tender for optical fiber cable Construction Work With Allied Activities For Maintenance In Alwar Ssa , excavating trenches upto a depth of 1 . 65 m and back filling the excavated trenches after laying the hdpe / plb pipe with or without protection as per tender specification ( oft ) , i ) in kuchcha soil ( oftk ) , ii ) in pucca soil ( oftp ) , iii ) in rocky soil ( soft ) ( oftsr ) , iv ) in rockky soil ( hard ) ( ofthr ) , excavation by manual tunneling or boring and reinstatement as per construction specification of the tender to a depth of 1 . 65m or more in bituminised / concrete / set stone for single plb pipe ( including laying charges ) ( ofb ) , laying of plb hdpe duct by hdd method at a depth of 2m or more bsnl will supply hdpe / plb pipes & other accessories ( ofh ) , i ) single plb pipe , ii ) two to three pipe , iii ) four to seven pipe , laying of plb hdpe pipe / gi pipe / rcc pipe / dwc bsnl will supply hdpe / plb pipes & other accessories ( lph ) , i ) laying of single hdpe / plb pipes / coils , coupled with coupler , ii ) laying of two hdpe / plb pipes / coils , coupled with coupler , iii ) laying of three / four hdp / plbe pipes / coils , coupled with coupler , laying and fixing of 80 mm / 65 mm / 40 mm g . i . pipes in trenches with plb / hdpe pipes / coils inside and drawing pp rope . bsnl will supply g . i . troughs / gi pipes in lengths approx 6m clamps and plb hdpe pipes / coils ( lgit ) , laying / clamping / fixing of 65 mm / 40 mm g . i . pipes on bridges and culverts horizontally / vertically and leading in bsnl customer premises with laying hdpe / plb pipes / coils inside . all material will be supplied by contractor except g . i . pipes . ( lgic ) , road / rail crossing through horizontal boring method / hdd mehtod and inserting 80 / 65 / 40 dia gi pipes and pushing hdpe / plb pipes / coil inside . bsnl will supply g . i . troughs / gi pipes in lengths approx 6m clamps and plb hdpe pipes / coils ( lgih ) i ) depth shall be 2m and above without gi protection . ii ) depth is less than 2m with gi protection as applicable . , laying of full round rcc ( isi mark ) / dwc pipe ( as per existing tec gr no:- gr / dwc-34 / 01 sep 2007 with latest amendment ) in trenches over plb hdpe pipes / coils , on culverts / bridges / nulla and for cases where cable is laid at less depth ( wherever required ) bsnl will supply rcc full round / rcc half split pipe ( isi mark ) or dwc full round pipe / dwc half -split pipe ( as per tec gr no:- gr / dwc-34 / 01 sep 2007 with latest amendment and coupler . materials required for sealing the coupling of rcc / dwc pipes will be arranged by the contractor ( lfrc ) , i ) full round rcc pipe , ii ) full round dwc pipe , laying of half-split rcc ( isi mark ) / dwc pipe ( as per existing tec gr no:- gr / dwc-34 / 01 sep 2007 with latest amendment ) in trenches over plb hdpe pipes / coils , onculverts / bridges / nulla and for cases where cable is laid at less depth ( wherever required ) bsnl will supply rcc full round / rcc half split pipe ( isi mark ) or dwc full round pipe / dwc half -split pipe ( as per tec gr no:- gr / dwc-34 / 01 sep 2007 with latest amendment and coupler . materials required for sealing the coupling of rcc / dwc pipes will be arranged by the contractor ( lsrc ) , i ) half split rcc pipe , ii ) half split dwc pipe , providing cement concrete 1:2:4 at wheel guard of bridge / culvert over the toe or in the trench for protection . plb hdpe ducts , gi pipes , will be supplied by the bsnl . all other materials required for the work shall be arranged by the contractor . rates include cost of material and standard curring , shuttering etc . and transportation from store . ( pcct ) , providing cement concrete 1:2:4 over the plb hdpe pipe with wire mesh in the trenches for protection , where the depth is less than 120cm ( cement concrete as per specification ) . plb hdpe ducts , gi pipes , will be supplied by the bsnl . all other materials required for the work shall be arranged by the contractor . rates include cost of material and standard curring , shuttering etc . and transportation from store . ( pccm ) , cable laying by pulling / blowing , laying of ofc by pulling / blowing method in new duct including opening of manhole , sealing of plb hdpe pipes by rubber bushes in manholes , providing hdpe / plb / rcc split pipes in manhole / back filling of manholes . plb hdpe pipe shall be provided by the bsnl . all other materials required for the work shall be arranged by the contractor . ( ofpb ) , laying of ofc by pulling / blowing method in existing duct / leading -in in bsnl / customer premises , including cleaning of chocked pipe as per construction specifications . plb hdpe pipe shall be provided by the bsnl . all other materials required for the work shall be arranged by the contractor . ( ofpb ) , splicing of fibres in existing / new joint chambers for making straight / branch joints on new routes or at fpoi and end to end testing of all fibres after splicing . including fixing of joint closure . note:- all tools , splicing machine and instruments required for above work shall be arranged by the contractor . ( ssbj ) , i ) up to 12 f of cable , ii ) 24 f of cable , iii ) 48 f of cable , iv ) 96 f of cable , v ) 288 f of cable , vi ) a ribbon of of cable , splicing of all fibres in the fiber termination box and testing all the fibres for continuity . this will also include installation / mounting of the ftb as specified . note:- all tools , splicing machine and instruments required for above work shall be arranged by the contractor . ( sftb ) , i ) up to 12 f of cable , ii ) 24 f of cable , iii ) 48 f of cable , iv ) 96 f of cable , v ) 288 f of cable , vi ) a ribbon of of cable , splicing of overhead of cable upto 6 fibre ( sohof ) , jointing chamber , digging of pit for jointing chamber and construction of bricks joints chamber , filling of brick chamber with clean sand ( bajri only ) , supply and placing of pre cast / stone slabs on brick chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document . all materials required for the work shall be arranged by the contractor ( jcbr ) , digging of pit for jointing chamber and construction of pre febricated rcc chamber , filling of pre febricated rcc chamber with clean sand ( bajri only ) , supply and placing of pre cast / stone slabs on pre febricated rcc chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document . all materials required for the work shall be arranged by the contractor ( jcrc ) , providing , construction and fixing of rcc manholes at site as per construction specification given in the tender document , work includes excavation of pits for the man hole . all materials required for the work shall be arranged by the contractor . ( jcmh ) , route indicator , digging of pits 1m towards jungle side or road side or on the trench / manhole / joint chamber for fixing of route / joint indicator directly buried i . e . without concreting route / joint indicator , painting and sign writing route / joint indicator . bsnl will supply route / joint indicator , all the other material required for the work will be arranged by the contractor . ( ribd ) , digging of pits 1m towards jungle side or road side or on the trench / manhole / joint chamber for fixing of route / joint indicator and concreting of route / joint indicator , painting and sign writing of route / joint indicator . bsnl will supply route / joint indicator , all the other material required for the work will be arranged by the contractor . ( ribc ) , supply of route indicator ( stone / rcc ) , including digging of pi