Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 0 days TDR #22373565

Design , Manufacture , Supply , Inspection , Testing And Commissioning Of Helicopter Refueling System Alongwith Obs And Documentation For Yard 12704 , 12705 , 12706 And 12707 Of P15b Ships

Issued by Boards / Undertakings / PSU · MDL, Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Dec 2019
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Vendor Enlistment
Location / State
MDL, Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Design , Manufacture , Supply , Inspection , Testing And Commissioning Of Helicopter Refueling System Alongwith Obs And Documentation For Yard 12704 , 12705 , 12706 And 12707 Of P15b Ships

BOQ

Name of Work: Helicopter Refuelling System for Yard 12704, 12705,12706 & 12707 of Project P15B
Tender Sl.No.Item Description (Material No.)LINE ITEM NO AS PER TEFQTYUnit
110HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881)1001SET
220ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No:150000000000054262)2001SET
330DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265)3001SET
440Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs4001AU
550Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit.5001AU
660Base & Depot Spares6001SET
770HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881)7001SET
880ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No: 150000000000054262)8001SET
990DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265)9001SET
10100Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs10001AU
11110Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit.11001AU
12120HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881)12001SET
13130ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No: 150000000000054262)13001SET
14140DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265)14001SET
15150Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs15001AU
16160Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit.16001AU
17170HELO INFLIGHT FUELLING RIG (HIFR) SYSTEM CONSISTS OF THE FOLLOWING\nASSEMBLIES:\n1) Lower Automatic Breakaway Coupling with a breaking point according to STANAG 3847 - 1No.\n2) Long Hose 50 mm NB (approximately 30m long) EN 1361 type TW (with end connections) - 1No.\n3) Hose end pressure controller with strainer and dust cap - 1No.\n4) Upper Automatic Breakaway Coupling with a breaking point according to STANAG 3847 (if required as per design) - 1No.\n5) Swivel Pieces -As required\n6) Short Hose (3 mtrs) EN 1361 type E (with-end connections) - 1No.\n7) Aircraft Coupling - 1No.\n8) Lower deck coupling (if required) - 1 set\n9) Upper elbow with suitable shackle point for winch connection - 1No.\n10) Lower elbow tie-down with shackles and tie-down stainless-steel strop - 1No.\n11) Test Kit for checking break force - 1No.\n12) Hooks for securing the hose to the aircraft, bonding assemblies {Compliant to STANAG 3682). unions and protective covers - As required\n13) Hose Reel - 1 No.\n14) Trigger/ Refuelling Nozzle( 1 ½”)- 2 No\n15) Defueling Nozzle /Tube ( 1 ½” ) -2 No\n16) Fuel Flow Meter - 1 No.\n(Material No: 150000000000057881)17001SET
18180ON BOARD SPARES FOR ONE YEAR EXPLOITATION OF HELO INFLIGHT FUELLING RIG (HIFR). \n(Material No: 150000000000054262)18001SET
19190DOCUMENTATION FOR HELO INFLIGHT FUELLING RIG (HIFR) AS PER ATTACHED TSP \n(Material No: 150000000000054265)19001SET
20200Services -> DETAILS AS BELOW\nServices\nThe manufacturer is required to provide the necessary representative(s)(mechanical &electrical) to assist in carrying out inspection and supervise the work that is done on the equipment, during the following phases in addition to installation work covered as scope:\ni. On-board erection and connections\nii. Setting to work\niii. Harbour and sea trials\niv. Final machinery trials\nv. Inspections on completion of CSTs20001AU
21210Training -> DETAILS AS BELOW\nTraining\nComplete training/familiarization/know how package for on board exploitation and maintenance of equipment/supplies at various levels in marine industry is to be formulated and offered. The supplier shall also formulate and provide all necessary training documents, charts and models mock-up for ship staff and shore support personnel.\nCommissioning training/familiarization is to be imparted at the operator level and maintainer level for on-board exploitation and maintenance along with tools and kit.21001AU
22220Price escalation rates of B&D spares in % of quoted basic prices of B&D spares on per annum basis for the period of 5 years
23230Delivery Postponement charges in percentage of (main equipment, documentation, OBS) on per annum basis of total basic price (excluding services & taxes) (for Y-12706 & Y-12707 only)
24240Reduction in prices in percentage (of main equipment, documentation, OBS) of total basic price on per annum basis of total basic price (excluding services & taxes) (for Y-12706 & Y-12707 only) towards advancement of delivery
25250Warranty/ guarantee Extention charges in percentage on per annum basis of total basic price (excluding services, Documentation taxes& duties)
26260Re-Preservation charges in percentage of total basic price of main equipment on per annum basis for 12 months

AI Tender Summary

OUR REF NO 22373565
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 04-12-2019
Authority
Authority Name Mazagon Dock Limited
Work Description Design , Manufacture , Supply , Inspection , Testing And Commissioning Of Helicopter Refueling System Alongwith Obs And Documentation For Yard 12704 , 12705 , 12706 And 12707 Of P15b Ships
Basic Detail
Tender No 1600000812
Bidding Type Vendor Enlistment
Location
City MDL, Mumbai
State Maharashtra
Key Dates
Publish Date 05 Nov 2019
Submission Date 04 Dec 2019
Open Date 06 Dec 2019
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
812.rar
BOQ_88829.xls
Tendernotice_1.pdf
E670422C-4AF8-4A3B-BE75-D47BF765DFB3.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 05, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 04, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 06, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
rar

812.rar

xls

BOQ_88829.xls

pdf

Tendernotice_1.pdf

html

E670422C-4AF8-4A3B-BE75-D47BF765DFB3.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders