}

Bw 2018 - 19 Improvement Works To Elamkadu -Mukkulam - Madammakkulam Gsb Wmm Bm Bc Construction Of Drain Side Protection Work And Traffic Safety Works . , PEERUMEDE-Kerala

Public Works Department-PWD has published Bw 2018 - 19 Improvement Works To Elamkadu -Mukkulam - Madammakkulam Gsb Wmm Bm Bc Construction Of Drain Side Protection Work And Traffic Safety Works . . Submission Date for this Tender is 15-11-2019. Flood Protection Tenders in PEERUMEDE Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

22340112
Bw 2018 - 19 Improvement Works To Elamkadu -Mukkulam - Madammakkulam Gsb Wmm Bm Bc Construction Of Drain Side Protection Work And Traffic Safety Works .
Open Tender
Indian
Kerala
PEERUMEDE
15-11-2019

Tender Details

Bw 2018 - 19 Improvement Works To Elamkadu -Mukkulam - Madammakkulam Gsb Wmm Bm Bc Construction Of Drain Side Protection Work And Traffic Safety Works .

Key Value

Document Fees
INR 9759 /-
EMD
INR 100000.0 /-
Tender Value
INR 2.23 Crore /-

BOQ Items

Work Name:BW 2018 - 19 Improvement works to Elamkadu -Mukkulam - Madammakkulam road km . 6/000 to 8/000
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Road work BI01010001010000000000000515BI0100001113
2 1.01 3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m BI01010001010000000000000515BI0100001114 27383.5 cum
3 1.02 3.7 : Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. BI01010001010000000000000515BI0100001115 3042.61 cum
4 1.03 3.9 : Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metresExcavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres BI01010001010000000000000515BI0100001116 766.625 cum
5 1.04 2.2 : Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the areaClearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area BI01010001010000000000000515BI0100001117 1 Hecter
6 1.05 od46377/2018_2019 : Dry Rubble packing :<br>Construction of dry rubble packing at marshy areas. (using stone at site) BI01010001010000000000000515BI0100001118 128 cum
7 1.06 3.24.A : Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)<br>Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) BI01010001010000000000000515BI0100001119 500 metre
8 1.07 3.19.1 : Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction.Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction. BI01010001010000000000000515BI0100001120 2400 cum
9 1.08 4.1.A.1 : Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 <br>\n Grading-I - Plant Mix MethodConstruction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method BI01010001010000000000000515BI0100001121 744.588 cum
10 1.09 4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. BI01010001010000000000000515BI0100001122 753.92 cum
11 1.1 5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. BI01010001010000000000000515BI0100001123 5418 sqm
12 1.11 5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. BI01010001010000000000000515BI0100001124 5418 sqm
13 1.12 od25238/2019_2020 : Providing 40mm premixed chipping carpet over BT surface with departmental broken stones after thoroughly cleaning the base with wire brushes, brooms and applying a coat of hot bitumen @2.5 kg per 10m2 and spreading the hot premix of 0.32m3 of 24mm, 0.22m3 of 12mm of departmental metal mixed with 22.08kg of bitumen per 10m2, rolling to dense surface, then spreading the seal coat comprising 0.09m3 of 6mm metal mixed with 8.6kg of bitumen per 10m2 and rolling again including cost of bitumen, fuel, hire charges of machineries etc complete. (Total usage of bitumen 33.22kg per 10m2) BI01010001010000000000000515BI0100001125 5418 sqm
14 1.13 od25239/2019_2020 : Supplying and stacking 24mm size hard broken stone in standard heaps for measurement. BI01010001010000000000000515BI0100001126 173.376 cum
15 1.14 55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) BI01010001010000000000000515BI0100001127 119.196 cum
16 1.15 55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) BI01010001010000000000000515BI0100001128 48.762 cum
17 1.16 8.4.12 : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.<br>\n50cmx 60 cm rectangular (Single chevron etc.)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.50cmx 60 cm rectangular (Single chevron etc.) BI01010001010000000000000515BI0100001129 16 each
18 1.17 8.15 : Supplying and installation of delineator (Road way indicators) posts 80- 100cm high above ground level, pained black and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorised panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)Supplying and installation of delineator (Road way indicators) posts 80- 100cm high above ground level, pained black and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorised panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification) BI01010001010000000000000515BI0100001130 120 each
19 1.18 12.8.A : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br>\n PCC Grade M15 ( Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork) BI01010001010000000000000515BI0100001131 4.86 cum
20 1.19 8.23.A : Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3 <br>Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3 BI01010001010000000000000515BI0100001132 360 metre
21 2 PROTECTION WORK BI01010001010000000000000515BI0100001133
22 2.01 12.1.A.2 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br>\nOrdinary soil - Depth 3 m to 6 m - Manual Means<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil - Depth 3 m to 6 m - Manual Means BI01010001010000000000000515BI0100001134 199.3 cum
23 2.02 12.1.B.2 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. <br>\nOrdinary Soil - Depth 3 M to 6 M- Mechanical Means<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means BI01010001010000000000000515BI0100001135 433.2 cum
24 2.03 od25237/2019_2020 : Providing DOWEL BARS of 120cm long, 20mm dia Tor steel, boring 60cm deep hole. BI01010001010000000000000515BI0100001136 395 each
25 2.04 12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. BI01010001010000000000000515BI0100001137 77.4 cum
26 2.05 12.8.B.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br>\n PCC Grade M20<br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 BI01010001010000000000000515BI0100001138 157.6 cum
27 2.06 12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br>\nPCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 BI01010001010000000000000515BI0100001139 15 cum
28 2.07 od31227/2018_2019 : Dry rubble masonry using departmental rubble at site as per drawings anddirections of departmental staff etc. complete. BI01010001010000000000000515BI0100001140 990.475 cum
29 2.08 12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br>\n RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer BI01010001010000000000000515BI0100001141 38.85 cum
30 2.09 13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications BI01010001010000000000000515BI0100001142 3.807 MT
31 2.1 8.16 : Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting . BI01010001010000000000000515BI0100001143 132 no
32 2.11 8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces BI01010001010000000000000515BI0100001144 153.641 sqm
33 3 Drains and Culverts BI01010001010000000000000515BI0100001145
34 3.01 3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m BI01010001010000000000000515BI0100001146 498.5 cum
35 3.02 4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. BI01010001010000000000000515BI0100001147 94 cum
36 3.03 12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br>\nOrdinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means BI01010001010000000000000515BI0100001148 489.016 cum
37 3.04 12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. BI01010001010000000000000515BI0100001149 444.7 cum
38 3.05 od25237/2019_2020 : Providing DOWEL BARS of 120cm long, 20mm dia Tor steel, boring 60cm deep hole. BI01010001010000000000000515BI0100001150 75 each
39 3.06 12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br>\nPCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 BI01010001010000000000000515BI0100001151 133.681 cum
40 3.07 13.5.A : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br>\n PCC Grade M15 - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m BI01010001010000000000000515BI0100001152 73.2 cum
41 3.08 od25236/2019_2020 : 110mm dia PVC pipe for abutment and wings weep holes, including all cost and conveyance of all materials and all labour charges etc. complete complying to standard specification and direction of departmental officers at site. BI01010001010000000000000515BI0100001153 190 metre
42 3.09 12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br>\n RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) BI01010001010000000000000515BI0100001154 166.601 cum
43 3.1 12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br>\n RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer BI01010001010000000000000515BI0100001155 1.12 cum
44 3.11 12.8.E.1.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br>\n RCC Grade M25 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 - Using Concrete Mixer BI01010001010000000000000515BI0100001156 12.8 cum
45 3.12 12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications BI01010001010000000000000515BI0100001157 1.348 MT
46 3.13 8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces BI01010001010000000000000515BI0100001158 7.76 sqm
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail