| 1 | 1 | Hiring of HEMM for excavating all kinds of strata /overburden/in situ, loading in to tippers, transportation and unloading of excavated materials & silt, dumping, dozing, scrapping /removal of all bands, preparation/ maintenance of haul road, water sprinkling and spreading of material at the site shown and as per directives of the Management /Engineer–in-Charge at Gare Pelma IV/2&3 OCM, Raigarh Area for a total quantity of 92,99,099.00 Cum (Soft soil +Hard Strata) with minimum quantity 22,040 cu.m per day \n\n | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | A. Soft Soil (Not requiring Drilling) above X Seam/ XA Seam Total Quantity 10,82,743 Cum, Min. Lead – 1.48 km Max. Lead- 2.767 km, Min. Lift – 4.00 m, Max Lift – 14.00 m | BI01010001010000000000000515BI0100001113 | | |
|---|
| 3 | 1.02 | (A1) Lead Slab 1-2 km, Minimum Lead 1.48 km, Maximum Lead 2.00 km, Average Lead 1.74 km, Total Quantity 4,38,315 Cum ( Route No 1 & Dump No1) | BI01010001010000000000000515BI0100001114 | 438315 | Cum |
|---|
| 4 | 1.03 | (A2) Lead Slab 2-3 km, Minimum lead 2.00 km, Maximum Lead 2.767 km, Average Lead 2.384 Km, Total Quantity 6,44,428 Cum (Route No. 1 & Dump No 1)\n\n | BI01010001010000000000000515BI0100001115 | 644428 | Cum |
|---|
| 5 | 2 | B. Hard Strata (Requiring Drilling in all kind of strata / OB/ insitu) above X/ A Seam (excluding Soft soil) and Parting between X Seam, & XA Seam XA & IX Seam, IX seam & VIII Seam and VIII Seam & VII Seam for a total quantity of 82,16,356 Cum with Minimum Lead 0.100 km, Maximum Lead 3.996 km, Min. Lift 0.00 m, Max Lift 104.00 m at Dump No 2 & Dump No 3 using Route No. 2,3 & 4 | BI01010001010000000000000515BI0100001116 | | |
|---|
| 6 | 2.01 | (B1) PATCH A - Lead Slab 0-1 km, Minimum lead 0.100 km, Maximum Lead 1.00 km, Average Lead - 0.550 km, Total Quantity: 6,93,796 Cum ( Route No. 2 & Dump No 2)\n \n | BI01010001010000000000000515BI0100001127 | 693796 | Cum |
|---|
| 7 | 2.02 | (B2)PATCH B - Lead Slab 0-1 km, Minimum lead 0.100 km, Maximum Lead 1.00 km, Average Lead - 0.550 km, Total Quantity: 11, 13,341 Cum ( Route No. 4 & Dump No 3)\n \n | BI01010001010000000000000515BI0100001128 | 1.11334e+06 | Cum |
|---|
| 8 | 2.03 | (B3)PATCH A - Lead Slab 1-2 km, Minimum lead 1.00 km, Maximum Lead 1.566 km, Average Lead – 1.283 km, Total Quantity: 4,36,763 Cum ( Route No. 2 & Dump No 2)\n \n | BI01010001010000000000000515BI0100001129 | 436763 | Cum |
|---|
| 9 | 2.04 | (B4) PATCH B - Lead Slab 1-2 km, Minimum lead 1.00 km, Maximum Lead 1.843 km, Average Lead – 1.422 km, Total Quantity: 10,43,633 Cum ( Route No. 4 & Dump No 3)\n \n | BI01010001010000000000000515BI0100001130 | 1.04363e+06 | Cum |
|---|
| 10 | 2.05 | (B5) PATCH A - Lead Slab 2-3 km, Minimum lead 2.00 km, Maximum Lead 3.00 km, Average Lead – 2.50 km, Total Quantity: 24,69,244 Cum ( Route No. 3 & Dump No 3)\n \n | BI01010001010000000000000515BI0100001131 | 2.46924e+06 | Cum |
|---|
| 11 | 2.06 | (B6) PATCH A - Lead Slab 3-4 km, Minimum lead 3.00 km, Maximum Lead 3.996 km, Average Lead – 3.498 km, Total Quantity: 24,59,579 Cum ( Route No. 3 & Dump No 3)\n | BI01010001010000000000000515BI0100001132 | 2.45958e+06 | Cum |
|---|
| 12 | 3 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001133 | 1 | Nos |
|---|