| 1 | Laying of CC Table drain | NA | 147.54 | 1 Cum | 212.25 | 31315.00 |
| Carting the excavated earth to a lead of 15 KMS including Labour chargess for loading and unlosding, transportation etc. complete as per specification |
| 2 | Laying of CC Table drain | NA | 71.34 | 1 Cum | 5562.80 | 396850.00 |
| Supply and placing of the M-30 Design Mix Concrete by ready mix, mixed in a batching and mixing plant as per approved mix design, for sub base over a prepared subgrade, cement content not to be less than 400Kg/Cum with crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes graded as per table 600-1, with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, concrete strength not to be less than 10 Mpa at 7 days, including cost and conveyance of all materials like cement, sand, coarse aggregate, water, centering etc., to site, all labour charges for mixing, transported to site by transit mixer,pumping and laying concrete, centering and vibrating, curing and finishing etc. complete, including seigniorage charges and cost of steel and its fabrication charges for finished item of work, as per Technical Specification 601 MORTH etc., complete for finished item of work- For CC road |
| 3 | Laying of CC Table drain | NA | 71.34 | 1 Cum | 4680.80 | 333928.00 |
| Supply and placing of the M-10 Design Mix Concrete by ready mix, mixed in a batching and mixing plant as per approved mix design, for sub base over a prepared subgrade, cement content not to be less than 220Kg/Cum with crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes graded as per table 600-1, with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, concrete strength not to be less than 10 Mpa at 7 days, including cost and conveyance of all materials like cement, sand, coarse aggregate, water, centering etc., to site, all labour charges for mixing, transported to site by transit mixer, pumping and laying concrete, centering and vibrating, curing and finishing etc. complete, Excluding seigniorage charges and cost of steel and its fabrication charges for finished item of work, as per Technical Specification 601 MORTH etc., complete for finished item of work- For CC Roads. |
| 4 | Laying of CC Table drain | NA | 147.54 | 1 Cum | 203.85 | 30076.00 |
| Earth work excavation for foundations and depositing on bank for all lifts with an initial lead of 10m including all operational ,incidental, labour charges such as shoring, sheeting ,planking ,strutting etc complete for finished item. excluding dewatering charges etc. as per SS-20B (APSS 308) |