rubber Expansion Bellow (with flange ) to be Renewed. Working Pr- 5 bar, Fluid- sullage oil Item no 186 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
187 1.0187 1007\nBellows (a) Dia 150 mm Item no 187 4 Nos
188 1.0188 1007\nBellows (b) Dia 80 mm Item no 188 4 Nos
189 1.0189 Three way Plug Cock to be Overhauled, Mat - SS Item no 189 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
190 1.019 1008\nCocks (a) Dia 150 mm Item no 190 1 Nos
191 1.0191 1008\nCocks (b) Dia 80 mm Item no 191 1 Nos
192 1.0192 Semi Rotary Hand Pump to be Overhauled Make-VENUS,Model-N97 Item no 192 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
193 1.0193 1009\n Hand Pumps (a) Pump to be overhauled includes renewal of wear down parts. Item no 193 7 Nos
194 1.0194 1009\nHand Pumps (b) Wooden handled to be renewed. Item no 194 7 Nos
195 1.0195 1010\nOverhauling of System V/V \nValves (a)SDNR globe v/v . Dia - 150 mm Item no 195 8 Nos
196 1.0196 1010\nOverhauling of System V/V \nValves (b)SDNR globe suction v/v of sullage tank. Dia- 80 mm Item no 196 6 Nos
197 1.0197 1011\nRelief Valve 80mm Dia Relief Valve to be removed,overhauled,calibrate(pr-04bar) and fitted back. Item no 197 1 Nos
198 1.0198 Glycerine filled Bourden Pr Gauges to be Renewed,Make-AN Instruments Item no 198 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
199 1.0199 1012 \nPr. Gauges (a) Range:- -01 to 01 kg (suction pr gauge) Item no 199 4 Nos
200 1.02 1012\n Pr. Gauges (b) Range:- 0 to 04 kg (discharge gauge) Item no 200 4 Nos
201 1.0201 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) Item no 201 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
202 1.0202 1013\nCO2 Fire Fighting System (a) CO2 cylinders to be removed, chemically cleaned, pressure tested and recharged with 45kg CO2 Item no 202 2 Nos
203 1.0203 1013\nCO2 Fire Fighting System (b) Non return valves on cylinder heads to be overhauled. Item no 203 2 Nos
204 1.0204 1013\nCO2 Fire Fighting System (c) CO2 discharge nozzles to be opened, checked for chockages, cleaned and fitted back Item no 204 10 Nos
205 1.0205 1013\nCO2 Fire Fighting System (d) Overhaul of relief valve assembly Item no 205 1 Nos
206 1.0206 1013\nCO2 Fire Fighting System (e) Overhaul of pressure operated switch Item no 206 2 Nos
207 1.0207 1013\nCO2 Fire Fighting System (f) Complete Co2 system piping to be blown through using HP air to prove system free of blockages Item no 207 1 Nos
208 1.0208 1013\nCO2 Fire Fighting System (g) CO2 cylinders (45 kg capacty) and system pipes to be painted as per coding post work completion. Item no 208 1 Set
209 1.0209 1013\nCO2 Fire Fighting System (h) All system pipes (dia-20 mm) to be painted as per coding post work completion. Item no 209 30 Mtrs
210 1.021 1013\nCO2 Fire Fighting System (j) Renewal of flexible hoses as per sample (pr 275bar) Item no 210 2 Nos
211 1.0211 1013\nCO2 Fire Fighting System (k) Actuator to be overhauled operated by N2 Item no 211 1 Nos
212 1.0212 1013\nCO2 Fire Fighting System (l) Solenoid to be checked for operation and renewed if declared BER. Item no 212 2 Nos
213 1.0213 1013\nCO2 Fire Fighting System (m) Both Nitrogen cylinders to be removed, chemically cleaned, pressure tested and recharged with 10 ltr N2 each Item no 213 2 Nos
214 1.0214 1013\nCO2 Fire Fighting System (n) Pr gauges to be renewed,Make-WIKARange-400 kg/cm2 Item no 214 1 Nos
215 1.0215 1013\nCO2 Fire Fighting System (p) Pr gauges to be renewed,Make-WIKARange-200 kg/cm2 Item no 215 1 Nos
216 1.0216 1013\nCO2 Fire Fighting System (q) Undertake Testing of the CO2 system as follows: Item no 216 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
217 1.0217 1013\nCO2 Fire Fighting System (i) Lamp checks of various ' Indication' in the Control Panel. Replace if defective Item no 217 7 Nos
218 1.0218 1013\nCO2 Fire Fighting System (ii) Open Pilot control Box to check indication on the panel Item no 218 1 Nos
219 1.0219 1013\nCO2 Fire Fighting System (iii) Check Klaxon Horn and strobe comes on. Item no 219 1 Nos
220 1.022 1013\nCO2 Fire Fighting System (iv) Check Hooter and Fire detector replace if defective. Item no 220 1 Nos
221 1.0221 1013\n CO2 Fire Fighting System (q) Pull pressure switch knob of pr swicth for premature discharge to check indication on the panel. Pull the pr switch knob for CO2 discharge indication. Check indication panel. The premature discharge indication shall go off. Reset both the knob after this operation. The indications shoukd go off.\nNote: The entire CO2 system to be proved for functional checks without Co2 Item no 221 1 Nos
222 1.0222 1014\n Misc Renewal of flexible hoses on discharge side of hand pump. Dia-65 mm , length 05 mtr each Item no 222 5 Nos
223 1.0223 1015,\nMisc Sounding caps of tanks damaged to be opened, manufactured as per sample Item no 223 11 No.s
224 1.0224 1016\n Misc Cleaning / Renewal of sight glass of RU tank. Overhaul Spring loaded check valve of both tanks. Joints to be renewed and fitted back. Item no 224 2 No.s
225 1.0225 1017\nMisc Quick Shut Off valves of the fuel tanks to be overhauled. Arrangement of the system involved to be overhauled for operating from remote position.(deck) Item no 225 2 No.s
226 1.0226 1018\nMisc Hydrant v/v and fire hydrants to be overhauled and made operational Dia- 50 mm Item no 226 2 No.s
227 1.0227 ELECTRICAL DEFECT LIST\nEqpt/System: 3ph 3wire sine wave Invertor;AC input 415V,3ph;DC input 360V;AC out put -415V,3Ph,sine wave Item no 227 1 FIRM NOT TO QUOTE HERE , REQUEST TO QUOTE IN SUB SERIAL BELOW
228 1.0228 2001\nInverter carry out overhauling/checking/fault rectification of invertor and made it operational.presently Mother board is not working. Item no 228 1 Nos
229 1.0229 2002\nBatteries Renew the Sealed Maintance free Lead acid batteries2000AH,12V. Make: Exide Item no 229 39 Nos
230 1.023 2003, \nEqpt/System:MSB \nMSB (a) MSB to be overhauled (includes defective switches to be renwed, perished control wiring to be renewed with crimping of proper lugs, marking sleeves to be put on control wiring and loose wirng to be tied with cable ties) (presently there is no deffective parts,all components are working.). Carryout routines mentioned below and prove them for satisfactory performance. (calibration certificates/test reports from NABL recognised Labs are to be submitted.) \n\n\n\n Item no 230 1 Nos
231 1.0231 2003 ,\nEqpt/System:MSB \n MSB \n(b) De-energise switchboard. Remove all busbars, insulators, CTs, PTs, junction boxes, switch contact surfaces, fuse bases/carriers and other components. Clean and decarbonise the busbar using soft brush/calico cloth dipped in alcohol. Thoroughly clean and ascertain the soundness of these components. Repair/replaced them as required. Item no 231 1 Nos
232 1.0232 2003 \nEqpt/System:MSB \n MSB ( c ) Inspect cables and bus bar . Replace all Defective cables, wirings, lugs and termination. Tighten electrical connections and fasteners(Cable -100 mtr,1 sqm for 02 sections ) Item no 232 100 Nos
233 1.0233 2003, \nEqpt/System:MSB \nMSB (d) Apply LOCTITE ( or equivalent compound) to all loose screw/nuts of breaker asemblies. Item no 233 150 Nos
234 1.0234 2003\nEqpt/System:MSB \n MSB ( e ) Examine actuating mechanism and condition of contacts. Carry out repairs/ cleaning / lubrication of all mechanical parts and contacts and check for satisfactory operations Item no 234 4 Nos
235 1.0235 2003\nEqpt/System:MSB \n MSB (f) Rubber mat : Insulating Rubber Mat deteriorated. To be Renewed with oil resistance & very high voltage resistance Electrical rubber mat in front of MSB.(Thickness- 3mm) Make vardhaman model class c Item no 235 6 sq.mtrs
236 1.0236 2004\nBattery Charging System Provide Battery chargering system 12V,DC from shore supply system for DG starting battery-1no at 1 deck, & sullage pump engines starting batteries 12V,180AH-4 nos at pump room Item no 236 2 Nos
237 1.0237 2005\nNav lights Renew the port navigational light fitting TWO stair type (230V,AC & 24V DC) Item no 237 1 Nos
238 1.0238 2006 \nDynamos Over hauling 12V,DC Dynamos Make:TVS Item no 238 5 nos
239 1.0239 2007\nStarters Over hauling of self starters 12V,3HP DC Make:TVS Item no 239 5 Nos
240 1.024 2008\nDG Starting System Carry out overhauling/checking/fault rectification of engine control & starting wiring system and made it operational.Renew the any deffective parts (presently all working) Item no 240 5 Nos
241 1.0241 2009\nMisc Renew the3core 25 sq.mm multy stand copper marine shore supply cable. Item no 241 100 Rmtrs
242 1.0242 2010\nEqpt/System: shore supply pannel \n Shore supply panel Carry out overhaul of shore supply pannel.required to renew the window glass (8"X8") Item no 242 1 Nos
243 1.0243 2011\nEqpt/System: Motors\n Motors Carry out overhaul of 2 in nos blower motors 415V.3Ph,3HP-1no,230V,1Ph,.25HP-1no Item no 243 2 Nos
244 1.0244 2012\nEqpt/System: Ship Name Board \nMisc (a)Renew the acrylic 4mm sheet for name board Size:4'X2.5' Item no 244 2 Nos
245 1.0245 2012\nEqpt/System: Ship Name Board \nMisc (b)Renew the LED tube lights 20W,2',230V AC Item no 245 2 Nos
246 1.0246 2013\nEqpt/System: Wall mounted Fans \nMisc Renew the wall mounted fans 300mm sweep,230V Make:Bajaj/philps Item no 246 8 Nos
247 1.0247 2014\nEqpt/System:Flood lights \nMisc Renew the LED flood lamp 230V,200W Item no 247 2 Nos
248 1.0248 DRY DOCK AND ALLIED SERVICES WORK PACKAGES\n\n(A) Docking and undocking charges (Both Versions) /\nNote:-Docking and undocking will be done by Navy in Navy permises i.e ND(V)/ slipway Item no 248 2 Verson\nFirm not to quote
249 1.0249 (B) Dock blocks preparation & laying out as per docking plan /\nNote :- job will done by Navy Item no 249 2 LS\nFirm not to quote
250 1.025 Dock hire charges for an estimated duration of 60 Days as per OCR/\nDry Dock facility will privided by Navy in Navy permises Item no 250 1 Days\nFirm not to quote
251 1.0251 Wet basin/alongside hire charges for the remaining duration (i.e. total refit duration of – 60 days docking period) Item no 251 1 Days\nFirm not to quote
252 1.0252 Provision of sufficient lighting for duty staff Item no 252 150 Days
253 1.0253 Quote for maintenance of two in no. fire lines for the refit duration . Item no 253 150 Days
254 1.0254 Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is less Item no 254 150 Days
255 1.0255 Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 2000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals.\nNote:- firms to quote. Item no 255 5 Months
256 1.0256 \nMail man services (02 Nos) for entire refit duration (one for user department and one for planning / Co-ordinating department ) to be provided for 10 Hrs per day Item no 256 150 Days
257 1.0257 \n\nQC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS. Item no 257 1 Firm not to quote
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail