Rajasthan Electronics And Instruments Limited-REIL has published Rate For Supply Of Bos, Design, Engineering, Energy Supply, Installation, Testing, Commissioning, Synchronizing With Evacuation At 11Kv Substation Inside The Premises ,Comprehensive , Operation & Maintenance For 12 Years Of 200 Kw Grid Connected Solar Pv . Submission Date for this Tender is 24-10-2019. Substation Tenders in REIL JAIPUR Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: Rate for Supply of BOS, Design, Engineering, Energy Supply, Installation, Testing, Commissioning, Synchronizing with Evacuation at 11kv substation inside the premises ,comprehensive , Operation & Maintenance for 12 years of 200 kW Grid Connected Solar PV Plant in Udaipur ,Rajasthan from regular/ approved vendors | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Design, Detailed Engineering, Supply of BOS (without modules and inverters) , Installation, Testing & Commissioning of Grid connected Solar PV power plant of required capacity as per tender specifications i/c transportation, storage of material, insurance, associated electrical works as mentioned in technical specification enclosed, required civil works including foundation, statutory clearances/ approvals and any other requirement for successful commissioning of solar power plant on “Turnkey/ Single responsibility” basis. The Job includes the following:\na) Installation, commissioning of solar power PV modules and String Inverters supplied by REIL and SITC of cabling works, Chemical earthing, providing backup UPS, etc. as required.\nb) Associated electrical works like SITC of , 11KV 250 A HT VCB Panel with one incomer & one outgoing VCB at solar substation & providing one 11KV 250 A VCB at load end in power house etc, LT panel for auxillary AC power supply, Advanced lightning protection systems, earthing etc.\nc) Providing and fixing of requisite computer hardware & software including internet connection, SCADA, etc. for data monitoring.\nd) Construction of Substation for Solar Power plant, foundation for PV panels, fencing, and perimeter lighting for substation building.\ne) Glare analysis.\nf) Provision of equipment for net metering.\ng) Providing water supply systems & water supply distribution pipes, cabling etc. and providing safety tools like fire extinguisher, sand bucket, first aid kit, PVC insulation mat etc.\nh) Preparation of Drawings, Deposit of Necessary Statutory Fees and Liasoning Work for getting Approval and obtaining sanction for energization of Solar PV system and associated Electrical System upto evacuvation point at service block from Central Electricity Authority/ DISCOM/Any other Nodal Agency of Central/State Government as required as per technical specifications and special conditions of contract. | Item 1 | 200000 | Wp |
2 | 2 | Providing & Laying XLPE insulated / P.V.C. sheathed cable of 1.1 KV grade with aluminium conductor Armoured of IS:7098-I/1554-1 approved make in\nground as per IS:1255 including excavation of 30cmx75cm size trench, 25 cm thick under layer ofsand, second Class bricks covering, refilling earth, compaction of earth, making necessary connection, testing etc. as required of size.\n185.0 Sq.mm 3.5 core | Item 2 | 800 | Mtr |
3 | 3 | Providing & Laying XLPE insulated IS:7098/II/85 of approved make H.T.cable for working voltage 11 K.V.Earthed with Stranded Compacted Circular Aluminium Conductor, Conductor Screened with Extruded Semi-conducting compound, XLPE Insulated, Insulation Screened with extruded semi-conducting compound in combination with Copper Tape, cores laid up, inner sheath of Thermoplastic tape, galvanised flat steel strip armoured and overall Extruded PVC Type ST- 2 Outer Sheathed cable direct in ground including excavation of 30cmx100cm size trench, 25cm layer of river sand, second Class bricks covering, refilling earth, compaction of earth, making necessary connection testing etc.as required of size.\n3 core 185.0 Sq.mm | Item 3 | 500 | Mtr |
4 | 4 | Providing & making heat shrinkable type indoor/outdoor/straight through terminations/joint kit of approved make suitable for XLPE insulated 11 KV cable, with required components, prepration of cable ends,testing etc. as required of following sizes .\nIndoor 3 core 120/150/185 Sq.mm | Item 4 | 6 | Set |
5 | 5 | Outdoor 3 core 120/150/185/225 Sq.mm | Item 5 | 4 | Set |
6 | 6 | Straight Through 3 core 120/150/185/225 Sq.mm | Item 6 | 4 | Set |
7 | 7 | Facility Management Contract for Monitoring & GENERAL Maintenance of 11 KV Grid Connected 200KWp SPV PP at Cattle house,waste processing facility,Titardi comprising of Solar PV Modules, DC DBs/JBs, Power Conditioning Units, String Monitoring Units, Lightning and Earthing Protection System, AC DC Cables, SCADA System, Weather Monitoring System, Transformer, 11 KV Panels etc., for Two Shift Basis [8 Hours For One Shift] on Day Time, Monitoring, Control and Maintenance for 100% Serviceability including Co-ordination with 11 KV Main Sub-Station inside the premises including Routine Cleaning of Modules as required.\n1st Year- Defects Liabiility Period | Item 7 | 12 | Months |
8 | 8 | 2nd Year- Defects Liabiility Period | Item 8 | 12 | Months |
9 | 9 | 3rd Year- Defects Liabiility Period | Item 9 | 12 | Months |
10 | 10 | 4th Year- Defects Liabiility Period | Item 10 | 12 | Months |
11 | 11 | 5th Year- Defects Liabiility Period | Item 11 | 12 | Months |
12 | 12 | 6th Year | Item 12 | 12 | Months |
13 | 13 | 7th Year | Item 13 | 12 | Months |
14 | 14 | 8th Year | Item 14 | 12 | Months |
15 | 15 | 9th Year | Item 15 | 12 | Months |
16 | 16 | 10th Year | Item 16 | 12 | Months |
17 | 17 | 11th Year | Item 17 | 12 | Months |
18 | 18 | 12th Year | Item 18 | 12 | Months |
19 | 19 | All Inclusive Comprehensive ANNUAL Maintenance Contract of 11 KV Grid Connected 200KWp SPV PP at Cattle house,waste processing acility,Titardi comprising of Solar PV Modules, DC DBs/JBs, Power Conditioning Units, String Monitoring Units, Lightning and Earthing Protection System, AC DC Cables, SCADA System, Weather Monitoring System, Transformer, 11 KV Panels Structural Support Systems, Auxiliary & Control Supply System, Communication and Control Cables, HT & LT Power Cables, ALL SOFTWARE AND HARDWARE ETC., AS REQUIRED. [FIRST 5 YEARS WILL BE DLP]\n6th Year | Item 19 | 12 | Months |
20 | 20 | 7th Year | Item 20 | 12 | Months |
21 | 21 | 8th Year | Item 21 | 12 | Months |
22 | 22 | 9th Year | Item 22 | 12 | Months |
23 | 23 | 10th Year | Item 23 | 12 | Months |
24 | 24 | 11th Year | Item 24 | 12 | Months |
25 | 25 | 12th Year | Item 25 | 12 | Months |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy