| 1 | 1 | Check survey and pitmarking of various tower location including hire charges for theodolite cost of all materials lead lift labour charges etc complete | Item Code / 1 | 1 | Loc |
|---|
| 2 | 2 | Earth work excavation for foundation in hard gavellysoil, shift black cotton soil, murram, gravel, stoney,earth and earth mixed with small size boulders with hard gravelly soil including initial lead of 10 m and lift of 2 m etc., complete. | Item Code / 2 | 30 | M3 |
|---|
| 3 | 3 | Excavation for foundation in DMR MR not requiring blasting including initial lead of 10 m and lift of 2 m etc., complete. | Item Code / 3 | 44 | M3 |
|---|
| 4 | 4 | Excavation for foundation in DMR MR requiring blasting including initial lead of 10 m and lift of 2 m etc., complete. | Item Code / 4 | 51 | M3 |
|---|
| 5 | 5 | Earth work Excavation for foundation and depositing on bank with initial lead of 10m and lift of 2 m in removing hard rock by blasting and stacking including all leads lifts etc., complete. | Item Code / 5 | 15 | M3 |
|---|
| 6 | 6 | Earth work Excavation for foundation and depositing on bank with initial lead of 10m and lift of 2 m in removing hard rock by wedging and chiselling where blasting is prohibitted and trimming to proper shape including all leads lifts etc., complete. | Item Code / 6 | 8 | M3 |
|---|
| 7 | 7 | PCC 1:3:6 using 20mm HB metal for tower foundation concrete without form work including cost of all materials, labour,curing lead, lift, curing etc., complete. | Item Code / 7 | 3 | M3 |
|---|
| 8 | 8 | PCC 1:2:4 using 20mm HB metal for tower foundation frustum concrete with form work including cost of all materials, labour,curing lead, lift, curing etc., complete. | Item Code / 8 | 27 | M3 |
|---|
| 9 | 9 | PCC 1:2:4, using 20 mm HB metal for tower foundation for chimney concrete including cost of all materials,form works labour, curing lead, lift curing etc., complete. | Item Code / 9 | 2 | M3 |
|---|
| 10 | 10 | Setting of stub and cleat for KCR tower and assembling template with providing of template at site and shifting the template from loc to loc. and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete | Item Code / 10 | 1 | Loc |
|---|
| 11 | 11 | Back filling with excavated earth other than sand including watering consolidation in 150mm thick layer and forming platform around tower legs with excess earth etc., complete. | Item Code / 11 | 114 | M3 |
|---|
| 12 | 12 | Transporting of excess excavated earth away from site within a lead of 100 m including all labours, lead, lift etc., complete. | Item Code / 12 | 31 | M3 |
|---|
| 13 | 13 | Providing pipe type earthing including necessary exca-vation for fixing 3M long of 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the earth strips with the legs of the stub including cost of pipe refilling earth, fixing charges transport lead, lift, labour,etc., complete. | Item Code / 13 | 1 | No |
|---|
| 14 | 14 | Plastering with CM 1:3, 12 mm thick for coping portion including cost of all materials, labour, lead, lift curing etc., complete. | Item Code / 14 | 2 | M2 |
|---|
| 15 | 15 | Erection of GI tower parts , including sorting loading, transporting from store unloadingat site erection of tower tightening , punching of bolt & nut and final checking rectification of tower parts if any during erection and transporting etc | Item Code / 15 | 6.2 | MT |
|---|
| 16 | 16 | Fabrication and erection of one number square cross arm, including sorting loading, transporting from store unloadingat site erection of tower tightening , punching of bolt & nut and final checking rectification of tower parts if any during erection and transporting etc | Item Code / 16 | 0.6 | MT |
|---|
| 17 | 17 | Tack welding of bolt nuts in the newly erected tower upto bottom crossarm leval including three tack weld for each bolt nut hire charges for welding machine cost of welding rod and painting with cold galvanized paint over welded portion including cost all materials T&P labour lead lift etc complete | Item Code / 17 | 1050 | Nos |
|---|
| 18 | 18 | Painting with anticorrosive black paint upto 1m height from chimney leval ncluding cost all materials T&P labour lead lift etc complete | Item Code / 18 | 1 | Loc |
|---|
| 19 | 19 | Arranging and availing line clear in HT/LT/EHT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT, LT, EHT, lines earthing including all , T&P , lead lift labour etc., complete. | Item Code / 19 | 1 | No |
|---|
| 20 | 20 | Providing temporary guys at the time of stringing of power conductor and earth wire etc., rough sagging and single tensioning with necessary excavation of pits fixing rails etc., and dismantling stay after completion of work including all , T&P , lead lift labour etc., completen | Item Code / 20 | 1 | No |
|---|
| 21 | 21 | Providing well suported trussle using 7.5 cm to 10 cm and above dia bampoo post withnecessary bracing on either side of road crossing up to 5 meter height for supporting to the power conductor and earthwire during paying out of conductor and tensioning operation including cost of lead, lift, labour, major & minor T & Ps etc., Complete as per standard specification. | Item Code / 21 | 1 | No |
|---|
| 22 | 22 | Lowering of 8 units of tension insulators with fittings transporting from stores to site including cost of all T&Ps with all labour, lead, lift etc., complete as per standard specification | Item Code / 22 | 18 | Sets |
|---|
| 23 | 23 | Strining of 3 Nos Leopard conductor, including sorting loading, transporting from store paving out, Rough sagging, Tensioning clipping, providing vibration dampers for tension locations including giving jumper connection including cost of transporting, lead, lift, labour, major & minor T &Ps etc., as per Standard specification complete | Item Code / 23 | 2 | Span |
|---|
| 24 | 24 | Releasing and stringing of 1 No. OPGW 24 fibre DWSM cable including fixing of Hard ware fittings and accessories etc., complete for the line (Stringing of OPGW conductor is to be done using tension stringing equipments) | Item Code / 24 | 2 | Span |
|---|
| 25 | 25 | Releasing and lowering of 3 Nos. Leopard conductor and 1 No. OPGW including cost of all major and minor T&Ps with all leads, lifts etc., complete | Item Code / 25 | 5 | Span |
|---|
| 26 | 26 | Dismantling the existing various types of towers, transporting & removing/clear from the site by the contractor as it is wherein condition by weghing the existing tower parts in way bridge in the presence of the TANTRANSCO officials including cost of all T&Ps welding machine, welding rods and cost of Transport etc., complete | Item Code / 26 | 12 | MT |
|---|
| 27 | 27 | Hoisting of 8 units of tension insulators with fittings transporting from stores to site including cost of all T&Ps with all labour, lead, lift etc., complete | Item Code / 27 | 18 | Sets |
|---|
| 28 | 28 | Supplying and fixing of Name board of size 0.750 x 0.450mm using 18 gauge MS sheet with 25x25x3mm MS angle frame painting with approved enamel painting two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labours, lead, lift, etc., complete as per standard specification. | Item Code / 28 | 1 | No |
|---|
| 29 | 29 | Supply and fixing Number plate, including all lead, lift, etc., complete | Item Code / 29 | 1 | No |
|---|
| 30 | 30 | Supply and Fixing of Danger board, wherever necessary including all lead, lift, etc., complete. | Item Code / 30 | 1 | No |
|---|
| 31 | 31 | Supply and fixing of Phase plate, wherever necessary including all lead, lift, etc., complete. | Item Code / 31 | 1 | Sets |
|---|
| 32 | 32 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | Item Code / 32 | 1 | Percentage |
|---|
| 33 | 33 | CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | Item Code / 33 | 1 | Percentage |
|---|
| 34 | 34 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \"0\" only | Item Code / 34 | 1 | Percentage |
|---|