Preparation Of Fire Mitigation Plan And City Safety Plan Including Handholding Support For Its Effective Implementation
Tender Overview
Project Description
Preparation Of Fire Mitigation Plan And City Safety Plan Including Handholding Support For Its Effective Implementation , Details , Preparation Of Fire Mitigation Plan , Technical Expert ( Urban Services ) , Technical Expert ( Environment & Social ) , Carrying Out Electronic Survey ( Totalstation Survey ) With Geo-Referencing , Carrying Out The Survey Of The Transit Corridor / Project Area Using Mid Height Capability Mapping Drone Of Indian Licensed Manufacturer Having Various Interoperable Medium Altitude Long Endurance ( Male ) Drone With Atleast 24 Megapixel Camera And Variety Of Payload And Sensors , The Detailed Topographic Survey Of The Transit Corridor / Project Area Shall Be Done Using Digital Aero Triangulation And Gps And Will Be Produced In Both Electronic Format ( In X , Y , Z Coordinate System ) , 3D Models And Hard Copies . The Digital Output Needs To Be A High-Resolution 3D Model Of The Existing Conditions With Anavigablefully Photo-Textured , Geographically Located 3D Model With Precise Geometric . A Licensed Version Of The Software Future Processing Needs To Be Delivered Along With The 3D Model . Plans , Longitudinal Sections And Cross Sections Shall Be Prepared To The Scale . , The Agency Needs To Use Still Oblique Photography Of The Project Area To Create 3D Vector Model , The Agency Needs To Create A Scaled 3D Rendered Model In 3D Max Software Having Resolution Upto 4K Of The Transit Corridor And Drawings Supplied By Client , The Said 3D Model Of The Proposed Structures Needs To Be Incorporated On Actual Model So Created Of The Transit Corridor / Project Area , The Animation Film In Augmented Reality Software Using The Rendered Models And Actual Videos With Well Researched And Drafted Script In Marathi , Hindi And English Languages , Prepare Final Documentary Film Of Actual Work Been Done And The Challenges Faced Using Stock Photos And Videos ) , Safety Assessment And Audit Of Assets As Per Guidelines Of Government Issued From Time To Time ( Structures E . G Building ) , Safety Assessment And Audit Of Assets As Per Guidelines Of Government Issued From Time To Time ( Linear Structures E . G . Road ) , Team Leader / Project Manager , Conduct Road Safety Audit , Preparation Of Designs , Plans And Estimates & Bid Documents For The Road And Other Allied Infrastructure Works , Conduct Periodic Supervision Certification & Handholding Support For Effective Implementation
BOQ
| Name of Work: preparation of fire mitigation plan and city safety plan including handholding support for its effective implementation | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Details | |||
| 2 | 1.01 | Preparation of Fire Mitigation Plan | item1 | 1 | LS |
| 3 | 1.02 | Technical Expert (Urban Services) | item2 | 12 | month |
| 4 | 1.03 | Technical Expert (Environment & Social) | item3 | 12 | month |
| 5 | 1.04 | Carrying out electronic survey (TotalStation Survey) with Geo-referencing | item4 | 50 | per km |
| 6 | 1.05 | Carrying out the survey of the transit corridor / project area using mid height capability mapping drone of Indian licensed manufacturer having various interoperable medium altitude long endurance (MALE) drone with atleast 24 megapixel camera and variety of payload and sensors | item5 | 50 | per km |
| 7 | 1.06 | The detailed topographic survey of the transit corridor / project area shall be done using digital aero triangulation and GPS and will be produced in both electronic format (in X, Y, Z Coordinate system), 3D Models and hard copies. The digital output needs to be a high-resolution 3D model of the existing conditions with anavigablefully photo-textured, geographically located 3D model with precise geometric. A licensed version of the software future processing needs to be delivered along with the 3D model. Plans, longitudinal sections and cross sections shall be prepared to the scale. | item6 | 50 | per km |
| 8 | 1.07 | The agency needs to use still oblique photography of the project area to create 3D vector model | item7 | 50 | per km |
| 9 | 1.08 | The agency needs to create a scaled 3D rendered model in 3D max software having resolution upto 4K of the transit corridor and drawings supplied by Client | item8 | 50 | per km |
| 10 | 1.09 | The said 3D model of the proposed structures needs to be incorporated on actual model so created of the transit corridor / project area | item9 | 50 | per km |
| 11 | 1.1 | The animation film in Augmented Reality software using the rendered models and actual videos with well researched and drafted script in Marathi, Hindi and English languages | item10 | 20 | Per minute of rendering / shooting |
| 12 | 1.11 | Prepare final documentary film of actual work Been done and the challenges faced using stock photos and videos) | item11 | 10 | Per minute of rendering / shooting |
| 13 | 1.12 | Safety Assessment and Audit of Assets as per Guidelines of government issued from time to time (Structures e.g Building) | item12 | 1 | sq.km |
| 14 | 1.13 | Safety Assessment and Audit of Assets as per Guidelines of government issued from time to time (linear Structures e.g. Road)\n | item13 | 1 | Running km. |
| 15 | 1.14 | Team Leader / Project Manager | item14 | 1 | month |
| 16 | 1.15 | Conduct Road Safety Audit | item15 | 1 | Running km. |
| 17 | 1.16 | Preparation of Designs, Plans and Estimates & Bid Documents for the Road and Other Allied Infrastructure works | item16 | 1 | Running km. |
| 18 | 1.17 | Conduct Periodic Supervision Certification & Handholding Support for Effective Implementation | item17 | 1 | Percentage of the Project Cost |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender