| 1 | 1 | Earthwork in excavation of foundation of structures | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Upto 3m depth | | 1308.22 | cum |
|---|
| 3 | 1.02 | From 3m to 6m depth | | 871.33 | cum |
|---|
| 4 | 2 | PCC 1:3:6 in foundation | BI01010001010000000000000515BI0100001118 | 99.48 | cum |
|---|
| 5 | 2.01 | Cost of Carriage Materials for PCC. | | 1 | cum |
|---|
| 6 | 3 | RR Stone masonry in cement mortar for substructure | | 141.76 | cum |
|---|
| 7 | 3.01 | Cost of Carriage Materials for Stone Masonry. | | 1 | cum |
|---|
| 8 | 4 | RCC M 25 grade in open foundation | | 341.55 | cum |
|---|
| 9 | 4.01 | Cost of Carriage Materials for RCC M25 | | 1 | cum |
|---|
| 10 | 5 | RCC M 25 grade in sub- structure | BI01010001010000000000000515BI0100001120 | 360.42 | cum |
|---|
| 11 | 5.01 | Cost of Carriage Materials for RCC M25 | | 1 | cum |
|---|
| 12 | 6 | Supplying, fitting and placing TMT (Fe 500 or above) bar reinforcement in foundation | BI01010001010000000000000515BI0100001121 | 84.3 | t |
|---|
| 13 | 6.01 | Cost of Carriage Materials for TMT. | | 1 | t |
|---|
| 14 | 7 | Providing weepholes in PCC /RCC abutment,wing wall with 100mm dia UPVC pipe | BI01010001010000000000000515BI0100001123 | 138.68 | m |
|---|
| 15 | 8 | Back filling behind abutment, wing wall and return wall | BI01010001010000000000000515BI0100001125 | 461.79 | cum |
|---|
| 16 | 8.01 | Cost of Carriage Materials for Backfilling. | | 1 | cum |
|---|
| 17 | 9 | Providing & laying of filter media with granular materials/stone crushed aggregates | BI01010001010000000000000515BI0100001126 | 148.52 | cum |
|---|
| 18 | 9.01 | Cost of Carriage Materials for filter media. | | 1 | cum |
|---|
| 19 | 10 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) | | 172032 | cum |
|---|
| 20 | 11 | Providing and laying RCC in superstructure | | | |
|---|
| 21 | 11.01 | Height upto 5m | | 146.49 | cum |
|---|
| 22 | 11.02 | Cost of Carriage Materials for RCC. | | 1 | cum |
|---|
| 23 | 12 | Supplying, fitting, and placing TMT(Fe 500 or above) bar reinforcement (Fe 500) in superstructure | | 26.89 | MT |
|---|
| 24 | 12.01 | Cost of Carriage Materials for TMT. | | 1 | MT |
|---|
| 25 | 13 | Providing and laying cement concrete wearing course M 30 | | 28.01 | cum |
|---|
| 26 | 13.01 | Cost of Carriage Materials for M30. | | 1 | cum |
|---|
| 27 | 14 | Drainage spouts complete as per drawing | | 9 | each |
|---|
| 28 | 15 | Providing PCC M15 grade leveling course below approach slab | | 6.3 | cum |
|---|
| 29 | 15.01 | Cost of Carriage Materials for M15. | | 1 | cum |
|---|
| 30 | 16 | Providing RCC M25 approach slab including reinforcement and formwork | | 12.6 | cum |
|---|
| 31 | 16.01 | Cost of Carriage Materials for M25. | | 1 | cum |
|---|
| 32 | 17 | Providing and laying of compression seal joint | | 17.4 | cum |
|---|
| 33 | 18 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 | | 140.4 | cum |
|---|
| 34 | 18.01 | Cost of Carriage Materials for Stone boulder. | | 1 | cum |
|---|
| 35 | 20 | (A) Sub - Total | | 1 | No. |
|---|
| 36 | 21 | (B) Exclusive of VAT (5%) on (A) | | 1 | No. |
|---|
| 37 | 22 | Add GST (12%) & Swachh Bharat(0.5%) on (B) | | 1 | No. |
|---|