Rcc Retaining Wall Around The Ob Dump Near Proposed Wharf Wall At Block-B Project . , Block-B-Madhya Pradesh

Northern Coalfields Limited-NCL has published Rcc Retaining Wall Around The Ob Dump Near Proposed Wharf Wall At Block-B Project . . Submission Date for this Tender is 04-11-2019. Wall construction Tenders in Block-B Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

22192734
Rcc Retaining Wall Around The Ob Dump Near Proposed Wharf Wall At Block-B Project .
Open Tender
Indian
Madhya Pradesh
Block-B
04-11-2019

Tender Details

Rcc Retaining Wall Around The Ob Dump Near Proposed Wharf Wall At Block-B Project .

Key Value

Document Fees
Refer document
EMD
INR 392000.0 /-
Tender Value
INR 3.13 Crore /-

BOQ Items

Name of Work: RCC retaining wall around the OB dump near proposed wharf wall at Block-B Project.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge.
2 2 Ordinary rock 350 cum
3 3 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. 2000 cum
4 4 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
5 5 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). 336 cum
6 6 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
7 7 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). 1404 cum
8 8 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
9 9 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). 1080 cum
10 10 Centering and shuttering including strutting, propping etc. and removal of form for:\n\n
11 11 Foundations, footings, bases of columns, etc. for mass concrete 1080 sqm
12 12 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 9115 sqm
13 13 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
14 14 Cold twisted bars 243432 Kg
15 15 Earth work in excavation in all kind of soil/silt all operation mechanically with all lifts, complete as per instructions of EIC .\nLead up to 50m 6000 cum
16 16 Total impact of GST for the purpose of CTC BI01010001010000000000000515BI0100001129 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail