| 1 | 1 | Supply of 30.5 Meter tall continously taper polygon Flag mast in sections, hot dip galvanized and suitable for wind velocity as per IS 875 along etc complete as required. | 1 | 1 | set |
|---|
| 2 | 2 | Supply of Lowering system of 30.5 meter tall flag mast including Head frame, lighting finial, double drum winch, SS wire rope, pulleys, clamps etc as required. | 2 | 1 | set |
|---|
| 3 | 3 | Supply of Foundation bolts manufactured from special steel along with nuts, washers, anchor plate and template. | 3 | 1 | each |
|---|
| 4 | 4 | Supply of 1.0 meter high poles along with its accessories complete as required. | 4 | 3 | each |
|---|
| 5 | 5 | Supply of special type Dome etc complete as required. | 5 | 1 | set |
|---|
| 6 | 6 | Supply of PU Paint along with primer & others for 30.5 Meter Flag mast. | 6 | 1 | set |
|---|
| 7 | 7 | Supply of 3Cx2.5 sq.mm copper cable along with aviation light complete as required. | 7 | 1 | set |
|---|
| 8 | 8 | Supply of Double door outdoor electrical control panel for flag mast including reversing starter, timer etc complete as required. | 8 | 1 | each |
|---|
| 9 | 9 | Supply of specially designed 200 Watt LED Light with timer complete for façade lighting of Monumental National Flag on existing poles. | 9 | 3 | each |
|---|
| 10 | 10 | Supply of Indian Monumental National Flag of size 20 ft x 30 ft made out of Polyester fabric with reinforced super strong nylon webbing on all 3 sides & eyelets. | 10 | 2 | each |
|---|
| 11 | 11 | Erection of the Flag mast with the help of suitable equipments including stress fit assembly complete with lowering lifting arrangement complete as required. | 11 | 1 | job |
|---|
| 12 | 12 | Labour & T&P charges for painting of PU paint on flag high mast. | 12 | 1 | job |
|---|
| 13 | 13 | Erection of lighting poles with the help of suitable equipments including fixing of bracket, light fittings complete as required. | 13 | 3 | job |
|---|
| 14 | 14 | Construction of shallow foundation with M25 grade concrete for the flag high mast complete as required. | 14 | 1 | job |
|---|
| 15 | 15 | Foundation of lighting poles | 15 | 3 | job |
|---|
| 16 | 16 | Earthing for high mast with 2.5m long 40mm dia GI pipe including connection to high mast earth terminal with 25x3mm GI flats. | 16 | 2 | job |
|---|
| 17 | 17 | Operation & Maintenance of 30.5 meter tall monumental flag high mast including checking of lowering & lifting operation along with winch & motor, fitment of Monumental National flag, repairing/ stiching of Monumental National flag, checking & tightening of electrical points, any other minor maintenance work including cleaning of base compartment area. (Spare part and replacement of flag as required included and covered in scope of item) ( from the date of completion of installation of Monumental National Flag) | 17 | 12 | months |
|---|
| 18 | 18 | Main Electrical cable - Supply, laying, testing and commisioning of PVC insulated cable of 1.1 KV grade, 2 core, Aluminium Armoured, 4 sq.mm size cable direct in ground. | 18 | 121 | meter |
|---|