| 1 | 1 | PART-A (CIVIL WORKS)\nDismentalling brick or stone masonary in lime or cement mortar under 3 mtr height including stacking the useful materials for re-use and removing the debries from site with all leads as directed by the Engineer-in-charge including all labour and T&P required for the work etc. including labour cess but excluding GST complete | | 32.32 | Cum |
|---|
| 2 | 2 | Dismantling and removing R.C.C. columns, beams, slab, staircase, landing, lintels including stacking the useful materials for reuse and removing the debries within 50m lead. including labour cess but excluding GST as per direction of the Engineer-in-charge | | 2.06 | Cum |
|---|
| 3 | 3 | Dismantling G.C.I. or A.C. sheet roofing after careful removal of the bolts and nuts including stacking of the useful materials for re-use and removing the debries from work site with all leads and lifts as directed by the Engineer-in-charge including all labour and T&P required for the work etc. including labour cess but excluding GST complete | | 24.04 | Sqm |
|---|
| 4 | 4 | \nEarth work excavation of foundation trenches in hard soil within 50m initial lead and 1.5m initial lift including rough dressing breaking clods to maximum 5cm to 7cm and laying in layers not to exceeding 0.3m in depth including removal of stumps, roots, shrubs and other foreign debries from the cut surface including basic cost, conveyance all T&P and cost of all labour as required for the work etc. including labour cess but excluding GST complete as per direction of Engineer-in-charge | | 83.69 | Cum |
|---|
| 5 | 5 | Supplying and filling foundation and plinth with sand in layers not exceeding 150 mm thick well watered and rammed with basic cost, conveyance, royalities and of all materials, labour, T&P required including labour cess but excluding GST for the work etc. including labour cess but excluding GST complete (Measurement to be taken on compacted section only) | | 38.77 | Cum |
|---|
| 6 | 6 | Cement concrete (1:4:8) in foundation and floor i;e below the base course of terrazo flooring using 4cm (1½\") size black crusher / hand broken granite aggregates of approved quality and from approved quarry, including lowering, laying concrete, watering curing etc. complete to required level laid in layers not exceeding 1'-6\" thick including basic cost, conveyance, royalities of all materials and cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge | | 16.82 | Cum |
|---|
| 7 | 7 | Providing P.C.C. M-20 in base course of the concrete pavement by using 20mm & down graded size black hard crusher broken granite aggregates of approved quality and from approved quarry including lowering, laying, concrete, compacting with mechanical vibrator, watering, curing, centering & shuttering etc. complete to required level laid in layers including basic cost, conveyance, royalities of all materials and cost of all labour required for the work etc. including labour cess but excluding GST complete in all respect as per direction of the Engineer-in-charge | | 17.76 | Cum |
|---|
| 8 | 8 | RCC M20 having compressive strength of 20mpa, target mean strength of 30mpa, for150mm cubes at 28 days curing as per IS-456-2000 & I.R.C-212000 test conducted in accordance with I.S. 516 using 20mm & down graded size crusher broken hard granite coarse aggregate of approved quality and from approved quarry & other materials as per section 302 of I.R.C.21-2000 & IS-456-2000 of approved quality including centering, shuttering & form works for providing smooth & water tight surface, hoisting, lowering & laying concrete in layers not exceeding 30 cm. compacted thickness, compacting with mechanical vibrators true to lines, grades as per drawing & technical specifications, watering & curing for 28 days including basic cost, conveyance, royalties of all materials with all leads & lift, cost of all labour T&P, including labour cess but excluding GST & equipment required for mixing, transporting & placing in position vibrating, compacting, finishing & curing including all incidental expenses complete in all respect as per direction of the E.I.C. but excluding the cost of M.S. rods or Tor steel and binding wire & labour charges for bending binding & tying the grills \nColumn base | | 4.9 | Cum |
|---|
| 9 | 8.01 | Grade beam | | 0.97 | Cum |
|---|
| 10 | 8.02 | Column super structure | | 3.45 | Cum |
|---|
| 11 | 8.03 | Beam | | 1.03 | Cum |
|---|
| 12 | 8.04 | Fin (3\" thickness) | | 2.32 | Sqm |
|---|
| 13 | 8.05 | Slab | | 1.34 | Cum |
|---|
| 14 | 9 | Fly ash brick masonry in cement mortar (1:6) using 25x12 x8cm size bricks after immersing the bricks for six hours in water before use in Foundation and Plinth including, splays cutting, circular moulding and carbelling, champhering and similar such type of works watering, curing etc. all complete including bsic cost, conveyance, royalties of all materials and cost of all labour, and T&P required for the work etc. including labour cess but excluding GST complete (Crushing strength of bricks should not be less than 75kg to 99 kg/cm2 with dimensional tolerance ±2%) | | 13.45 | Cum |
|---|
| 15 | 10 | Fly ash brick masonry in cement mortar (1:6) using 25x12 x8cm size bricks after immersing the bricks for six hours in water before use in Super Structure including, splays cutting, circular moulding and carbelling, champhering and similar such type of works watering, curing etc. all complete including bsic cost, conveyance, royalties of all materials and cost of all labour, and T&P required for the work etc. including labour cess but excluding GST complete (Crushing strength of bricks should not be less than 75kg to 99 kg/cm2 with dimensional tolerance ±2%) | | 28.94 | Cum |
|---|
| 16 | 11 | 16mm (5/8\") thick cement plaster (1:6) over brick masonary finished smooth, after racking out the joints including watering and curing etc. with basic cost, conveyance, royalities of all materials and cost of all labour and T&P required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge | | 180.2 | Sqm |
|---|
| 17 | 12 | 12mm (½\") thick cement plaster (1:6) over brick masonry finished smooth, after racking out the joints including watering and curing etc. with basic cost, conveyance, royalties of all materials and cost of all labour and T&P required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge | | 182.66 | Sqm |
|---|
| 18 | 13 | Cutting, straightening the bent up M.S. Rods or Tor steel, using SAIL / TATA / RINL (grade Fe 5OOD} / JINDAL STEEL / SHYAM STEEL etc. including bending, binding, welding joining if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting, lowering, laying including basic cost, conveyance of all M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work including labour cess but excluding GST bending, binding and tying the grills in all floors (Payment will be made on weight of M.S. Rods or Tor steel only and no separate payment will be made towards the weight of binding wires) | | 14.23 | Qntl |
|---|
| 19 | 14 | Supplying, fitting and fixing window M.S. grills, grill gates made of M.S. flat/square bar of approved specification design fitted & fixed including cutting the grooves in brick or RCC structure and making good to the damages with C.C. (1:2:4), cost of nails, screws but including basic cost of grills, conveyance, of all materials, labour, T&P. etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge | | 337.5 | Kg |
|---|
| 20 | 15 | Supplying fitting, fixing M.S. angular frame of size 40x40x6mm for ceiling incluidng cutting welding, errecting, one coat priming, basic cost, conveyance of all materials, cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as directed by the Engineer-in-charge | | 119.33 | Kg |
|---|
| 21 | 16 | Supplying, fitting and fixing Dura shine. sheet (0.50 mm thick) in roof including drilling holes in windties fixing of ridges valley windties etc. including labour cess but excluding GST complete including basic cost of fittings, all labour & T&P. required for the work etc. including labour cess but excluding GST complete (cost of windties will paid separately) as per direction of the Engineer-in-charge | | 27.59 | Sqm |
|---|
| 22 | 17 | 2.5cm (1\") av. thick A.S. flooring with cement concrete of proportion (1:2:4) with black hard crusher broken granite chips laid in two layers the bottom layer being ¾\" thick ¼\" to ¾\" size black hard broken granite chips of approved quality & from approved quarry & Top layer of ¼\" thick with 1/8\" to ¼\" size black hard crusher broken granite chips laid down over 4\" dry epidorite metal in ground floor including rounding of corners watering, curing with basic cost, conveyance, royalties of all materials, & cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete in all floors as per the direction of the Engineer-in-charge | | 21 | Sqm |
|---|
| 23 | 18 | Supplying, fitting and fixing M.S. pannel shutter single/double leaf of approved design in doors and windows including bending and cutting sizes of grooves in choukaths and for over lapping portion shutter where necessary, supplying, fitting and fixing cleats send blocks and fixing oxidized iron or chromium plated, iron aldrops, tower bolts, handles, irons hinges, screws, etc. including labour cess but excluding GST complete as per requirement and any additional fittings as directed by the Engineer-in-charge in all floors | | 280 | Kg |
|---|
| 24 | 19 | Distempering two coats with any approved shade over interior surface of walls and ceiling including labour, T&P. and cost of distemper required for the work etc. including labour cess but excluding GST complete as per direction of Engineer-in-charge | | 175.69 | Sqm |
|---|
| 25 | 20 | Finishing wall with water proofing cement paint of approved shade two coats to give on even shade including basic cost of cement paint, all labour, T&P. and curing etc. including labour cess but excluding GST complete as per direction of Engineer-in-charge | | 415.98 | Sqm |
|---|
| 26 | 21 | Painting two coats over a coat of primer with paints of approved shade in all floors to wood and iron works including sand papering, polishing the surface, basic cost, conveyance, of all materials, all labour and T&P. required for the work including labour cess but excluding GST including the cost of paint and primer as per the direction of the Engineer-in-charge | | 36.59 | Sqm |
|---|
| 27 | 22 | Conveying the excavated surplus earth within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers to required level, grade, camber and slope including removal of stumps, roots, shrubs and other foreign debries from the cut surface including basic cost, conveyance all T&P and cost of all labour as required for the work etc. including labour cess but excluding GST complete as per direction of Engineer-in-charge | | 402.5 | Cum |
|---|