Housing Urban and Rular Development Government Departments Closing in 0 days TDR #22239072

Flood Damage Work 2019 - Urgent Rectification Of Severly Damaged Surface In Between Km 51/200 And 52/400 On Quilandy - Edavanna State Highway In Ernad Lac In Malappuram District . Flood Damage Work 2019 - Urgent Rectification Of Severly Damaged Surface I

Issued by Government Departments · QUILANDY, Kerala
Tender Value
22.31 Lakhs
Estimated cost
Bid Submission
29 Oct 2019
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
QUILANDY → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Flood Damage Work 2019 - Urgent Rectification Of Severly Damaged Surface In Between Km 51/200 And 52/400 On Quilandy - Edavanna State Highway In Ernad Lac In Malappuram District . Flood Damage Work 2019 - Urgent Rectification Of Severly Damaged Surface In Between Km 51/200 And52/400 On Quilandy - Edavanna State Highway In Ernad Lac In Malappuram District .

BOQ

Work Name:Flood damage work 2019 - Urgent rectification of severly damaged surface in between Km 51/200 and 52/400 on Quilandy - Edavanna State HighWay in Ernad LAC in Malappuram District.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Road Patch WorkBI01010001010000000000000515BI0100001113
21.0155.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.BI01010001010000000000000515BI010000111488.536cum
31.0255.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)BI01010001010000000000000515BI010000111521.889cum
41.0355.6.a : Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.BI01010001010000000000000515BI010000111616.468cum
51.0455.7.a : Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.BI01010001010000000000000515BI010000111776.96cum
61.0555.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.BI01010001010000000000000515BI010000111811.576cum
71.0655.9.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.BI01010001010000000000000515BI01000011195.421cum
81.075.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.BI01010001010000000000000515BI01000011208400sqm
91.085.7.1 : Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade.Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade.BI01010001010000000000000515BI01000011218400sqm
101.093.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br>\n Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)BI01010001010000000000000515BI010000112268cum
111.112.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.BI01010001010000000000000515BI010000112310.2cum
121.1112.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br>\nPCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15BI01010001010000000000000515BI010000112429.92cum
131.1214.1.A.1.A : Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer as per drawing and Technical Specification.\n<br> For solid slab super-structure - Height upto 5mFurnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height upto 5mBI01010001010000000000000515BI01000011252.25cum
141.1312.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsBI01010001010000000000000515BI01000011260.18MT
151.143.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mBI01010001010000000000000515BI0100001127289.25cum

AI Tender Summary

OUR REF NO 22239072
AUTHORITY Government Departments
TENDER VALUE 22.31 Lakhs
LAST DATE 29-10-2019
Authority
Authority Name Public Works Department
Work Description Flood Damage Work 2019 - Urgent Rectification Of Severly Damaged Surface In Between Km 51/200 And 52/400 On Quilandy - Edavanna State Highway In Ernad Lac In Malappuram District . Flood Damage Work 2019 - Urgent Rectification Of Severly Damaged Surface In Between Km 51/200 And52/400 On Quilandy - Edavanna State Highway In Ernad Lac In Malappuram District .
Basic Detail
Tender No PWD/2019-2020/2441/RdDnMNJ
Bidding Type Tender
Location
City QUILANDY
State Kerala
Key Dates
Publish Date 23 Oct 2019
Submission Date 29 Oct 2019
Open Date 31 Oct 2019
Finance
Tender Value 22.31 Lakhs
Tender Fee 2760
EMD 50000
Exemption Not Available
Document List
BOQ_429264.xls
sbd.pdf
epaymentform.pdf
Tendernotice_1.pdf
PreAgmntFormat.pdf
nit.pdf
C914383F-5E2F-42E5-BB69-47FA6608EF84.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 23, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 29, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 31, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_429264.xls

pdf

sbd.pdf

pdf

epaymentform.pdf

pdf

Tendernotice_1.pdf

pdf

PreAgmntFormat.pdf

pdf

nit.pdf

html

C914383F-5E2F-42E5-BB69-47FA6608EF84.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders