Description :KIT OF HOSE ASSLY FOR WATER COOLING SYSTEM CONSISTING OF TWELEVE\rITEMS.As per drg. DRG NO.1.E.RLY DRG NO.CCC/DL-761 ALT .5. ITEM 1 TO 12. [ALONG WITH SPECIAL\rTERMS AND CONDITIONS] 2.DSL/TKD SK NO.M-1402 ALT.NIL FOR ITEM 4 OF E.RLY. DRG NO.CCC/DL-\r761. SPECIAL CONDITIIONS: (1)-THE HOSE WHEN ASSEMBLED SHOULD NOT BE MORE THAN 12\rMONTHS OLD FROMTHE DATE OF MANUFACTURE AS MENTIONED ON LONGITUDINAL STRIP ON\rTHE HOSE .(2)-DURING INTERNALINSPECTION BY THE FIRM100% HOSE ASSLY WILL BE TESTED UP\rTO PROOF OF PRESSURE 10% TESTING OFHOSE ASSLY WILL BE DONE BY THE INSPECTING\rAUTHORITY AYT PROOF OF PRESSURE.(3)-THE PACKINGMARKING WILL BE DONE AS INDICATED IN\rTHE DRAWING.(4)-ASSEMBLER MUST HAVE TESTING FACILITES FORTESTING THE HOSE\rASSLY.MINIMUM UP TO PROOF OF PRESSURE. IN CASE OF AUTHORIZED AGENT\rOFMANUFACTURER THE INSPECTION WILL BE CARRIED OUT AT PRINCIPAL'S PREMISES.(5)-\rMATERIAL WILL BESUPPLIED IN THE ORIGINAL PACKING OF MANUFACTURE.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.