| 1 | 10 | Repair of FRP lining & Patch Work | Item 00010 | | |
|---|
| 2 | 10.1 | FRP lining work as per PDRP271-8440-PR6047-Rev-1 & MECS 732-101 standard: Removal of existing damaged lining material, surface preparation & re-lining as per instruction of EIC, including all tools-tackles, safety gadgets, manpower, consumables, etc, completion will be considered after proper testing at site. (For new lining or patching work on equipments, structures, existing pipes, ducts etc.) | Item 10.10 | | |
|---|
| 3 | 10.2 | Dismantling / Removal of existing damaged or loose FRP lining from equipment, pipes, ducts, structures etc. & dispose the same at directed place with all labour,tools & tackles & material etc all complete. | Item 10.20 | 182 | M2 |
|---|
| 4 | 10.3 | FRP lining work for Lining Thickness: 2 mm | Item 10.30 | 8 | M2 |
|---|
| 5 | 10.4 | FRP lining work for Lining Thickness: 5 mm | Item 10.40 | 39 | M2 |
|---|
| 6 | 10.5 | FRP lining work for Lining Thickness: 6 mm | Item 10.50 | 29 | M2 |
|---|
| 7 | 10.6 | FRP lining work for Lining Thickness: 8 mm | Item 10.60 | 23 | M2 |
|---|
| 8 | 10.7 | FRP lining work for Lining Thickness: 9 mm | Item 10.70 | 26 | M2 |
|---|
| 9 | 10.8 | FRP lining work for Lining Thickness: 10 mm | Item 10.80 | 25 | M2 |
|---|
| 10 | 10.9 | FRP lining work for Lining Thickness: 12 mm | Item 10.90 | 39 | M2 |
|---|
| 11 | 20 | New FRP joints: Pipe/Ducts | Item 00020 | | |
|---|
| 12 | 20.01 | FRP jointing work as per PDRP271-8440-PR6047-Rev-1 & MECS 732-101 standard: Cutting, Face preparation, fitting & jointing of pipe or duct material,including all tools-tackles, safety gadgets, manpower, consumables, etc, completion will be considered after proper testing at site. (For new piping or ducting joint only). | Item 20.10 | | |
|---|
| 13 | 20.02 | FRP jointing work for Pipe dia: 0.5 inch | Item 20.20 | 13 | EA |
|---|
| 14 | 20.03 | FRP jointing work for Pipe dia: 0.75 inch | Item 20.30 | 13 | EA |
|---|
| 15 | 20.04 | FRP jointing work for Pipe dia: 1 inch | Item 20.40 | 20 | EA |
|---|
| 16 | 20.05 | FRP jointing work for Pipe dia: 1.5 inch | Item 20.50 | 13 | EA |
|---|
| 17 | 20.06 | FRP jointing work for Pipe dia: 2 inch | Item 20.60 | 13 | EA |
|---|
| 18 | 20.07 | FRP jointing work for Pipe dia: 3 inch | Item 20.70 | 8 | EA |
|---|
| 19 | 20.08 | FRP jointing work for Pipe dia: 4 inch | Item 20.80 | 8 | EA |
|---|
| 20 | 20.09 | FRP jointing work for Pipe dia: 6 inch | Item 20.90 | 3 | EA |
|---|
| 21 | 20.1 | FRP jointing work for Pipe dia: 8 inch | Item 20.100 | 3 | EA |
|---|
| 22 | 20.11 | FRP jointing work for Pipe dia: 10 inch | Item 20.110 | 2 | EA |
|---|
| 23 | 20.12 | FRP jointing work for Pipe dia: 18 inch | Item 20.120 | 2 | EA |
|---|
| 24 | 20.13 | FRP jointing work for Pipe dia: 24 inch | Item 20.130 | 2 | EA |
|---|
| 25 | 20.14 | FRP jointing work for Pipe dia: 30 inch | Item 20.140 | 2 | EA |
|---|
| 26 | 20.15 | FRP jointing work for Pipe dia: 36 inch | Item 20.150 | 2 | EA |
|---|
| 27 | 30 | Additional allowances - Fixed. Wherein Bidder has not required to quote | Item 00030 | | |
|---|
| 28 | 30.1 | As per tripartite agreement on 18th Feb-19, in addition to minimum wage as per notification of GOVT of India including other statutory requirement(PF,ESI, Gratuity/retrenchment benefits, bonus, payment against national holidays), existing workmen are eligible for getting following Additional allowances/facilities: Additional allowances/facilities of contract workers as per IOCL Norms - Fixed part (Bidder not to be quoted) | Item 30.10 | | |
|---|
| 29 | 30.2 | Additional Allowances for Canteen +washing + transport per attendance - Payment shall be done as per actual on documentary evidence.\nQty. =3130 days, Rate=Rs 40.00\ntotal value= (3130*40)=Rs 125200.00 (INR One Lakh Twenty Five Thousand Two Hundred Only)\nBidder has not to quote | Item 30.20 | | |
|---|
| 30 | 30.3 | Reimbursement against one day leave with wages for every 20 days. Payment shall be done as per actual on documentary evidence.\nQty. =160 days, Rate=Rs 551.00\ntotal value= (160*551)=Rs 88160.00 (INR Eighty Eight Thousand One Hundred & Sixty Only)\nBidder has not to quote | Item 30.30 | | |
|---|
| 31 | 30.4 | Against Enrollment in Insurance Scheme as per Govt. Directives - Pradhan Mantri Jeevan Jyoti Bima Yojana + Pradhan Mantri Suraksha Bima Yojana. Payment shall be done as per actual on documentary evidence | Item 30.40 | | |
|---|
| 32 | 30.5 | Against Enrollment in Insurance Scheme as per Govt. Directives - Pradhan Mantri Jeevan Jyoti Bima Yojana (Rs. 330) Payment shall be done as per actual on documentary evidence\nQty. =10.00 No's, Rate=Rs 330.00\ntotal value= (10*330)=Rs 3300.00 ( INR Three Thousand Three Hundred Only)\nBidder has not to quote | Item 30.50 | | |
|---|
| 33 | 30.6 | Against Enrollment in Insurance Scheme as per Govt. Directives - + Pradhan Mantri Suraksha Bima Yojana (Rs.12) Payment shall be done as per actual on documentary evidence\nQty. =10.00 No's, Rate=Rs 12.00\ntotal value= (10*12)=Rs 120.00 (INR One Hundred & Twenty Only)\nBidder has not to quote | Item 30.60 | | |
|---|