Tender For Maintenance Of Arboriculture , Beautification Of The Main , Side Median Including Watering , Grass Cutting , Plants Trimming , Mulching , Repairing Of Existing Bamboofencing Including Painting From Mahisbathan Bridge To 3Rd Rotary 7844 /Nkda/
Tender Overview
Project Description
Tender For Maintenance Of Arboriculture , Beautification Of The Main , Side Median Including Watering , Grass Cutting , Plants Trimming , Mulching , Repairing Of Existing Bamboofencing Including Painting From Mahisbathan Bridge To 3Rd Rotary 7844 / Nkda / Engg-36 / 2010 -X-Maintenance Of Arboriculture , Beautification Of The Main , Side Median Including Watering , Grass Cutting , Plants Trimming , Mulching , Repairing Of Existing Bamboofencing Including Painting From Mahisbathan Bridge To 3Rd Rotary , Maintenance Of Lawn Including Regular Weeding , Watering , Application Of Manure , Spraying Of Different Pesticides Insecticided , Dewatering & Shearing Of Lawn , Replacement Of Dead Patches , Gap And Earth Filling / Sand Filling ( If Required ) Dressing Etc . All Complete As Per Direction Of Eic , Mowing Of Ground , As And When Instructed Under Detailed Supervision Of The Department And Instruction Of E . I . C . By Deploying Mowing Machine Including Machinery , Labour , Cost Of Fuel , Lubricant All Included , Cleaning The Ground And Removal Of Cut Off Grass From The Ground Etc . All Complete As Per Direction Of The E . I . C . , Supply Of Pesticides , Insecticides , Manure As And When Required To Maintain The Plants And Trees Within The Median . , Spreading Of Sludge , Dump Manure / Farm Yard Manure / Animal Dung Manure And Good Earth In Required Thickness . This Includes Supply Of Labour , Tools & Plants Excluding Materials . , Preparation And Maintenance Of Seasonal Flower Bed Including Supply And Plantation Of New Flower Plants , Regular Deweeding , Watering , Application Of Manure Fertillizer , Spraying Of Different Pesticides Training And Staking , Application Of Folair Nutrients , Removal Of Dead Leaves And Plant , Replacement Of Dead Plants Etc . All Complete . Before Planting The Next Crop Of Seasonal Flowers The Beds Are To Be Dug Up To 30Cm Deep And Roots , Stems Of Pervious Crop Removed . The Excavated Earth Is To Be Placed On The Side Of The Bed . Fresh Manure Is To Beadded And The Soil Refilled Back After Drying For 3 / 4 Days ( Except During Rains ) And Seasonal Flower Of Particular Section Be Planted In Every Season All Complete As Per Direction Of Eic . , Watering Of Plants Using Mechanical Water Tanker Fitted With Pumps , Huse Pipe , Jet Etc . , All Complete As Per Direction Of Eic . , Supplying And Stacking Of Good Earth ( Adequate For Horticulture Work ) At Site Including Royalty ( Earth Measured In Stack Will Be Reduced By 20% For Payment ) , Supplying And Stacking Sludge ( Adequate For Horticulture Work ) At Site In Dry Cake Form From Approved Disposal Work Site Including Royalty , All Lead And Lift Etc . ( Sludge Measured In Stack Will Be Reduced By 8% ) . , Strong Bamboo Posts , Posts Plates , Rafters , Ties Etc . Fitted And Fixed Complete With Coir Rope Or Nails As Directed . ( Embedded Portion Of Posts Shall Also Be Paid For Against This Item Cost Of Digging Hole And Repacking Being Paid For Seperately ) : ( A ) 75 Mm . Dia Bamboo , Fixing Of Bamboo Posts By Digging Hole In All Sorts Of Soil And Subsequent Thorough Repacking The Same With Spoils Including The Cost Of One Coat Of Coal-Tarring The Embedded Portion Of The Bamboo : ( B ) Depth 600 Mm . , Half Bamboo Runners ( Made From 75 Mm Dia Stout Bamboo ) And Fitting Fixing In Positions With Country Made Rose Headed Nails . , Renewing With Half Old And Half New Materials Bamboo Walling Made Of Crushed Bamboo Or Split Bamboo Or Bamboo Twigs ( Kanchis ) As Directed And Tied With Necessary Stiffners Of Split Bamboo ( In Pairs ) Fitted And Fixed Complete ( But Excluding The Cost Of Supporting Frame Work ) , Priming One Coat On Timber Or Plastered Surface With Synthetic Oil Bound Primer Of Approved Quality Including Smoothening Surfaces By Sand Papering Etc . , Painting With Best Quality Synthetic Enamel Paint Of Approved Make And Brand Including Smoothening Surface By Sand Papering Etc . Including Using Of Approved Putty Etc . On The Surface , If Necessary : ( A ) On Timber Or Plastered Surface : With Super Gloss ( Hi-Gloss ) - ( Iv ) Two Coats ( With Any Shade Except White )
BOQ
| Name of Work: Maintenance of Arboriculture & beautification of the main & side median including watering, grass cutting, plants trimming, mulching & repairing of existing bamboo fencing including painting from Mahisbathan bridge to 3rd rotary main median, both side median & rotary along MAR-1111 at Action Area - I, under NKDA, (For 01 year). | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Maintenance of lawn including regular weeding, watering, application of manure, spraying of different pesticides insecticided, dewatering & shearing of lawn, replacement of dead patches, gap and earth filling/ sand filling (if required) dressing etc. all complete as per direction of EIC | BI01010001010000000000000515BI0100001113 | 218299 | per Sqm |
| 2 | 2 | Mowing of ground, as and when instructed under detailed supervision of the department and instruction of E.I.C. by deploying mowing machine including machinery, labour, cost of fuel, lubricant all included, cleaning the ground and removal of cut off grass from the ground etc. all complete as per direction of the E.I.C. \n\n | BI01010001010000000000000515BI0100001114 | 109149 | per Sqm |
| 3 | 3 | Supply of pesticides, insecticides, manure as and when required to maintain the plants and trees within the median.\n | BI01010001010000000000000515BI0100001115 | 218299 | per Sqm |
| 4 | 4 | Spreading of sludge, dump manure/farm yard manure/animal dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials.\n | BI01010001010000000000000515BI0100001116 | 3398.1 | % Sq.m/ month |
| 5 | 5 | Preparation and Maintenance of seasonal flower bed including supply and plantation of new flower plants,regular deweeding ,watering, application of manure fertillizer, spraying of different pesticides training and staking ,application of folair nutrients, removal of dead leaves and plant, replacement of dead plants etc. all complete.Before planting the next crop of seasonal flowers the beds are to be dug up to 30cm deep and roots ,stems of pervious crop removed. the excavated earth is to be placed on the side of the bed. Fresh manure is to beadded and the soil refilled back after drying for 3/4 days(except during rains)and seasonal flower of particular section be planted in every season all complete as per direction of EIC. | BI01010001010000000000000515BI0100001117 | 3398.1 | per Sqm |
| 6 | 6 | Watering of plants using mechanical water tanker fitted with pumps, huse pipe, jet etc. , all complete as per direction of EIC. \n\n | BI01010001010000000000000515BI0100001118 | 1.77358e+06 | per Sqm |
| 7 | 7 | Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment) | BI01010001010000000000000515BI0100001119 | 18 | per cum |
| 8 | 8 | Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%). | BI01010001010000000000000515BI0100001120 | 18 | per cum |
| 9 | 9 | Strong bamboo posts, posts plates, rafters, ties etc. fitted and fixed complete with coir rope or nails as directed. (Embedded portion of posts shall also be paid for against this item cost of digging hole and repacking being paid for seperately) :\n(a) 75 mm. dia bamboo | BI01010001010000000000000515BI0100001121 | 3228.53 | mtr |
| 10 | 10 | Fixing of bamboo posts by digging hole in all sorts of soil and subsequent thorough repacking the same with spoils including the cost of one coat of coal-tarring the embedded portion of the bamboo :\n(b) Depth 600 mm. | BI01010001010000000000000515BI0100001122 | 2152.48 | Each |
| 11 | 11 | Half bamboo runners (made from 75 mm dia stout bamboo) and fitting fixing in positions with country made rose headed nails. | BI01010001010000000000000515BI0100001123 | 8609.4 | mtr |
| 12 | 12 | Renewing with half old and half new materials bamboo walling made of crushed bamboo or split bamboo or bamboo twigs (kanchis) as directed and tied with necessary stiffners of split bamboo (in pairs) fitted and fixed complete (but excluding the cost of supporting frame work) | BI01010001010000000000000515BI0100001124 | 1434.9 | Sqm |
| 13 | 13 | Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. | BI01010001010000000000000515BI0100001126 | 14349 | Sqm |
| 14 | 14 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :\n(a) On timber or plastered surface :\nWith super gloss (hi-gloss) -\n(iv) Two coats (with any shade except white) | BI01010001010000000000000515BI0100001127 | 14349 | Sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender