Water Resources and Irrigation Government Departments Closing in 0 days TDR #22444853

Sdrf-Kip Rb-Rectification Work Of Karunagappally Branch Canal Between Ch . 5000M And 5510M Rectification Of Canal

Issued by Government Departments · Vallikunnam, Kerala
Tender Value
7.13 Lakhs
Estimated cost
Bid Submission
18 Nov 2019
0 days left
EMD
17900
Bank guarantee accepted
Document Fee
1600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Vallikunnam → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Sdrf-Kip Rb-Rectification Work Of Karunagappally Branch Canal Between Ch . 5000M And 5510M Rectification Of Canal

BOQ

Work Name:SDRF- KIP (RB)- Rectification work of Karunagappally branch canal between Chainage 5000 m and 5510 m
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Scheme :1 Rectification work of Karunagappally branch canal between chainage 5000 M and 5050 MBI01010001010000000000000515BI0100001113
21.01od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site\nBI01010001010000000000000515BI01000011148.625cum
31.0215.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)BI01010001010000000000000515BI01000011150.714cum
41.03od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaegeBI01010001010000000000000515BI01000011167.326cum
51.04od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site\nBI01010001010000000000000515BI0100001117111sqm
61.055.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site\nBI01010001010000000000000515BI01000011180.035cum
72Scheme :2 Rectification work of Karunagappally branch canal between chainage 5050 M and 5100 MBI01010001010000000000000515BI0100001119
82.01od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site\nBI01010001010000000000000515BI010000112014.088cum
92.0215.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)BI01010001010000000000000515BI01000011210.767cum
102.03od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaegeBI01010001010000000000000515BI010000112211.966cum
112.04od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site\nBI01010001010000000000000515BI0100001123181.3sqm
122.055.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site\nBI01010001010000000000000515BI01000011240.056cum
133Scheme :3 Rectification work of Karunagappally branch canal between chainage 5100 M and 5150 MBI01010001010000000000000515BI0100001125
143.01od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site\nBI01010001010000000000000515BI010000112614.375cum
153.0215.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)BI01010001010000000000000515BI01000011270.555cum
163.03od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaegeBI01010001010000000000000515BI010000112812.21cum
173.04od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site\nBI01010001010000000000000515BI0100001129185sqm
183.055.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site\nBI01010001010000000000000515BI01000011300.056cum
194Scheme :4 Rectification work of Karunagappally branch canal between chainage 5150 M and 5190 MBI01010001010000000000000515BI0100001131
204.01od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desiltingBI01010001010000000000000515BI010000113211.5cum
214.0215.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)BI01010001010000000000000515BI01000011330.908cum
224.03od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaegeBI01010001010000000000000515BI01000011349.036cum
234.04od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeBI01010001010000000000000515BI0100001135136.9sqm
244.055.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.BI01010001010000000000000515BI01000011360.049cum
255Scheme :5 Rectification work of Karunagappally branch canal between chainage 5190 M and 5240 M ( Flume)BI01010001010000000000000515BI0100001137
265.0115.56 : Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.BI01010001010000000000000515BI0100001138123.525sqm
275.0250.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site\nBI01010001010000000000000515BI0100001139143.15sqm
285.0313.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointingas per the direction of the departmental officers at site\nBI01010001010000000000000515BI010000114094.5sqm
295.0410.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.BI01010001010000000000000515BI0100001141100kilogram
306Scheme :6 Rectification work of Karunagappally branch canal between chainage 5190 M and 5215 M ( Side Drain)BI01010001010000000000000515BI0100001142
316.012.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soilas per the direction of the departmental officers at site\nBI01010001010000000000000515BI01000011435.88sqm
326.024.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)BI01010001010000000000000515BI01000011442.52cum
336.035.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.BI01010001010000000000000515BI010000114546.4sqm
346.044.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011465.92cum
356.0550.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site\nBI01010001010000000000000515BI010000114750.4sqm
367Scheme :7 Rectification work of Karunagappally branch canal between chainage 5215 M and 5240 M ( Side Drain)BI01010001010000000000000515BI0100001148
377.012.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soilBI01010001010000000000000515BI01000011495.88sqm
387.024.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)BI01010001010000000000000515BI01000011502.52cum
397.035.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.BI01010001010000000000000515BI010000115146.4sqm
407.044.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)as per the direction of the departmental officers at site\nBI01010001010000000000000515BI01000011525.92cum
417.0550.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site\nBI01010001010000000000000515BI010000115350.4sqm

AI Tender Summary

OUR REF NO 22444853
AUTHORITY Government Departments
TENDER VALUE 7.13 Lakhs
LAST DATE 18-11-2019
Authority
Authority Name Irrigation Department
Work Description Sdrf-Kip Rb-Rectification Work Of Karunagappally Branch Canal Between Ch . 5000M And 5510M Rectification Of Canal
Basic Detail
Tender No 41/AEE/KIP/KPY/2019-20
Bidding Type Tender
Location
City Vallikunnam
State Kerala
Key Dates
Publish Date 11 Nov 2019
Submission Date 18 Nov 2019
Open Date 20 Nov 2019
Finance
Tender Value 7.13 Lakhs
Tender Fee 1600
EMD 17900
Exemption Not Available
Document List
Biddoc41aee.pdf
Tendernotice_1.pdf
C62F3495-90AC-427B-B2A9-759D56706184.html
BOQ_440781.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 11, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 18, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 20, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Biddoc41aee.pdf

pdf

Tendernotice_1.pdf

html

C62F3495-90AC-427B-B2A9-759D56706184.html

xls

BOQ_440781.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders