| 1 | 1 | Earth work in excavation by mechanical means (hydraulic excavator ) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as10 sqm on plan) inluding getting out and disposal of excavated earth lead upto 50m lift uotp1.5m, as directed by Enginner in charge. | item1 | | |
|---|
| 2 | 1.1 | All Kind of Soil/hard rock | item2 | 5.16 | Cum |
|---|
| 3 | 2 | Providing and laying Plain cement concrete in 1:3:6 (1Cement : 3 Course sand : 6 graded stone aggregate) 40 mm nominal size of approved quality of materials including mixing , laying, Scaffolding,Compacting and Curing etc., including the cost all materials, tools & plants, labours etc. complete. | item3 | 2.05 | Cum |
|---|
| 4 | 3 | providind and Laying cement concrete 1: 1½ :3(1 cement:1½course sand :3stone aggegate 20mmdown gauge) for R.C.C. Works as per drawing,curing including providing cover blocks in CM 1:2 of required thickness complete, supply of all materials, labour, tools and plants, mixing,laying in all levels and consolidation with required vibrator,cost of centering and shuttering ,scaffolding leaving holes and openind wherever required completed as directed and as per drawing excluding reinforcement including supply of all labour,material,tools & plants etc., complete. | item4 | | |
|---|
| 5 | 3.1 | For footing, columns and grade beams below ground level. | item5 | 2.95 | Cum |
|---|
| 6 | 3.2 | Columns above ground level | item6 | 1.28 | Cum |
|---|
| 7 | 3.3 | In Super Structure -Chajja,Cupboard slab,Lintel & Beam | item7 | 1.05 | Cum |
|---|
| 8 | 3.4 | Roof slab of 125 mm thickness | item8 | 1.83 | Cum |
|---|
| 9 | 4 | Providing and laying Reinfocement TMT steel of approved quality ( SAIL / VIZAK / TATA / TISCON ) including the cost of all materials, labours, tools & plants, cutting, bending binding , placing in position steel reinforcement as per drawing and as directed including cost of binding wire etc., complete. | item9 | 782.1 | Kg |
|---|
| 10 | 5 | Construction of C.C block masonry wall & pillar in superstructure of buildings upto floor 2 level in cement mortar of mix 1:5 (1 cement: 5 river sand) with approved size(380mmx230mmx200mm with CC1:3:6), as directed including cost of supply of all labours, materials, tools & plants, scaffolding and all other charges etc. complete. | item10 | 3.66 | Cum |
|---|
| 11 | 6 | 18 mm thick Cement Plastering to CC Block masonry with cement mortar (1 : 4 ) ( 1 cement : 4 sand ) and rackingout joints as directed, including the cost of all materials, labours, tools & plants, scaffolding curing etc., complete. | item11 | 66.27 | Sqm |
|---|
| 12 | 6.1 | 15mm thick Cement Plastering to CC Block masonry with cement mortar (1 : 3) ( 1 cement : 3sand ) and rackingout joints as directed, including the cost of all materials, labours, tools & plants, scaffolding curing etc., complete. | item12 | 33.61 | Sqm |
|---|
| 13 | 7 | Apex ultima two coats over a coat of primer of approved brand and manufacturer and of approved colour on new wall surfaces to give an even shade after throughly brushing the surface free from mortar droppings and other foregin matter,cleaning and also including preparing the surface even sand papered smooth including supply of all materials,tools & plants,labour and all other charges etc., complete. | item13 | 66.27 | Sqm |
|---|
| 14 | 8.1 | Providing & applying white cement based putty of average thicness 1mm ,of approved brand ( birla white/JK Cement) or any approved brand and manufuctures over the plastered wall surface to preper the surface even and good for smooth with applying putty over one coat primer of Inspection Quarter with approved brand after preparing the surface good for applying the primer as directed & as described as per condition at site including the cost of all materials, labours, tools & plants , scaffolding etc., complete. | item14 | 33.61 | Sqm |
|---|
| 15 | 8.2 | Applying two coats of Distempering on the inside painted wall surfaces with oil bound washable distemper of approved quality (Berger / Asian brand or equivalent of 1st quality) & colour , even shade with a coat of primer wherever required at all heights and as directed & as described as per condition at site after cleaning and preparing the surface good for distempering including the cost of all materials ,labour ,tools & plants , scaffolding etc., complete. | item15 | 33.61 | Sqm |
|---|
| 16 | 9 | Filling the available Morrum inside the plinth & foundation and as directed in depth consolidating each deposited layers by ramming and watering, lead up to 50m and in all heights including the cost of labours, tools & plants and all other charges etc complete as directed. | item16 | 1.88 | Cum |
|---|
| 17 | 10 | Filling the available Sand inside the plinth & foundation and as directed in depth consolidating each deposited layers by ramming and watering, lead up to 50m and in all heights including the cost of labours, tools & plants and all other charges etc complete as directed. | item17 | 1.25 | Cum |
|---|
| 18 | 11 | Providing & laying 1st quality ceramic-vetrified floor/skirting tiles of size 600x600x10mm thickness for flooring of approved make like NITCO, Orient, Somany, Kajaria ,bell etc.Conforming to IS of apprved colours as white, ivory,grey, fume red brown laid on 20mm thick bed cement mortar( CM) 1:4 for foor tiles and 12mm thick bed of cement mortar( CM) 1:3 ( 1 cement : 3 coarse sand) for dado tiles, Including jointing with white cement mixed with pigment of of matching shade complete. | item18 | 7.25 | Sqm |
|---|
| 19 | 12 | Providing & laying prepolished granite stone on the old flooring 20mm(ovg) thick of approved quality & colour laid over a bed of CM 1:3 (1 cement: 3 River sand) of thickness 20mm(avg) pointing with white cement slurry after removal of existing floring including the cost of Replastering in CM 1:3, rubbing, polishing, washing, cutting, laying, fixing, leveling, maintaining gradient jointing, after removing the old flooring & preparing the surface fof providing granient jointing, after removing the old flooring & preparing the surface for providing granite stone etc. as directed & as described as per condition at site including the cost of all materials, labours tools & plants and all other charges etc. complete. | item19 | 13.86 | Sqm |
|---|
| 20 | 13 | Providing and fixing 35 mm thick factory made laminated veneer lumber door shutter conforming to IS : 14616 and TADS 15:2001 (Part B) including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, all complete as per directions of Engineer-in-charge and panelling with panels, as directed & as described as per condition at site including the cost of all materials, labours tools & plants and all other charges etc. complete. | item20 | 1.89 | Sqm |
|---|
| 21 | 14 | Providing and fixing window having extruded alluminium colour power coated section frame main outer size 63.50X38.10X1.95 mm (jindal Section No.4605 @ wt 1.094 kg/Rmt) horizontal Two Track member size 61.85mm X31.75mm X1.20mm (of Jindal section No. 8758 @ Wt. 0.659 Kg/ mt) with sliding shutters of Horizontal member size 40mm X18mm X1.29 mm(of Jindal section No.8949 @wt. of 0.456 kg./mt) vertical member of size 40mm X18mm X1.29 mm( of Jindal section No. 8947 @wt.of 0.456 kg/mt,/ section 8948 @Wt.bronze colour tinted float glass with powder coated alluminium fitting and fixtures and transparent silicon sealant glass fixing to frames as per detail etc. | item21 | | |
|---|
| 22 | 14.1 | Fram main member (63.50x38.10x1.95mm) | item22 | 17.66 | Kg |
|---|
| 23 | 14.2 | Shutter (40mmx18mmx1.29mm) | item23 | 12.97 | Kg |
|---|
| 24 | 14.3 | float glass panes 5.50mmthicness | item24 | 5.4 | Sqm |
|---|
| 25 | 15 | Providing 16mm dia Mild steel rods/Grill to the window frame as directed including cutting the bars to suitable length, straighting, drilling holes in the wooden frame and fixing the rods in line and level(100mmC/C) etc complete including cost of all matierials, labour, tools and plants etc complete as directed. | item25 | 135 | Kg |
|---|
| 26 | 16 | S.E. Painting with two coats to MS grill for all heights with approved paints of first quality and colour after removing worm out cement by scapping and applying one coat of zinc chromate as directed at site, including the cost of all materials, labours, tools & plants, necessary safty belt etc complete | item26 | 9.72 | Sqm |
|---|
| 27 | 17 | Consilied Wiring for light point /fan point with finolex make 1.5sq.mm FRLS PVC insulated copper conductor single core in surface / recessed medium class preceision make PVC conduct , with modular switch , modular plate, suitable GI box and earthing the point with 1.5sq.mm. FRLS PVC insulated copper conductor single core cable,fan, light fittings, wiring work etc as require. | item27 | 1 | Each |
|---|