Agriculture Cooperative Closing in 0 days TDR #22388424

Construction Of Compound Wall & Gate, Fencing, Office Building & Toilets For Nabard Godown Site At Nizamsagar Mandal Under Amc., Pitlam Of Kamareddy District.

Issued by Cooperative · KAMAREDDY, Telangana
Tender Value
26.78 Lakhs
Estimated cost
Bid Submission
21 Nov 2019
0 days left
EMD
26800
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
KAMAREDDY → Telangana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Compound Wall & Gate, Fencing, Office Building & Toilets For Nabard Godown Site At Nizamsagar Mandal Under Amc., Pitlam Of Kamareddy District.

BOQ

b'
S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Construction of Compound Wall and Gate Spl. Spn 1.00 Each 3000.00 3000.00
Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia \'B\' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.D no 5.1.1
2 Construction of Compound Wall and Gate Spl. Spn 1.00 Each 2700.00 2700.00
Supply and fixing of 4 way SPN Distribution board with IP-20 protection suitable for 4 nos SP MCB\'s single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting with 40A DP Isolator / RCCB / ELCB - 1 No for incomer and 6-32A SP MCBs - 4Nos for outgoing of makes Legrand / Schneider etc., complete.D no 4.4.1(A)
3 Construction of Compound Wall and Gate Spl. Spn 6.00 Each 300.00 1800.00
Supply and fixing of modular type 6A 3/2 pin wall plug socket with 6A switch control on a common board of makes Legrand Arteor / MK blenge / Scheider Zen Celo with earth continuity including wire leads, earth connections along with all labour charges etc., complete.D no 2.1.4(B)
4 Construction of Compound Wall and Gate Spl. Spn 10.00 Point 500.00 5000.00
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant FRLS P.V.C. insulated 1100v grade as per IS:694/1990 sepacification of flexible copper cable (ISI MARK)of makes Polycab/ Havells/ Suncab / Goldmedal/ million/ Fortune art / Paragon / HPL / L & T / Power flex / RPG / Anchor / Bonton in existing pipe with modular type 6A/10A switch with cover frame and Ceiling rose of makes Legrand Arteor / MK blenge / Schneider Zen Celo & 12 module covering plate of makes Legrand arteor / MK blenge / Schneider zen celo, 12 module metal box to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings .D no 2.1.1(B)
5 Construction of Compound Wall and Gate Spl. Spn 50.00 Rmt 52.00 2600.00
e) Electrical items:- Supply and Fixing of 20mm dia 1.5mm thick surface rigid P.V.C. pipe (ISI MARK) As per IS:9537 part III with all accessories fixing on chromium plated metallic base saddles and decolam board for switches for Light, Fan and separate plug point including all labour charges etc., complete. of makes Sudhakar / Maco plast / Modi. D no 1.4.2(b)
6 Construction of Compound Wall and Gate Spl. Spn 6.00 Each 867.54 5205.00
Supply and fixing of RCC rings 1.00mt dia NP-2 Class conforming to BIS 458/2003 for septic tank including cost and conveyance of all materials and labour charges, etc., complete as per standard specification and as directed by Departmental Engineer.
7 Construction of Compound Wall and Gate Spl. Spn 4.00 Each 254.49 1018.00
Supply and Fixing of 15mm Brass body C.P. finish bib taps including cost and conveyance of all materials and labour charges etc., complete. (TBSP-F.I-01)
8 Construction of Compound Wall and Gate Spl. Spn 1000.00 Ltrs 7.95 7950.00
Supply of Sintex or equivalent Polythylene water storage tank double layer conforming to ISI 12701/96 mark with lid. including cost and conveyance of all materials and labour charges etc., complete.
9 Construction of Compound Wall and Gate Spl. Spn 1.00 Each 1278.16 1278.00
Supply and fixing of 25.00mm Bronze Gate / Globe valve ISI mark with its fittings including cost and conveyance of all materials and labour charges, etc., complete as per standard specification and as directed by Departmental Engineer.
10 Construction of Compound Wall and Gate Spl. Spn 2.00 Each 875.97 1752.00
Supplying and fixing white glazed flat back bowl urinals of size 440mmx265mmx315mm with internal flushing rim fixed with screws complete indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 including cost and conveyance of all materials and labour charges etc., complete.
11 Construction of Compound Wall and Gate Spl. Spn 20.00 Rmt 305.62 6112.00
Supply and fixing of 20mm nominal bore GI pipe ISI make with its fittings including cost and conveyance of all materials and labour charges, etc., complete as per standard specification and as directed by Departmental Engineer.
12 Construction of Compound Wall and Gate Spl. Spn 20.00 Rmt 210.18 4204.00
Supply and fixing of 15mm nominal bore GI pipe ISI make with its fittings including cost and conveyance of all materials and labour charges, etc., complete as per standard specification and as directed by Departmental Engineer
13 Construction of Compound Wall and Gate Spl. Spn 1.00 Each 1676.95 1677.00
Supplying and Fixing of Indian make Flat Back Wash Hand Basin (HSW/Parryware/Nycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Esso or equivalent complete with standard CI brackets including wooden block including cost and conveyance of all materials and labour charges etc., complete.
14 Construction of Compound Wall and Gate Spl. Spn 2.00 Each 2384.77 4770.00
Supply & fixing Low down porcelain flushing tank 10 liters capacity Hindustan Sanitary ware/Parry/Neycer with internal components including cost and conveyance of all materials and labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge
15 Construction of Compound Wall and Gate Spl. Spn 2.00 Each 1567.88 3136.00
d) Sanitary Items ;- Supply and Fixing of Indian pattern white glazed W.C. 1st quality ISI marked conforming to IS: 2556-Part-3-1981 with \"P\" or \"S\" trap Hindware/ Parryware/ Neycer-ISI Mark 630mm x 450mm including cost and conveyance of all materials and labour charges etc., complete.
16 Construction of Compound Wall and Gate 1201 & 1216 108.38 Sqm 114.75 12437.00
Painting to new walls with 2 coats of Emulsion Paint for external walls of approved brand and shade throughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work but excluding conveyance charges of materials
17 Construction of Compound Wall and Gate 402.0 0.22 Cum 5292.75 1164.00
Laying of CC M20 grade nominal mix using 662/3%of 40mm metal and 331/2% of 20mm metal including cost and conveyance of all materials and all labour charges etc complete for finsihed item of work.
18 Construction of Compound Wall and Gate Spl. Spn 36.72 Sqm 750.26 27550.00
Dadoing with ceramic tiles set over abase coat of cement mortar (1;8) 12 mm thick over cc bed already laid including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm &jointed neatly with white cement paste to full depth mixed with pigments of matching shade etc., complete for finished item of work.
19 Construction of Compound Wall and Gate 701 & 707 8.10 Sqm 757.34 6134.00
Flooring with ceramic tiles set over abase coat of cement mortar (1;8) 12 mm thick over cc bed already laid including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm &jointed neatly with white cement paste to full depth mixed with pigments of matching shade etc., complete for finished item of work.
20 Construction of Compound Wall and Gate 701 & 707 12.96 Sqm 1056.17 13688.00
Flooring with vitrified tiles of 1st quality glossy finishing of size 598 x 598 x 8 mm set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
21 Construction of Compound Wall and Gate 309 & 310 10.80 Cum 280.22 3026.00
Filling of basement with gravel from approved source, in layers not exceeding 150mm thick consolidating each deposited layer by watering and ramming and power roller rolling with 8 to 10 tonne including cost and conveyance of water to work site and all operational, incidental and labour charges etc., completed as per standard specifications and as directed by departmental Engineer in charge.
22 Construction of Compound Wall and Gate 126.0 0.10 MT 56273.51 5627.00
Providing TMT bars of Fe-415 grade as per IS 1786-1979 of different diameters for RCC works, including labour charges for streightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No. 126)
23 Construction of Compound Wall and Gate Spl. Spn 2.88 Sqm 7281.58 20971.00
Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows three track - only two glass shutters sliding duly manufactured using UPVC reinforced profiles of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.0 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories like locking system 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work. (BMT-P.67)
24 Construction of Compound Wall and Gate Spl. Spn 2.93 Sqm 2537.02 7433.00
Supply and fixing of Cement Bonded Prelaminated Particle Board single door shutter using 16MM Cement Bonded Prelaminated Particle Board with all round section ?U? size of mm thick galvanized pre-painted cold rolled steel profiles Cement Bonded Prelaminated Particle Board with necessary screws fixed at every 1?0? ( 304.8mm) intervals. The cost inclusive of MS Nickel coated 250mm long Aldrops 2 no?s , MS powder coated 250mm long tower bolt 1 no?s, 2no?s MS powder coated 125mm long grip handle, 1 no?s M.S.P.C. Door stopper. Including cost and conveyance of all materials at site labour charges etc., complete finished item of work. (TBSC-L.II-13)
25 Construction of Compound Wall and Gate Spl. Spn 3.78 Sqm 5181.57 19586.00
Supply and Fixing doors as per drawings with 2nd class teak wood frame of section 100mmx 65mm and ISI marked flush door shutters of 25mm thick single shutter with bond wood solid block board type with comercial ply on both sides core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) including cost and conveyance to site of teak wood frame, flush shutter, MS Z hold fasts of size 300mmx40mmx5mm including cost of IS marked Aluminium fixutures of 3 No\'s but hinges 100mm long, 1 No aldrop 300mm x 16mm dia, 1 No tower bolt of 200mmx12mm dia at top, 1 No brass heavy handles, 1 No heavy duty door stopper and 1 No door closer automatic hyper brand IS-3564 including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc complete for finished item of work. (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) (900mm x 1950mm)
26 Construction of Compound Wall and Gate Spl. Spn 30.26 Sqm 823.70 24925.00
Roofing With 0.5mm thick galvanized /pre painted G.I profiled sheets fixed to the purlins With 14 size self drilling with neoprene washer Side laps are stiched with self tapping drilling screws .End laps are to be sealed with 25x3 mm Butyl tape .the sheets are provided with anti capillary groove.including cost and labour charges etc., complete as per standard specification for finished item of work inclusive of all taxes and including VAT.
27 Construction of Compound Wall and Gate Spl. Spn 24.92 Rmt 378.41 9430.00
Supply and fixing of 48.30 mm Dia MS tubular Rafters of medium class as per Approved drawings over anchor bolts including cost and conveyance of all materials and labour charges etc., complete. As per Standard Specifications and as directed by Departmental Engineer
28 Construction of Compound Wall and Gate Spl. Spn 22.98 Rmt 378.41 8696.00
Supply and fixing of 48.30 mm Dia MS tubular Purlins of medium class as per Approved drawings over anchor bolts including cost and conveyance of all materials and labour charges etc., complete. As per Standard Specifications and as directed by Departmental Engineer
29 Construction of Compound Wall and Gate 901, 903 & 904 52.61 10Sqm 2025.24 10655.00
Plastering with 20mm thick CM (1:5) prop including cost and conveyance of all materials to site from approved source including of all materials , labour charges, curing for required period and finishing smooth to perfect plumb all other incidental and operational charges etc., complete as per standard specifications and as directed by Departmental Engineer.
30 Construction of Compound Wall and Gate 901, 903 & 904 55.77 10Sqm 1366.91 7623.00
Plastering with 12mm thick CM (1:5) prop including cost and conveyance of all materials to site from approved source including of all materials , labour charges, curing for required period and finishing smooth to perfect plumb all other incidental and operational charges etc., complete as per standard specifications and as directed by Departmental Engineer.
31 Construction of Compound Wall and Gate 501 & 504 13.78 Cum 6057.29 83469.00
Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site including and scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.
32 Construction of Compound Wall and Gate 402 & 403 8.40 Rmt 657.26 5521.00
Vibrated Reinforced Cement Concrete M20 Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry fine Aggregate (sand) and cement of 330 kgs, water etc., including cost and conveyance of all materials to site and cost of and all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work and as per standard specification and asdirected by the Departmental Engineer b) Sunshades
33 Construction of Compound Wall and Gate 402 & 403 0.92 Cum 11198.09 10302.00
Vibrated Reinforced Cement Concrete M20 Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry fine Aggregate (sand) and cement of 330 kgs, water etc., including cost and conveyance of all materials to site and cost of and all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work and as per standard specification and asdirected by the Departmental Engineer a) Lintels
34 Construction of Compound Wall and Gate 402.0 3.50 Cum 5102.54 17859.00
Plain C.C masonary in cement Concrete (1:3:6) prop. using 40 mm metal machine crushed, blasting, incuding cost and conveyanc of all materials to site of work, centering charges labour charges, mortar mixing charges and curing for required period etc., complete as per Standard Specification and as directed by the Engineer-in-charge for finished item of work .
35 Construction of Compound Wall and Gate 402.0 4.34 Cum 3684.61 15991.00
PCC (1:5:10) prop.using 40mm HBG machine crushed metal and unscreened sand including cost and conveyance of all materials to site from approved source, centering machine mixing & vibrating, laying concrete in position, tamping curing for requred period, labour charges for all items all other incidental and operational charges etc.,complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.
36 Construction of Compound Wall and Gate 308.0 9.46 Cum 322.06 3047.00
c) Office building :- Earth work excavation for foundations in loamy and clay soils like block cotton soils, red earth and ordinary gravelly soils with an intial lead of 10m and intial lift of 2m and disposal of soils as directed by the Engineer-in-charge of works including all leads and lifts, shoring, structting etc., excluding bailing out of water etc., complete for all items of other incidental and operational charges etc.,complete as per standard specification and as directed by departmental Engineer for finished item of work.
37 Construction of Compound Wall and Gate 1605 & 1606 227.00 Rmt 848.70 192655.00
Providing 1.50 metre high fencing with RCC posts 150 mm x 150 mm x 2000 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end and every 10th post to be strutted, provided with Hot dipped Galvvanised iron chain link mesh 8 gauge and fixed to RCC posts etc. complete in all respects. (MORTH Suggestive )
38 Construction of Compound Wall and Gate 402.0 4.33 Cum 5102.54 22094.00
Plain C.C masonary in cement Concrete (1:3:6) prop. using 40 mm metal machine crushed, blasting, incuding cost and conveyanc of all materials to site of work, centering charges labour charges, mortar mixing charges and curing for required period etc., complete as per Standard Specification and as directed by the Engineer-in-charge for finished item of work .
39 Construction of Compound Wall and Gate 402.0 3.07 Cum 3684.61 11312.00
PCC (1:5:10) prop.using 40mm HBG machine crushed metal and unscreened sand including cost and conveyance of all materials to site from approved source, centering machine mixing & vibrating, laying concrete in position, tamping curing for requred period, labour charges for all items all other incidental and operational charges etc.,complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.
40 Construction of Compound Wall and Gate 308.0 9.20 Cum 322.06 2963.00
b) Providing Fencing :- Earth work excavation for foundations in loamy and clay soils like block cotton soils, red earth and ordinary gravelly soils with an intial lead of 10m and intial lift of 2m and disposal of soils as directed by the Engineer-in-charge of works including all leads and lifts, shoring, structting etc., excluding bailing out of water etc., complete for all items of other incidental and operational charges etc.,complete as per standard specification and as directed by departmental Engineer for finished item of work.
41 Construction of Compound Wall and Gate 909.0 1316.12 10Sqm 550.98 72516.00
Colour Washing Two coats with approved colour including gum Gungee water Prickly juice including necessary fire wood including cost and conveyance of all materials to site all taxes, including labour charges for mixing and brushed etc., complete for finished item of Work
42 Construction of Compound Wall and Gate Spl. Spn 700.00 Kg 102.82 71974.00
Supply and Fixing of MS gates including cost and conveyance of all materials and labour charges etc., complete as per standard specifications and as directed by Departmental Engineer.
43 Construction of Compound Wall and Gate 901, 903 & 904 579.56 10Sqm 2025.24 117375.00
Plastering with 20mm thick CM (1:5) prop including cost and conveyance of all materials to site from approved source including of all materials , labour charges, curing for required period and finishing smooth to perfect plumb all other incidental and operational charges etc., complete as per standard specifications and as directed by Departmental Engineer.
44 Construction of Compound Wall and Gate 901, 903 & 904 736.56 10Sqm 1366.91 100681.00
Plastering with 12mm thick CM (1:5) prop including cost and conveyance of all materials to site from approved source of all materials , labour charges, curing for required period and finishing smooth to perfect plumb all other incidental and operational charges etc., complete as per standard specifications and as directed by Departmental Engineer.
45 Construction of Compound Wall and Gate 501 & 504 103.15 Cum 6057.29 624809.00
Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site and scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.
46 Construction of Compound Wall and Gate 126.0 5.67 MT 56273.51 319071.00
Providing TMT bars of Fe-415 grade as per IS 1786-1979 of different diameters for RCC works, including labour charges for streightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No. 126)
47 Construction of Compound Wall and Gate 402 & 403 13.03 Cum 11039.03 143839.00
Vibrated Reinforced Cement Concrete M25 Design Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry fine Aggregate (sand) and cement of 330 kgs, water etc., including cost and conveyance of all materials to site and cost of all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work and as per standard specification and asdirected by the Departmental Engineer c) For Columns
48 Construction of Compound Wall and Gate 402 & 403 27.95 Cum 10852.70 303333.00
Vibrated Reinforced Cement Concrete M25 Design Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry fine Aggregate (sand) and cement of 330 kgs, water etc., including cost and conveyance of all materials to site and cost of all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work and as per standard specification and asdirected by the Departmental Engineer b) For Ground beam
49 Construction of Compound Wall and Gate 402 & 403 24.30 Cum 8539.50 207510.00
Vibrated Reinforced Cement Concrete M25 Design Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry fine Aggregate (sand) and cement of 330 kgs, water etc., including cost and conveyance of all materials to site and cost of all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work and as per standard specification and asdirected by the Departmental Engineer a) For Footings
50 Construction of Compound Wall and Gate 402.0 21.37 Cum 3684.61 78740.00
PCC (1:5:10) prop.using 40mm HBG machine crushed metal and unscreened sand including cost and conveyance of all materials to site from approved source, centering machine mixing & vibrating, laying concrete in position, tamping curing for requred period, labour charges for all items all other incidental and operational charges etc.,complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.
51 Construction of Compound Wall and Gate 308.0 130.18 Cum 322.06 41926.00
Compound wall :- Earth work excavation for foundations in loamy and clay soils like block cotton soils, red earth and ordinary gravelly soils with an intial lead of 10m and intial lift of 2m and disposal of soils as directed by the Engineer-in-charge of works including all leads and lifts, shoring, structting etc., excluding bailing out of water etc., complete for all items of other incidental and operational charges etc.,complete as per standard specification and as directed by departmental Engineer for finished item of work.
'

AI Tender Summary

OUR REF NO 22388424
AUTHORITY Cooperative
TENDER VALUE 26.78 Lakhs
LAST DATE 21-11-2019
Authority
Authority Name Agricultural Marketing Department
Work Description Construction Of Compound Wall & Gate, Fencing, Office Building & Toilets For Nabard Godown Site At Nizamsagar Mandal Under Amc., Pitlam Of Kamareddy District.
Basic Detail
Tender No SE(AM)/TS/HYD/Ep/07/22/2019-20
Bidding Type Tender
Location
City KAMAREDDY
State Telangana
Key Dates
Publish Date 06 Nov 2019
Submission Date 21 Nov 2019
Open Date 01 Jan 0001
Finance
Tender Value 26.78 Lakhs
Tender Fee Ref. Documents
EMD 26800
Exemption Not Available
Document List
281804b4-56ff-467c-b32e-84c74ba30324.html
07-22 Tender Document Civil.zip

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 06, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 21, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed

Tender Documents

Download All (ZIP) ↓