Supply Erection Testing And Commissioning Of 29 Nos Of 6 Mt Street Lamp Post And Supply Fixing Maintenance And Replacement Guarantee For 7 Years Of Led Fittings Complete Set At Various Location In Dn 183 184 185 186 Z 14
Tender Overview
Project Description
Supply Erection Testing And Commissioning Of 29 Nos Of 6 Mt Street Lamp Post And Supply Fixing Maintenance And Replacement Guarantee For 7 Years Of Led Fittings Complete Set At Various Location In Dn 183 184 185 186 Z 14
BOQ
| Name of Work: Supply, Installation and Commissioning of 29 Nos of street light lamp post with LED fittings in the left over areas in Divisions – 183,184,185,186 and 188, Zone -14. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Cost of supply of ISI marked 6 mtr long mild steel street lamp post with MS Single straight bracket as per the specification | 22 | Nos | |
| 2 | 2 | Cost of supply of ISI marked 6 mtr long mild steel street lamp post with MS Single straight bracket as per the specification (4 Core fuse Box)\n | 5 | Nos | |
| 3 | 3 | Cost of supply of ISI marked 6 mtr long mild steel street lamp post with MS Single Arch bracket as per the specification \n | 2 | Nos | |
| 4 | 4 | Cost of Supply fixing and maintenance of LED fitting of 40 W to 50 W | 22 | Nos | |
| 5 | 5 | Supply fixing and maintenance of LED fitting of 90 W to 120 W with 7 years replacement guarantee (in place of 150 W SVL). \n | 7 | Nos | |
| 6 | 6 | Cost of supply of ISI marked 2 core x 16 sq.mmUG Cable | 822 | Mtrs | |
| 7 | 7 | Cost of supply of ISI marked 4 core x 16 sq.mmUG Cable | 232 | Mtrs | |
| 8 | 8 | Cost of supply of ISI marked 3 ½ core x 25 sq.mm UG Cable | 81 | Mtrs | |
| 9 | 9 | Cost of Supply of ISI marked HDPE plain pipe | 808 | Mtrs | |
| 10 | 10 | Cost of supply of Double wall corregated duct 120/103.5mm - Orange or Blue colour ( to be used instead of HUME Pipe) | 52 | Mtrs | |
| 11 | 11 | Cost of supply of \"KIOSK\" pillar box | 3 | Nos | |
| 12 | 12 | Cost of supply of 63 Amp / 3 Phase MIROPROCESSOR BASED digital ON / OFF Timer unit \n | 3 | Nos | |
| 13 | 13 | Cost of Erection of 6 Mtr. Long street lamp posts including fixing of SINGLE STRAIGHT BRACKET as per specification | 27 | Nos | |
| 14 | 14 | Cost of Erection of 6 Mtr. Long street lamp posts including fixing of SINGLE ARCH BRACKET as per specification | 2 | Nos | |
| 15 | 15 | Cost of Laying of 2/4 core x 16/25 sq.mm. aluminimum underground cable through HDPE pipe as per specification. | 710 | Mtrs | |
| 16 | 16 | Labour for laying of cable through HDPE pipe ( 50 mm OD ) in plain cement concrete road | 98 | Mtrs | |
| 17 | 17 | Cutting of road, excavation of earth laying of Road cross pipe drawl of cable | 52 | Mtrs | |
| 18 | 18 | Cost of Erection of KIOSK PILLAR BOX | 3 | Nos | |
| 19 | 19 | Cost of Erection of TIMER Unit | 3 | Nos | |
| 20 | 20 | MATERIAL AND LABOUR FOR NUMBERING OF STREET LAMP\nPOST\n | 29 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender