Design , Manufacture , Supply , Inspection , Testing And Commissioning Of Helicopter Refueling System Alongwith Obs And Documentation For Yard 12704 , 12705 , 12706 And 12707 Of P15b Ships
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Dec 2019
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Vendor Enlistment
Location / State
MDL, Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Design , Manufacture , Supply , Inspection , Testing And Commissioning Of Helicopter Refueling System Alongwith Obs And Documentation For Yard 12704 , 12705 , 12706 And 12707 Of P15b Ships
BOQ
| Name of Work: Helicopter Refuelling System for Yard 12704, 12705,12706 & 12707 of Project P15B | |||||
|---|---|---|---|---|---|
| Tender Sl.No. | Item Description (Material No.) | LINE ITEM NO AS PER TEF | QTY | Unit | |
| 1 | 10 | HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881) | 100 | 1 | SET |
| 2 | 20 | ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No:150000000000054262) | 200 | 1 | SET |
| 3 | 30 | DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265) | 300 | 1 | SET |
| 4 | 40 | Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs | 400 | 1 | AU |
| 5 | 50 | Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit. | 500 | 1 | AU |
| 6 | 60 | Base & Depot Spares | 600 | 1 | SET |
| 7 | 70 | HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881) | 700 | 1 | SET |
| 8 | 80 | ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No: 150000000000054262) | 800 | 1 | SET |
| 9 | 90 | DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265) | 900 | 1 | SET |
| 10 | 100 | Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs | 1000 | 1 | AU |
| 11 | 110 | Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit. | 1100 | 1 | AU |
| 12 | 120 | HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881) | 1200 | 1 | SET |
| 13 | 130 | ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No: 150000000000054262) | 1300 | 1 | SET |
| 14 | 140 | DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265) | 1400 | 1 | SET |
| 15 | 150 | Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs | 1500 | 1 | AU |
| 16 | 160 | Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit. | 1600 | 1 | AU |
| 17 | 170 | HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881) | 1700 | 1 | SET |
| 18 | 180 | ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No: 150000000000054262) | 1800 | 1 | SET |
| 19 | 190 | DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265) | 1900 | 1 | SET |
| 20 | 200 | Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs | 2000 | 1 | AU |
| 21 | 210 | Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit. | 2100 | 1 | AU |
| 22 | 220 | Price escalation rates of B&D spares in % of quoted basic prices of B&D spares on per annum basis for the period of 5 years | |||
| 23 | 230 | Delivery Postponement charges in percentage of (main equipment, documentation, OBS) on per annum basis of total basic price (excluding services & taxes) (for Y-12706 & Y-12707 only) | |||
| 24 | 240 | Reduction in prices in percentage (of main equipment, documentation, OBS) of total basic price on per annum basis of total basic price (excluding services & taxes) (for Y-12706 & Y-12707 only) towards advancement of delivery | |||
| 25 | 250 | Warranty/ guarantee Extention charges in percentage on per annum basis of total basic price (excluding services, Documentation taxes& duties) | |||
| 26 | 260 | Re-Preservation charges in percentage of total basic price of main equipment on per annum basis for 12 months |
AI Tender Summary
Tender Timeline
Nov 05, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedDec 04, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 06, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender