Construction Of 2 Nos . D Type And 1 No . F Type Staff Quarter For Joda Chc Under Ombadc For The Year 2019-20 .
Tender Value
56.36 Lakhs
Estimated cost
Bid Submission
30 Oct 2019
0 days left
EMD
56400
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Joda → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of 2 Nos . D Type And 1 No . F Type Staff Quarter For Joda Chc Under Ombadc For The Year 2019-20 .
BOQ
| Name of Work:Construction of 2 Nos. 'D' Type and 1 No. 'F' Type staff quarter for Joda CHC under OMBADC for the year 2019-20. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 0 | CIVIL WORKS (PART- I) | |||
| 2 | 1 | Earthwork in excavation of foundation in hard soil or gravelly soil within 50m initial lead and 1.5m, initial lift including shoring,shuttering, propping bullahs, piling,dewatering from foundation, supplying & working pumps & staking the excaveted materials away from the working area including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | |||
| 3 | 1.1 | 2 Nos. 'D' Type Quarter | 244.12 | Each Cum. | |
| 4 | 1.2 | 1 No. 'E' Type Quarter | 70.84 | Each Cum. | |
| 5 | 2 | Supplying and filling in foundation and plinths with sand well watered and compacted including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, watering, sundries, tools and plants, etc., complete as per the direction of the Engineer-in-charge. | |||
| 6 | 2.1 | 2 Nos. 'D' Type Quarter | 128.86 | Each Cum. | |
| 7 | 2.2 | 1 No. 'E' Type Quarter | 26.25 | Each Cum. | |
| 8 | 3 | Providing and laying plain cement concrete (1:3:6) in foundation using 40 mm size black hard crusher broken granite metal of approved quality from approved quarry including mixing, lowering, laying and compacting to proper thickness, watering and curing for the required period including cost of all material, labour, conveyance, loading and unloading, taxes,cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc. ,complete as per the direction of the Engineer-in-charge. | |||
| 9 | 3.1 | 2 Nos. 'D' Type Quarter | 79.8 | Each Cum. | |
| 10 | 3.2 | 1 No. 'E' Type Quarter | 14.39 | Each Cum. | |
| 11 | 4 | Providing lifting , hoisting and laying reinforced cement concrete of M 20 grade to the following structural member or in places as shown in the drawing for all floors with 20 mm and down graded size balck hard crusher broken granite chips of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumb and finishing the exposed surfaces smooth (if required by grouting / providing plaster with cement mortar 1:4 wherever necesary without any extra cost) scaffolding, including watering and curing for the required period including providing strong, rigid, levelled and plumbed centring and shuttering to required shape and size, for floors with wooden or steel centring materials, with all necessary bracing and ties and supports with level centring covered with bituminous paper with provision of necessary holes and pockets for electrical conduits, pipes, PH pipes, for hooks or boxes, switchboards and insert plates, clamps and extension bars, etc, including dismantling the same after the required interval from the date of | |||
| 12 | 4.01 | casting, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering,curing, sundries. tools and plants etc. complete as per direction of the engineer-in-charge, but excluding cost of materials and labour for reinforcement . | |||
| 13 | 4.02 | i) R.C.C Column base , footing , Pedestal | |||
| 14 | 4.03 | 2 Nos. 'D' Type Quarter | 60.02 | Each Cum. | |
| 15 | 4.04 | 1 No. 'E' Type Quarter | 18.76 | Each Cum. | |
| 16 | 4.05 | ii) R.C.C Plinth Band | |||
| 17 | 4.06 | 2 Nos. 'D' Type Quarter | 18.16 | Each Cum. | |
| 18 | 4.07 | 1 No. 'E' Type Quarter | 4.32 | Each Cum. | |
| 19 | 4.08 | iii) R.C.C Column & Beam in Superstructure | |||
| 20 | 4.09 | 2 Nos. 'D' Type Quarter | 22.8 | Each Cum. | |
| 21 | 4.1 | 1 No. 'E' Type Quarter | 6.11 | Each Cum. | |
| 22 | 4.11 | iv) R.C.C. Chajja / Shelves | |||
| 23 | 4.12 | 2 Nos. 'D' Type Quarter | 37.9 | Each Sqm. | |
| 24 | 4.13 | 1 No. 'E' Type Quarter | 7.37 | Each Sqm. | |
| 25 | 4.14 | v) R.C.C. roof Slab | |||
| 26 | 4.15 | 2 Nos. 'D' Type Quarter | 46.32 | Each Cum. | |
| 27 | 4.16 | 1 No. 'E' Type Quarter | 5.56 | Each Cum. | |
| 28 | 4.17 | vi) R.C.C. Window sill level | |||
| 29 | 4.18 | 2 Nos. 'D' Type Quarter | 0.94 | Each Cum. | |
| 30 | 4.19 | 1 No. 'E' Type Quarter | 0.39 | Each Cum. | |
| 31 | 5 | Supplying MS round / deformed / tor steel reinforcement bars (of only manufacturing companies such as SAIL / RINL / TATA / JINDAL STEEL / SHYAM STEEL) of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in position as per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights). | |||
| 32 | 5.01 | 2 Nos. 'D' Type Quarter | 156.52 | Each Qntl | |
| 33 | 5.02 | 1 No. 'E' Type Quarter | 38.29 | Each Qntl | |
| 34 | 6 | Providing Fly Ash brick masonry work in Foundation and plinth using 250 mm X 120 mm X 80 mm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:6 (1 cement : 6 sand), immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., complete as per the direction of the Engineer-in-charge. | |||
| 35 | 6.1 | 2 Nos. 'D' Type Quarter | 32.92 | Each Cum. | |
| 36 | 6.2 | 1 No. 'E' Type Quarter | 9.79 | Each Cum. | |
| 37 | 7 | Providing Fly Ash brick masonry work in super structure using 250 mm X 120 mm X 80 mm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:6 (1 cement : 6 sand), immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., complete as per the direction of the Engineer-in-charge. | |||
| 38 | 7.01 | 2 Nos. 'D' Type Quarter | 110.94 | Each Cum. | |
| 39 | 7.02 | 1 No. 'E' Type Quarter | 25.89 | Each Cum. | |
| 40 | 8 | Providing Fly Ash brick masonry work in super structure using 250 mm X 120 mm X 80 mm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:4 (1 cement : 4 sand), immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., complete as per the direction of the Engineer-in-charge. | |||
| 41 | 8.01 | 2 Nos. 'D' Type Quarter | 1.24 | Each Cum. | |
| 42 | 8.02 | 1 No. 'E' Type Quarter | 1.62 | Each Cum. | |
| 43 | 9 | Providing 16 mm thick cement mortar 1:6 (1 cement : 6 sand ) on rough surface of masonry walls for all floors, including raking joints and scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and level and providing grooves as shown in the drawing, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., complete as per the direction of the Engineer-in-charge. | |||
| 44 | 9.01 | 2 Nos. 'D' Type Quarter | 486.3 | Each Sqm | |
| 45 | 9.02 | 1 No. 'E' Type Quarter | 260.73 | Each Sqm | |
| 46 | 10 | Providing 12 mm thick cement mortar 1:6 (1 cement : 6 sand ) to outside surface / plumbed surface of masonry, raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves as shown in the drawing, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 47 | 10.01 | 2 Nos. 'D' Type Quarter | 504.88 | Each Sqm | |
| 48 | 10.02 | 1 No. 'E' Type Quarter | 272.43 | Each Sqm | |
| 49 | 11 | Providing 20 mm thick cement mortar 1:4 (1 cement : 4 sand ) to outside surface / plumbed surface of masonry, raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves as shown in the drawing, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 50 | 11.01 | 2 Nos. 'D' Type Quarter | 409.06 | Each Sqm | |
| 51 | 11.02 | 1 No. 'E' Type Quarter | 74.28 | Each Sqm | |
| 52 | 12 | Providing 6 mm thick cement plaster (1:4)(1 cement : 4 sand ) to RCC surfaces finished smooth including closed deep chiping and slury treatment., raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves as shown in the drawing, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 53 | 12.01 | 2 Nos. 'D' Type Quarter | 394.94 | Each Sqm. | |
| 54 | 12.02 | 1 No. 'E' Type Quarter | 36.94 | Each Sqm. | |
| 55 | 13 | Supplying, fitting and fixing vitrifed tile in floors of size 600mm x 600mm Coloured / Printed series(Homogeneous) of approved make conforming to IS : 13755 laid on 20 mm thick cement mortar (1:4) (1 cement: 4 course sand) (Using Branded Cement) and filling joints with white cement of approved quality including cost of all materials, labour T&P, polishing, washing and acid cleaning, including cost of all materials, conveyance, royalties, taxes, cess, labour, scaffolding, watering, curing, sundries, T&P etc. complete as per the direction of the Engineer-in-charge. | |||
| 56 | 13.01 | 2 Nos. 'D' Type Quarter | 352.34 | Each Sqm. | |
| 57 | 13.02 | 1 No. 'E' Type Quarter | 28.69 | Each Sqm. | |
| 58 | 14 | Providing Vitrified tiles of size 600mm x 600mm Coloured / Printed series(Homogeneous) of premium grade having thickness 8 mm to 10mm confirming to IS : 13756 in dado/skirting and rises of steps to any height in all floors, fixed with neat cement slurry, after soaking the tiles in water, over 20 mm thick cement mortar (1:4)(1 cement : 4 sand) (Using Branded Cement) mix, joint pointed with cement mixed with matching pigment to match the shade of the tiles , including washing and cleaning with oxalic acid, including cost of all materials, conveyance, royalties, taxes,cess, labour, scaffolding, watering, curing, sundries, T&P etc. complete as per the direction of the Engineer-in-charge. | |||
| 59 | 14.01 | 2 Nos. 'D' Type Quarter | 16.58 | Each Sqm. | |
| 60 | 14.02 | 1 No. 'E' Type Quarter | 2.49 | Each Sqm. | |
| 61 | 15 | Providing Vitrified tiles of size 600mm x 600mm Coloured / Printed series(Homogeneous) of premium grade having thickness 8 mm to 10mm confirming to IS : 13756 in dado/skirting and rises of steps to any height in all floors, fixed with neat cement slurry, after soaking the tiles in water, over 12 mm thick cement mortar (1:3)(1 cement : 3 sand) (Using Branded Cement) mix, joint pointed with cement mixed with matching pigment to match the shade of the tiles , including washing and cleaning with oxalic acid, including cost of all materials, conveyance, royalties, taxes,cess, labour, scaffolding, watering, curing, sundries, T&P etc. complete as per the direction of the Engineer-in-charge. | |||
| 62 | 15.01 | 2 Nos. 'D' Type Quarter | 39.08 | Each Sqm. | |
| 63 | 15.02 | 1 No. 'E' Type Quarter | 7.49 | Each Sqm. | |
| 64 | 16 | Supplying all materials, labour, T&P and providing and fixing ceramic tiles in floors, treads or steps and landing on 25mm thick bed of cement mortar (1:1) ( 1 cement : 1 sand ) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including watering, curing,cost of all materials, conveyance of all materials to work site , payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge ( ceramic floor tiles of premium grade having thickness 7mm to 8mm conforming to IS 13755 of size 40cmx40cm special printed series to be pre-approved by the Engineer-in-charge ) | |||
| 65 | 16.01 | 2 Nos. 'D' Type Quarter | 75.44 | Each Sqm. | |
| 66 | 17 | Providing (20cm x 30cm / 20cm x 20cm )size special plain/printed series Ceramic glazed wall tiles of premium grade having thickness 6.5mm to 6.7mm conforming to IS 13753 of approved make and shade in dado/skirting and rises of steps to any height in all floors, fixed with neat cement slurry, after soaking the tiles in water, over 12 mm thick cement mortar (1:3)(1 cement : 3 sand)(Using Branded Cement) mix, joint pointed with cement mixed with matching pigment to match the shade of the tiles , including washing and cleaning with oxalic acid, including cost of all materials, conveyance, royalties, taxes, cess, labour, scaffolding, watering, curing, sundries, T&P etc. complete as per the direction of the Engineer-in-charge. | |||
| 67 | 17.01 | 2 Nos. 'D' Type Quarter | 62.42 | Each Sqm. | |
| 68 | 18 | Supplying all materials, labour, T&P and providing and fixing ceramic tiles in floors, treads or steps and landing on 20mm thick bed of cement mortar (1:4) ( 1 cement : 4 sand ) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including watering, curing,cost of all materials, conveyance of all materials to work site , payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge ( ceramic floor tiles of premium grade having thickness 7mm to 8mm conforming to IS 13755 of size 40cmx40cm special printed series to be pre-approved by the Engineer-in-charge ) | |||
| 69 | 18.01 | 1 No. 'E' Type Quarter | 22.11 | Each Sqm. | |
| 70 | 19 | Providing and fixing of Fixed Ventilators of approved make to be fabricated from roll formed sections made of pre-painted steel (base steel as per IS-513 of 0.6 mm thick “D” quality, galvanized as per IS-277 with zinc of 120 Gm/Sq.mtr) with paint specification being with primer of 5-7 microns and finished paint with polyster paint (Black /Pearl white/ Chocolate Brown) of 12-16 microns alongwith the alkyd backer at the back of 5-7 microns and the sizes of outer frame being of 46x52 mm and with all vertical and horizontal mullions are of 46x70 mm and fixed beadings are of 18x25 mm. Accessories / gaskets are to be used as per the manufacturer’s supply and specification like handle being made of high grade aluminium powder coated and with nylon receiver and gasket will be made of EPDM. All corner brackets are to be made of CRCA with zinc phosphating. The mullion caps and louvered-clips should be of glass filled nylon. The sections are to be cut to length ,mitre joined with corner bracket and frames are fixed to the concrete/masonry walls by means of self expanding screws | |||
| 71 | 19.01 | 2 Nos. 'D' Type Quarter | 0.74 | Each Sqm. | |
| 72 | 19.02 | 1 No. 'E' Type Quarter | 0.56 | Each Sqm. | |
| 73 | 20 | 2.5 cm A.S. flooring with cement concrete (1:2:4) including punning using 12 mm size c.b. granite chips with cost coveyance, royalities and taxes of all metirals and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-in-charge. | |||
| 74 | 20.01 | 2 Nos. 'D' Type Quarter | 4.74 | Each Sqm. | |
| 75 | 20.02 | 1 No. 'E' Type Quarter | 2.37 | Each Sqm. | |
| 76 | 21 | Supplying, fitting and fixing M.S. Door,M.S. Windows,M.S. grill,Collapsible gates made out of structural steel, flats, plates, angle,bars conforming to IS specification, for door,windows, ventilators,gates etc. as per drawing and design, including priming 1 coat with approved metal primer etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 77 | 21.01 | 2 Nos. 'D' Type Quarter | 887.56 | Each Kg. | |
| 78 | 21.02 | 1 No. 'E' Type Quarter | 304.33 | Each Kg. | |
| 79 | 22 | Labour for fitting and fixing of M.S. Door,M.S. Windows,M.S. grill,Collapsible gates as per approved design fixed to walls with clamps and making good to all damages in walls and floors etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 80 | 22.01 | 2 Nos. 'D' Type Quarter | 32.34 | Each Sqm. | |
| 81 | 22.02 | 1 No. 'E' Type Quarter | 10.93 | Each Sqm. | |
| 82 | 23 | Providing fitting, fixing Dressed seasoned Sal wood frame conforming to IS specifications and as per drawing and design, fixed to walls and columns with grouted clamps including provision of handles, locking arrangements, including all cost of labour, T&P, hire charges of drilling machine, labour charges, making good to all damages in walls and floors etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 83 | 23.01 | 2 Nos. 'D' Type Quarter | 0.14 | Each Cum. | |
| 84 | 23.02 | 1 No. 'E' Type Quarter | 0.06 | Each Cum. | |
| 85 | 24 | Providing supplying, fitting, fixing of glazed window vantilators with 32mm size Piasal paneled wood frame complete with all iron fittings with cost, conveyance and taxes of all materials and labor with T&P required for the work etc. complete as per direction of Engineer-in-Charge. | |||
| 86 | 24.01 | 2 Nos. 'D' Type Quarter | 10.4 | Each Sqm. | |
| 87 | 24.02 | 1 No. 'E' Type Quarter | 0.19 | Each Sqm. | |
| 88 | 25 | Providing fitting, fixing of Al. door with anodized Al. door section of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section no 9221 and tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour,T&P, hire charges of drilling machine,labour charges ,making good to all damages in walls and floors etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 89 | 25.01 | 2 Nos. 'D' Type Quarter | 375.72 | Each Kg. | |
| 90 | 25.02 | 1 No. 'E' Type Quarter | 133.89 | Each Kg. | |
| 91 | 26 | Supplying ,fitting and fixing of 12mm thick Prelaminated particle board(standard type)(I.S.I) in aluminum door, partition walling including cutting to size with cost of nails, putty ,making good to all damages in walls and floors etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess,royalties, scaffolding, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 92 | 26.01 | 2 Nos. 'D' Type Quarter | 26.92 | Each Sqm. | |
| 93 | 26.02 | 1 No. 'E' Type Quarter | 9.59 | Each Sqm. | |
| 94 | 27 | Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778 as windows frame section No. 4095,4096 and 9777,3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P, hire charges of drilling machine, labour charges, making good to all damages in walls and floors etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, sundries, tools and plants, excluding cost of glass etc. complete as per the direction of the Engineer-in-charge. | |||
| 95 | 27.01 | 2 Nos. 'D' Type Quarter | 114.92 | Each Kg. | |
| 96 | 27.02 | 1 No. 'E' Type Quarter | 42.78 | Each Kg. | |
| 97 | 28 | Supplying ,fitting and fixing of 6mm thick Black Glass Panes in aluminum framed openable window , window (sliding type) including cutting to size with cost of nails, putty ,making good to all damages in walls and floors etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess,royalties, scaffolding, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge. | |||
| 98 | 28.01 | 2 Nos. 'D' Type Quarter | 21.15 | Each Sqm. | |
| 99 | 28.02 | 1 No. 'E' Type Quarter | 7.87 | Each Sqm. | |
| 100 | 29 | Painting two coats with enamel paint over a coat of primer of approved quality and shade over surfaces as specified below(steel /wood surface) to give an even shade of approved quality, including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding. watering, curing, sundries. tools and plants, etc., complete as per the direction of the Engineer-in-charge. | |||
| 101 | 29.01 | 2 Nos. 'D' Type Quarter | 14.54 | Each Sqm. | |
| 102 | 29.02 | 1 No. 'E' Type Quarter | 10.93 | Each Sqm. | |
| 103 | 30 | Applying one caots of primer to wall surface with any approve cement primer including cost, conveyance, royalty and taxes of all materials and cost of all labour, T&P etc. required for the work complete in all respect as per the direction of Engineer-in-Charge (BERGER / SALIMAR / ASIAN / JOHNSON/ Nerolac primer to be used) | |||
| 104 | 30.01 | 2 Nos. 'D' Type Quarter | 1386.12 | Each Sqm | |
| 105 | 30.02 | 1 No. 'E' Type Quarter | 570.1 | Each Sqm | |
| 106 | 31 | Finishing wall surface of walls with Cement Based wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with,cost of all materials,taxes,cess, labour, conveyance,royalties, watering, curing, tools and plants, etc. complete, as per the direction of the Engineer-in-charge. | |||
| 107 | 31.01 | 2 Nos. 'D' Type Quarter | 1370.39 | Each Sqm | |
| 108 | 31.02 | 1 No. 'E' Type Quarter | 216.73 | Each Sqm | |
| 109 | 32 | Providing and applying painting over the plastered surfaces with 2 coats of Plastic emulsion paint of approved quality and shade, using the required quantity of Plastic emulsion paint as specified by the manufacturer to give an even shade including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., complete as per the direction of the Engineer-in-charge. | |||
| 110 | 32.01 | 2 Nos. 'D' Type Quarter | 1370.39 | Each Sqm | |
| 111 | 32.02 | 1 No. 'E' Type Quarter | 216.73 | Each Sqm | |
| 112 | 33 | Providing and applying painting over the plastered surfaces with 2 coats of Weather coat(I.S.I) of approved quality and shade, using the required quantity of Weather coat(I.S.I) as specified by the manufacturer to give an even shade including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., complete as per the direction of the Engineer-in-charge. | |||
| 113 | 33.01 | 2 Nos. 'D' Type Quarter | 316.04 | Each Sqm | |
| 114 | 33.02 | 1 No. 'E' Type Quarter | 98.45 | Each Sqm | |
| 115 | 34 | Supplying all materials, labour, T&P and providing cement concrete ( 1:2:4 ) with 12mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge | |||
| 116 | 34.01 | 1 No. 'E' Type Quarter | 0.52 | cum |
AI Tender Summary
Tender Timeline
Oct 21, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedOct 30, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 31, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender