Tender For Shegaon Tirthakshatra Vikas Arakhada . Rectification Of Undergraound Sewerage Scheme Phase I According To Combine Visit Of Mjp And Np Shegaon Dated 20 . 03 . 2019 And 04 . 05 . 2019 At Shegaon .
Tender Value
19.30 Lakhs
Estimated cost
Bid Submission
02 Nov 2019
0 days left
EMD
19300
Bank guarantee accepted
Document Fee
2240
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Shegaon → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
tender for Shegaon Tirthakshatra Vikas Arakhada . Rectification Of Undergraound Sewerage Scheme Phase I According To Combine Visit Of Mjp And Np Shegaon Dated 20 . 03 . 2019 And 04 . 05 . 2019 At Shegaon .
BOQ
| Name of Work: Rectification of Underground Sewerage Scheme Phase I according to combine visit of MJP and NP Shegaon dated 20.03.2019 and 04.05.2019. | |||||
|---|---|---|---|---|---|
| Sr.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1.1 | Item No-1-Providing ISI stanard RCC pipes in standard lengths of following class and diameter suitable for rubber ring joints including all taxes (central and local), inspection charges transport to departmental store, site, unloading and stacking etc. complete. (with third party inspection)\na) Class NP 2 RCC PIPES\n300mm dia | 210 | Rmt | |
| 2 | 1.2 | b) Class NP 3 RCC PIPES\n150mm dia | 220 | Rmt | |
| 3 | 1.3 | Item No.02 Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed,\nmanual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.\nA) Lift 0 to 1.5 m\n | 1132.5 | Cu.m | |
| 4 | 1.4 | A) Lift 1.5 m to 3.0m | 485.36 | Cu.m | |
| 5 | 1.5 | Item No-3-Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with socketed R.C.C. pipes with rubber joints (including cost of rubber ring) with cost of conveyance from stores to site of work, cost of jointing material, labour, giving hydraulic testing etc. complete as directed by Engineer-in-charge (For all class of pipes.) Rubber ring joints.\n150 mm dia | 220 | Rmt | |
| 6 | 1.6 | 300 mm dia | 210 | Rmt | |
| 7 | 1.7 | Item No. 4 Providing and constructing on sewer, BB Masonry circular manhole with concentric cone 1.2 m dia at bottom and 0.5 m dia at top and upto a depth of 2.00 m with 23 cm brick work in CM 1:4 proportion excluding excavation,including foundation concrete 250 mm thick and haunches and channels in c.c 1:2:4 proportion, finishing channels in smooth rendering, providing CI dapuri type steps each weighing 5.5 Kg., 1:2:4 coping and providing and fixing approved make and quality S.F.R.C. frame and cover of 56 cm dia etc. complete | 0.01 | Rmt | |
| 8 | 1.8 | Item No5-Providing and constructing on sewer, BB Masonry circular manhole with concentric cone 1.5 m dia at bottom and 0.5 m dia at top and upto a depth of 5.00 m with 23 cm brick work up to depth up to metre from top and 35cm thick brick work for balance depth in CM 1:4 proportion with 20mm thick smooth plaster on both side in CM 1:2 proportion excluding excavation including foundation concrete 25mm thick haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.!. dapuri types steps each weighing 5.5kg, 1:2:4 coping and providing and fixing approved make and quality S.F.R.C frame and cover of 56cm dia etc. complete\nUpto 2.0 m depth | 4 | No. | |
| 9 | 1.9 | Upto 2.5 m depth | 4 | No. | |
| 10 | 2 | Upto 3.0 m depth | 4 | No. | |
| 11 | 2.1 | Item No.06 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete | 1479.36 | Cu.m | |
| 12 | 2.2 | Item No. 07 Disposing of excavated stuff of any kind from site to work to any place which is within a lead of 5 Km as directed etc. complete | 0.01 | Cu.m | |
| 13 | 2.3 | I) Qty. to be Rectified | 138.5 | Cu.m | |
| 14 | 2.4 | Item No-8 -Dewatering the excavated, trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distances as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. | 4000 | Bhp/Hr | |
| 15 | 2.5 | Item no.9 Removing of NP-2 and NP-3 pipes including stacking at road side as directed by Engineer-in-Charge upto 900mm dia etc complete | 430 | Rmt | |
| 16 | 2.6 | Item no.10Cleaning of Manhole chamber by engaging labour manually i.e removing of silt, debries, deposited materials in Manhole chamber as directed by Engineer-in-Charge | 50 | Nos | |
| 17 | 2.7 | Item No.11 Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, including excavation, B.B. masonry in C.M. 1:5 Proportion precast S. F. R. C.frame and cover,etc.complete as directed by Engineerin-charge.\nNote:Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for balance depth exceeding 1.2 M\nValve Chamber with Precast steel fibre reinforced concrete ( S.F.R.C.) frame & covers. \n60x45 cm internal size and depth upto 0.9 M | 10 | Nos | |
| 18 | 2.8 | Item No. 12 Restoration of road surfaces with approved material with proper slope matching to its original surface and compacting and watering etc as directed by Engineer- In-Charge | 200 | Sqm | |
| 19 | 2.9 | Item No. 13 Removing and refixing of Paver block as directed by Engineer-in -charge | 50 | Sqm | |
| 20 | 3 | Item No. 14 Provding and laying insitu following grades of Plain cement concrete of trap/ granite…. For foundation and bedding including…etc complete. | 0.92 | Cum | |
| 21 | 3.1 | Item No. 15 Excavation fo foundataion/pipe trenches in hard rock and concrete road by chiselling, wedging line drilling,by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto distance of 50m beyond the area and lifts as below, stacking as directed by Engineer in charge, normal dewatering, etc complete. | 5.606 | Cum | |
| 22 | 3.2 | Item No. 16.Providing and laying in situ Cement concrete of trap/granite/quartzite/ gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, 'plywood form work, bully/steel propups, compaction, finishing and curing, etc, complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L & T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (excluding M.S. or Tor\nreinforcement) | 5.63 | Cum | |
| 23 | 3.3 | Item No.17 Cleaning of sewer line between manhole to manhole using Jet Machine/ manually including rent of jet machine and required labours and fuel for operating jet machine also cleaning of manhole manually as directed by Engineer-in- Charge | 5 | Day's |
AI Tender Summary
Tender Timeline
Oct 25, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedNov 02, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 04, 2019
Bid Opening Date
Technical bids will be opened and evaluated.