}

Demarcation Of Alignment On Ground , Preparation Of Gad Of Bridges, Yard Plans, Alignment Plan, Index Plan, L-Section, X-Sections, Land Acquisition Plan, Soil Investigation Etc. And Other Preliminary Activities In Connection With Construction Of 3Rd Runni-Uttar Pradesh

North Eastern Railways-NER has published Demarcation Of Alignment On Ground , Preparation Of Gad Of Bridges, Yard Plans, Alignment Plan, Index Plan, L-Section, X-Sections, Land Acquisition Plan, Soil Investigation Etc. And Other Preliminary Activities In Connection With Construction Of 3Rd Runni. Submission Date for this Tender is 15-11-2019. Soil Survey Tenders in Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

22219402
Demarcation Of Alignment On Ground , Preparation Of Gad Of Bridges, Yard Plans, Alignment Plan, Index Plan, L-Section, X-Sections, Land Acquisition Plan, Soil Investigation Etc. And Other Preliminary Activities In Connection With Construction Of 3Rd Runni
Open Tender
Indian
Uttar Pradesh
15-11-2019

Tender Details

Demarcation Of Alignment On Ground , Preparation Of Gad Of Bridges, Yard Plans, Alignment Plan, Index Plan, L-Section, X-Sections, Land Acquisition Plan, Soil Investigation Etc. And Other Preliminary Activities In Connection With Construction Of 3Rd Running Line Between Gonda - Burhwal Section Of Lucknow Division.

Key Value

Document Fees
INR 2000 /-
EMD
INR 110100.0 /-
Tender Value
INR 55.03 Lakhs /-

BOQ Items

0 1 2 3 4 5 6 7 8
0 S.No. Item\rCode Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
1 Schedule A-Non Schedule Items 1757312.22 Above/\rBelow/Par
2 1 1 62.00 Kilometre 5585.49 346300.38 AT Par 346300.38
3 Item Description:- Marking alignment on ground by actual field survey with chaining, pegging etc. complete at\r20 mtr. Interval and providing of cement concrete mattam/pillar in M-20 or as directed by Engineer-in-charge or\rprovided under special conditions of concrete with the help of theodolite including all labour and material.
4 2 2 5.00 Kilometre 7966.19 39830.95 AT Par 39830.95
5 Item Description:- Marking new alignment, where any type of permanent obstruction has come up in the way of\rproposed alignment, which may involve trial and error method to arrive at acceptable alignment. Payment will be\rmade only for final alignment acceptable to the Engineer-in-charge.
6 3 3 62.00 Kilometre 2197.57 136249.34 AT Par 136249.34
7 Item Description:- Detailed leveling along center line for preparation of L-section and cross center line at 10\rmeter intervals up to 50 m on either side at change in multiple of 50 m on either side at chainage in multiple of 50\rmtrs or closer wherever required and at every important point such as tangent point of curves, center line of road\rcrossings, center line of bridges, bed level of minor bridges, collection of details upto a distance of minimum 50\rmtrs. across alignment etc. including check leveling and closing thereof on the same day for fixing TBMs in the\rsection and construction of pucca cement concrete pillar/mattams at every kilometer approximately.
8 4 4 10.00 Each 7142.51 71425.10 AT Par 71425.10
9 ItemDescription:- Site selection for major and important bridges including leveling for profile of stream bed,\rleveling of 1.5 km. bed on upstream and downstream, traversing for catchment area of the stream collection of\rhydrological data, hydrological calculation for deciding waterway for Bridges, construction of pucca mattams on\rapproaches and preparation of GAD plan for Bridges etc. complete.
10 5 5 36.00 Each 458.75 16515.00 AT Par 16515.00
11 Item Description:- Investigation for minor bridges i.e. traversing for catchment area of the stream, collection of\rall relevant hydrological data etc. complete including hydrological calculations for deciding water way hydrological\rcalculation for deciding water way for the bridge.
12 6 6 62.00 Each 915.66 56770.92 AT Par 56770.92
13 Item Description:- Fixing and Constructing by standard bench mark at every km. and at the site of Major bridges\rand/orplacesdirectedbyEngineer-in-chargeincludingsupplyofmaterialsandlabourrequiredforsuch\rconstruction as per drawing supplied by Railway.
14 7 620.00 Each 140.33 87004.60 AT Par 87004.60
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail