Agriculture Cooperative Closing in 0 days TDR #22388414

Construction Of Office Building Of O/O Executive Engineer (M) Telangana Region And O/O Deputy Executive Engineer, Ranga Reddy District In Mahaboob Mansion Complex, Malakpet Under Amc., Hyderabad Of Hyderabad District.

Issued by Cooperative · HYDERABAD, Telangana
Tender Value
43.39 Lakhs
Estimated cost
Bid Submission
21 Nov 2019
0 days left
EMD
43400
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
HYDERABAD → Telangana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Office Building Of O/O Executive Engineer (M) Telangana Region And O/O Deputy Executive Engineer, Ranga Reddy District In Mahaboob Mansion Complex, Malakpet Under Amc., Hyderabad Of Hyderabad District.

BOQ

b'
S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Construction of Office Building of O/o Executive Engineer Spl. Spn 5.00 Each 309.00 1545.00
Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
2 Construction of Office Building of O/o Executive Engineer Spl. Spn 5.00 Each 3280.00 16400.00
Supply, Transportation of 12\" (300mm) ISI 900 RPM Heavy duty exhaust fan with metallic blades wiremesh with all accessories etc., complete Makes : Crompton / Almoured / Havells / Turbo Force etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
3 Construction of Office Building of O/o Executive Engineer Spl. Spn 150.00 Rmt 55.00 8250.00
Supply and laying of PVC casing and caping (ISI Mark) with double locking arrangements with groover trunking of size not below 12.50mm height 25mm size with all accessories duly sealed at points and erected on wall / ceiling including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
4 Construction of Office Building of O/o Executive Engineer Spl. Spn 4.00 Each 2500.00 10000.00
Supply of 4.0 KVA Stabilizer 1. Item no 1252 pg no 298 of 2019-20 SSR
5 Construction of Office Building of O/o Executive Engineer Spl. Spn 4.00 Each 1600.00 6400.00
Installation of Split Air Conditioners. Item no 1221 pg no 295 of 2019-20 SSR
6 Construction of Office Building of O/o Executive Engineer Item no 1163 b pg no 291 of 2019-20 SSR 4.00 Each 46000.00 184000.00
Supply and Transportation of 1.5 TR 5 Star capable of delivering 18000 BTU/hr andabove with operating on refrigerant R-32 / R-410Makes : Daikin / Toshibha / Carrier / Blue Star / Hitachi of INVERTER Model Cooltype split AC unit with high wall mounted Single Split100% copper indoor and outdoor condencing unitHermetically sealed compressor suitable for operation on230V, 50Hz, 1Phase AC supply capable of performing Heatcool dehumidifying air circulating and filtering withcooling and condensing units with 3.0 mts of copper piping,insulation kit and 4 mts of 4 core copper flexible chord(Voltage range 160- 264 volts) and cordless remote controlwith 2 years warranty and annual maintenance contract. Item no 1163 b pg no 291 of 2019-20 SSR
7 Construction of Office Building of O/o Executive Engineer Data 37 25.00 Rmt 117.00 2925.00
Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan complete. (Data 37)
8 Construction of Office Building of O/o Executive Engineer Data 34 25.00 Each 2428.00 60700.00
Supply and transportation of 48\" (1200mm) Sweep 5 Star rated Ceiling Fan ISI Mark as per IS 374 - 1979 with double ball bearings but without regulator including all standard accessories etc., complete. Makes : Crompton / Havells / Orient . (Data 34)
9 Construction of Office Building of O/o Executive Engineer Spl Spn 20.00 Each 4283.00 85660.00
Supply and Transportation of 36W, 2\' x2\' (600mm x 600mm) slim panel LED luminaire Square Housing Made of Aluminum alloy with corrosion resistant powder coat, with acrylic diffuser, Constant current out put of Driver operating voltage range of 150 to 265 Volts AC, Power factor = 0.9 high power LEDs having efficacy of = 100 lumens/watt, junction temperature less than 85 degrees centigrade and THD is less than 12% etc., complete. MAKE: Phillips / OSRAM / GE / Crompton / VIN / Bajaj / Havells / HPL/ Surya/ Syska.
10 Construction of Office Building of O/o Executive Engineer Item no 718 b pg no 261 of 2019-20 SSR 28.00 Each 1700.00 47600.00
Supply and transportation of 15W back litLED Down Light Recessed / Surface mounting round /square with housing madeofPowdercoatedPressurediecastaluminium housing withextendedheatsink,withProtruded high efficiency diffuser, IP20, with wideoperating voltage range, Power factor > 0.9, Surgeprotection: > 2KV, System efficacy of >100 lumens/watt,CCT: 3000K - 6500K as desired by the department and asper IS, CRI >80, and THD is less than 15% etc.,complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro /Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic/ Halonix / HPL / Syska / Eveready / Surya / Keselec.LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG LEDs. Item no 718 b pg no 261 of 2019-20 SSR
11 Construction of Office Building of O/o Executive Engineer Data 29 8.00 Each 967.00 7736.00
Supply, Transportaton, and fixing of Supply and transportation of 20W, 2000 lumens, 1200mm length T8 LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty. LUMINAIRE MAKE: Phillips / GE / Crompton / Havells LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs ( Data 29)
12 Construction of Office Building of O/o Executive Engineer Data 15 100.00 Rmt 126.00 12600.00
Supply and Run of 2 of 84/0.3mm (6.00 Sq.mm) & 1 of 56/0.3mm (4.00 Sq.mm)FRLS / HFFR PVC insulated flexible ISI mark copper cable of Makes :Polycab / HPL / RPG / Million / Gold Medal in existing pipe for run of mains inlcuding all labour charges etc., complete. (Data 15)
13 Construction of Office Building of O/o Executive Engineer Spl Spn 250.00 Rmt 138.00 34500.00
Supply and Run of 2 of 56/0.3mm (4.00 Sq.mm) & 3 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of Makes : Finolex/ RR Cable/ Havells/ Polycab/ HPL/ RPG/ Power flex / GM / Million / Gold Medal in existing pipe for run of mains inlcuding all labour charges etc., complete.
14 Construction of Office Building of O/o Executive Engineer Data 13 500.00 Rmt 107.00 53500.00
Supply and Run of 3 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of Makes : Polycab / HPL / RPG / Million / Gold Medal in existing pipe for run of mains inlcuding all labour charges etc., complete (Data 13)
15 Construction of Office Building of O/o Executive Engineer Data 19 1.00 Each 8774.00 8774.00
Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 Makes : Legrand / Shneider and Supply and Fixing of 1 No., of 40A FP Isolator as incomer and 12 Nos 6-32 A 10kA SP MCBs Makes : Legrand-DX3 / Schneider-Acti9 as out goings including internal connections and labour charges for FLUSH Mounting etc., complete. (For Lighting DBs) (Data 19)
16 Construction of Office Building of O/o Executive Engineer Item no 334 n pg no 242 of 2019-20 SSR 30.00 Each 450.00 13500.00
Supply and fixing of 2 Module Modular type Electronic Fan Regulator. Item no 334 n pg no 242 of 2019-20 SSR
17 Construction of Office Building of O/o Executive Engineer 4.4.9 4.00 Each 1500.00 6000.00
Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 10/16/20A SP MCB including internal connection and labour charges for surface / flush mounting etc., complete. D no 4.4.9
18 Construction of Office Building of O/o Executive Engineer 2.1.4(B) 50.00 Each 506.00 25300.00
Supply and fixing of modular type 6A 3/2 pin wall plug socket with 6A switch control on a common board of makes Legrand Arteor / MK blenge / Scheider Zen Celo with earth continuity including wire leads, earth connections along with all labour charges etc., complete.D no 2.1.4(B)
19 Construction of Office Building of O/o Executive Engineer 2.1.1(B) 100.00 Pts 665.00 66500.00
Wiring with 2 runs of 14/0.3mm (1.5 Sq.mm) Fire Retardant FRLS P.V.C. insulated 1100v grade as per IS:694/1990 sepacification of flexible copper cable (ISI MARK)of makes Polycab/ Havells/ Suncab / Goldmedal/ million/ Fortune art / Paragon / HPL / L & T / Power flex / RPG / Anchor / Bonton in existing pipe with modular type 6A/10A switch with cover frame and Ceiling rose of makes Legrand Arteor / MK blenge / Schneider Zen Celo & 12 module covering plate of makes Legrand arteor / MK blenge / Schneider zen celo, 12 module metal box to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings .D no 2.1.1(B)
20 Construction of Office Building of O/o Executive Engineer 1.3.1 400.00 Rmt 76.00 30400.00
Supply and Fixing of 20mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) As per IS:9537 part III with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains.of makes Sudhakar / Maco plast / Modi. D no 1.3.1
21 Construction of Office Building of O/o Executive Engineer Spl. Spn 12.00 Each 239.73 2877.00
Supply and fixing of 15mm nominal size PVC connection with brass union nut CP coated including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
22 Construction of Office Building of O/o Executive Engineer Spl. Spn 14.00 Each 227.91 3191.00
Supply and fixing of 4\" Nanhi traps UPVC/SWR with jolly including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
23 Construction of Office Building of O/o Executive Engineer Spl. Spn 1000.00 Ltrs 7.95 7950.00
Providing and placeing on terrach polyethylene water storage tank with double layer Sintex tank manufacture with cover and suitable locking arrangements and making necessar holes for inlet and out lets and over flor pipes including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
24 Construction of Office Building of O/o Executive Engineer Spl. Spn 40.00 Rmt 431.06 17242.00
Supply and fixing of 110mm dia PVC pipe including couplers,bends,tees etc. Including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
25 Construction of Office Building of O/o Executive Engineer Spl. Spn 12.00 Each 254.50 3054.00
Supply and fixing of 12.70mm N.P. bib tap Indian make heavy duty including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
26 Construction of Office Building of O/o Executive Engineer Spl. Spn 14.00 Each 245.41 3436.00
Supply and fixing of 15mm nominal size CP finishbrass angled stop valve including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
27 Construction of Office Building of O/o Executive Engineer Spl. Spn 75.00 Rmt 239.73 17980.00
Supply and fixing of 15mm Nominal bore GI Pipe Medium grade properties and weight as per IS 1239 ISI mark with GI fittings including cost and conveyance of all materials all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
28 Construction of Office Building of O/o Executive Engineer Spl. Spn 100.00 Rmt 385.61 38561.00
Supply and fixing of 25mm Nominal bore GI Pipe Medium grade properties and weight as per IS 1239 ISI mark with GI fittings including cost and conveyance of all materials all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
29 Construction of Office Building of O/o Executive Engineer Spl. Spn 5.00 Each 2704.49 13522.00
Supply and fixing of white glazed flat back half stall usinals of size 440 x 265 x 305mm with standard C.P. Spreader fixed with screws complete indian make conforming to IS-2556-1995 etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
30 Construction of Office Building of O/o Executive Engineer Spl. Spn 5.00 Each 2749.03 13745.00
Supply and fixing of Indian make flat back wash hand basin Ist uality conforming to IS:2556 Part-4:1972 with waste fittings like rubber plug, chain, 32mm nominal size C.P. fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15mm nominal bore chromium plated pillar tap of Ist quality indian make 5400 gramks including CI brackets etc., of size 550 x 400mm single piller cock etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
31 Construction of Office Building of O/o Executive Engineer Spl. Spn 5.00 Each 2657.45 13287.00
Supply and fixing of PVC low level sylsltem parry ware, slim line with internal components and short bed: 10 liters capacity sigle flush including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
32 Construction of Office Building of O/o Executive Engineer Spl. Spn 5.00 Each 878.02 4390.00
Supply and fixing best Indian make plastic soft closing seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
33 Construction of Office Building of O/o Executive Engineer Spl. Spn 5.00 Each 1888.74 9444.00
Supply and fixing of European water closet of Ist quality conforming to IS:2556-part-2-1973 of Hindustan/ Neycer of parryware make white glazed with \'P\' trap including cost and conveayce of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
34 Construction of Office Building of O/o Executive Engineer Spl. Spn 9.00 Each 4353.70 39183.00
Constructing 457.20 mm x 457.20mm brick masonry in CM (1:6) ptop. Indpection chamber up to 914.40 mm and fitted with light weight 457.2mm x 457.22 C.I. Frame and cover of 20Kg. Including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
35 Construction of Office Building of O/o Executive Engineer Spl. Spn 40.00 Rmt 721.62 28865.00
Supplying, laying, jointing and testing 152.4mm SWG SP-1 ppes of ISI make conforming to ISI 651 & 4127 with airtight cement oints in CM (1.5:1) prop. Including excavation of trenches and socket pits in any soils upto a depth of 3\' including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
36 Construction of Office Building of O/o Executive Engineer Spl. Spn 87.75 Sqm 3984.48 349638.00
Supply and fixing of cement Bonded Prelaminated particle Board aluminium glazed partitions using 10mm Cement Bonded prelaminated partical boardand 5.00 mm thick plain glass to full height using with cement bonded prelaminated partical board to a height of 0.91M at bottom pannel and remaining height with glass and aluminium sections of anodized to 12 to 15 microns and of sections size 37mm x 62mm and 1.5mm thickness with one meter centre to centre du;y fixed with clip beeding on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and conveyance of all materials and all labour charges etc., complete as directed during execution
37 Construction of Office Building of O/o Executive Engineer Spl. Spn 328.00 Sqm 826.50 271092.00
Roofing will be provided with 0.5mm thick galvanized /pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape.The sheets are provided with anti capillary grove,Inclusive of all taxes etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
38 Construction of Office Building of O/o Executive Engineer Spl. Spn 453.60 Rmt 455.84 206769.00
Supplying and fixing of 50 x 50 x 2.90 mm MS Plates 300x300x10 including cost and conveyance of all labour charges for fixing the frame the shutter to the frame etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
39 Construction of Office Building of O/o Executive Engineer Spl. Spn 8.00 Each 702.00 5616.00
Supplying and fixing of MS Plates 300x300x10 including cost and conveyance of all labour charges for fixing the frame the shutter to the frame etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
40 Construction of Office Building of O/o Executive Engineer Spl. Spn 1.00 Each 10788.64 10789.00
Supply and Fabrication of 7.55 Mtrs long truss made of 50x50x2.90mm thick MS Square pipe including cost and conveyance of all labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
41 Construction of Office Building of O/o Executive Engineer Spl. Spn 3.00 Each 18557.27 55672.00
Supply and Fabrication of 13.05 Mtrs long truss made of 50x50x2.90mm thick MS Square pipe including cost and conveyance of all labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
42 Construction of Office Building of O/o Executive Engineer Spl. Spn 231.96 Sqm 1060.40 245970.00
Supply and fixing of Gyp board false ceiling with 12.50mm thick gypsum board including cost and conveyance of all materials, all labour charges including all required accessories etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
43 Construction of Office Building of O/o Executive Engineer 1212.0 61.05 10Sqm 1978.61 12079.00
Painting two coats with synthetic enamel paint of 1st grade of approved brand and colour over primary coat including cost and conveyance of all materials labour charges for cleaning, removing the dust, rust and other foreign particles by sand papering including cost of brushes, sand paper, scaffolding charges including all incidental and operational charges etc., complete for finished item of work as per standard specifications and as directed by engineer-in-charge at site.
44 Construction of Office Building of O/o Executive Engineer 1201 & 1216 750.00 Sqm 114.75 86063.00
Painting to new walls with 2 coats of exterior Emulsion Paint over primary coat for internal and external walls of approved brand and shade throughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
45 Construction of Office Building of O/o Executive Engineer Spl. Spn 34.56 Sqm 9130.10 315536.00
Providing & Fixing of Openable windows with fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58mm thick galvanized as per IS 277 finish painted with a polyester paint and the Section for outer frame should be of 72x55mm, centre mullion should be of 72x50mm, Section for fixed glass beading section should be of 12x12mm and section for shutterse of 48x25mm. Outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20mm provision for guard bars/grills. Fly mesh shutter section should be of 20x40mm, stay, seccolor handles, latch 2 Nos of heavy duty stainless steel pivot hinges per Shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade). Rubber Gaskets are provided all around the glass. The above frames should be fixed to the concrete/masonry wall by means of self expanding screws. Including 10mm Square guard bars with 6? (152 4mm) pitch complete for finished item of work
46 Construction of Office Building of O/o Executive Engineer Spl. Spn 22.20 Sqm 5499.17 122082.00
Supply and Fixing doors as per drawings with 2nd class teak wood frame of section 100mmx 65mm and ISI marked flush door shutters of 35mm thick single shutter with bond wood solid block board type with Teak veneer one face and comercial ply on other face ( lipping) core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) including cost and conveyance to site of teak wood frame, flush shutter, MS Z hold fasts of size 300mmx40mmx5mm including cost of IS marked brass fixutures of 3 No\'s but hinges 100mm long, 1 No aldrop 300mm x 16mm dia, 1 No tower bolt of 200mmx12mm dia at top, 1 No heavy duty moterised lock 6/7 levers with brass heavy handles, 1 No heavy duty door stopper and 1 No door closer automatic hyper brand IS-3564 including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc complete for finished item of work. (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm)
47 Construction of Office Building of O/o Executive Engineer 1212.0 472.96 Sqm 116.99 55332.00
White cement based, polymer modified dry mix putty, specially made ot work on levelled, cement sponge finished interior and esterior surfaces, supply and application of two coats of cement based putty including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
48 Construction of Office Building of O/o Executive Engineer Spl. Spn 115.50 Sqm 899.77 103923.00
Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete and overheads & contractors profit complete for finished item of work.
49 Construction of Office Building of O/o Executive Engineer 701 & 707 15.62 Sqm 906.85 14165.00
Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit including etc., complete for finished item of work.( In toilets) (APSS No.701 & 707)
50 Construction of Office Building of O/o Executive Engineer 701 & 707 246.55 Sqm 1207.63 297741.00
Flooring with vitrified tiles of 1st quality and make as approved by Engineer-in-charge 8mm to 10mm thick normal colour with borders and design as per the aproved flooring pattern as directed by the Engineer-in-charge set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
51 Construction of Office Building of O/o Executive Engineer 901 & 903 408.60 10Sqm 5782.20 236261.00
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:5) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc., complete for finished item of work and as per Standard Specification and as directed by the Departmental Engineer-in-charge.
52 Construction of Office Building of O/o Executive Engineer 901 & 903 327.98 10Sqm 5592.58 183425.00
Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc, complete for finished item of work and as per standard specification and as directed by the Engineer-in-charge for finished item of work.
53 Construction of Office Building of O/o Executive Engineer 402 & 403 42.00 Rmt 806.92 33891.00
VRCC M25 grade Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) c) For Sunshades over windows
54 Construction of Office Building of O/o Executive Engineer 402 & 403 1.83 Cum 14605.82 26729.00
VRCC M25 grade Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) b) For Lintels
55 Construction of Office Building of O/o Executive Engineer 402 & 403 7.90 Cum 14867.82 117456.00
VRCC M25 grade Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) a) For Columns
56 Construction of Office Building of O/o Executive Engineer 126.0 0.75 MT 60977.17 45733.00
Providing TMT bars of Fe-500 grade as per IS 1786-1979 of different diameters for RCC works, including labour charges for streightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No. 126) TATA / SAIL / VSP & JINDAL
57 Construction of Office Building of O/o Executive Engineer 402.0 13.44 Cum 5678.28 76316.00
PCC (1:5:10) prop.using 40mm HBG machine crushed metal and unscreened sand including cost and conveyance of all materials to site from approved source, centering machine mixing & vibrating, laying concrete in position, tamping curing for requred period, labour charges for all items all other incidental and operational charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
58 Construction of Office Building of O/o Executive Engineer 501 & 504 76.23 Cum 7454.75 568276.00
Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site including scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.
'

AI Tender Summary

OUR REF NO 22388414
AUTHORITY Cooperative
TENDER VALUE 43.39 Lakhs
LAST DATE 21-11-2019
Authority
Authority Name Agricultural Marketing Department
Work Description Construction Of Office Building Of O/O Executive Engineer (M) Telangana Region And O/O Deputy Executive Engineer, Ranga Reddy District In Mahaboob Mansion Complex, Malakpet Under Amc., Hyderabad Of Hyderabad District.
Basic Detail
Tender No SE(AM)/TS/HYD/Ep/07/06/2019-20
Bidding Type Tender
Location
City HYDERABAD
State Telangana
Key Dates
Publish Date 06 Nov 2019
Submission Date 21 Nov 2019
Open Date 01 Jan 0001
Finance
Tender Value 43.39 Lakhs
Tender Fee Ref. Documents
EMD 43400
Exemption Not Available
Document List
bee1539b-db9b-48b9-bed1-2b8b03190f2a.html
07-06 Tender Document Civil.zip

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 06, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 21, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed

Tender Documents

Download All (ZIP) ↓
html

bee1539b-db9b-48b9-bed1-2b8b03190f2a.html

zip

07-06 Tender Document Civil.zip

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender