Military Engineer Services-MES has published Repair/Maintenance Of Summer Cooling Appliances At Ins Kattabomman , Rs ( P ) And Repair To Ac Plant , Cooling Appliance And Dg Set At Ins Parundu Under Ge Tirunelveli. Submission Date for this Tender is 05-11-2019. Diesel Generators Tenders in Vijayanarayanam and Ramnad Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: REPAIR/MAINT OF SUMMER COOLING APPLIANCES AT INS KATTABOMMAN, RS(P) AND REPAIR TO AC PLANT, COOLING APPLIANCE AND DG SET AT INS PARUNDU UNDER GE TIRUNELVELI 8875 /E8 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | SCHEDULE 'A' (PART-II- REPAIR TO COOLING APPLIANCES) | |||
2 | 2 | Providing comprehensive annual periodical / preventive maintainence including repair and annual maintenance of cooling appliances as listed in Particular specification as per manufacturer specification at INS Kattabomman, RS(P) by providig one AC / Refrigration mechanic for one general shift all as specified and directed and including replacement of minor components as listed in subsequent items here in after. The maintenance of cooling appliances includes the following:- \n(i) Cleaning of coil unit with dust blower,lubricate the indoor & outdoor fan motor with oil. (ii) Checking and cleaning the drain connection and air filter periodically,washing of coil with ventiklean solution once in a contract period. (iii) check & replace the refrigerant pipe insulation once in a contract period or as and when required (iv) Check & repair the minor electrical fault in incoming supply. (v) Check & replace the water pvc pipe \n(vi) Supply of spares/components required to be replaced under this contract shall be measure and paid seperately. | BI01010001010000000000000515BI0100001113 | 11 | Months |
3 | 3 | Supply only following items for 1.5/2.0 Ton capacity window/split type AC including testing and commissioning etc complete all as specified and as directed:- | |||
4 | 4 | Starting Capacitor 80/100 MFD. | 50 | Each | |
5 | 5 | Running Capacitor but 36 MFD. | 30 | Each | |
6 | 6 | Relay Assembly (Make: SRI RAM). | 18 | Each | |
7 | 7 | Over load protector (O L P) (Make: SRI RAM). | 20 | Each | |
8 | 8 | Selector switch for fan motor two speed. | 14 | Each | |
9 | 9 | Thermostat (Make: RANUTROL/INDOFOSS). | 20 | Each | |
10 | 10 | Air filters (FIL/ UTILITY/ SPENCER/ VOLTAS/ AIRCON/ VIDEOCON / SIDWAL). | 10 | set of Two | |
11 | 11 | Condenser fan blade metal or plastic. | 10 | Each | |
12 | 12 | Blower with circular leaf. | 6 | Each | |
13 | 13 | Fan capacitor (Make: SARADA/USHA/UNISTAR/KELTRON), 4/6 MFD. | 26 | Each | |
14 | 14 | Cabinate wiring Kit . | 8 | Set | |
15 | 15 | PVC insulated, sheathed 3-core, 2.5Sqmm copper cable | 100 | RM | |
16 | 16 | Strainer copper tube | 25 | Each | |
17 | 17 | Non Return valve (For gas top up charging) | 40 | Each | |
18 | 18 | Capillary tube (copper) | 50 | RM | |
19 | 19 | Condenser coil unit (For A/C) | 5 | Each | |
20 | 20 | PCB board suitable for indoor unit of Split AC 1.5/2.0 TR | 9 | Each | |
21 | 21 | Supply only following items for water cooler 40/80 Litres capacity and 120/160 Litres capacity:- | |||
22 | 22 | Relay unit for 40/80 Litres capacity. | 4 | Each | |
23 | 23 | Relay unit for 120/160 Litres capacity. | 5 | Each | |
24 | 24 | PVC float Ball valve, high pressure with polythene float and fly nut screwed to iron pipe or ferrule of bore 15mm complete all as specified and as directed. | 6 | Each | |
25 | 25 | Thermostat switch for 40/80, 120/160 Litres capacity complete all as specified and as directed. \nMake: RANUTROL/INDOFOSS | 5 | Each | |
26 | 26 | Water tap suitable for water cooler complete all as specified and as directed. | 5 | Each | |
27 | 27 | Supply only following items for refrigerators 180/300 Litres capacity:- | |||
28 | 28 | Relay unit for 180/300 Litres capacity. | 8 | Each | |
29 | 29 | Thermostat assembly. | 12 | Each | |
30 | 30 | Taking down unserviceable compressor and supply and fix New compressor including Oil pumping out, cleaning the refrigeration system with CO2 and charging refrigerant gas (M-22/F-22), providing NRV for further gas top up and re-fixing in the position including complete testing for following :- | |||
31 | 31 | Window/split type AC 1.5 Ton capacity.\nMake: SRIRAM/ KIRLOSKER/ TECUMSHAW/ VOLTAS | 5 | Each | |
32 | 32 | Window/split type AC 2.0 Ton capacity \nMake: SRIRAM/ KIRLOSKER/ TECUMSHAW/ VOLTAS | 2 | Each | |
33 | 33 | Water cooler 40/80 Litres capacity \nMake: SRIRAM/ KIRLOSKER/ voltas | 2 | Each | |
34 | 34 | Refrigerators 180/290 Litres capacity. | 1 | Each | |
35 | 35 | Supply and Fix Fan motor suitable for window/split AC complete with all accessories and fixing in position and testing the unit complete all as specified and as directed. | 4 | Each | |
36 | 36 | Taking down existing worn out winding from fan motor and providing of new winding (single speed) with standard gauge copper wire and complete servicing and overhauling the Fan motor and re-fixing back including testing and commissioning complete all as directed by Engineer-in-Charge:- | |||
37 | 37 | Window/split type AC 1.5/2.0 Ton capacity (Make: LG/BLUE STAR/ VEDIOCON/ VOLTAS). | 5 | Each Job | |
38 | 38 | Water cooler 40/80 Litres capacity (Make: SRIRAM/ KIRLOSKER/ voltas). | 2 | Each Job | |
39 | 39 | Water cooler 60/120 Litres capacity (Make: SRIRAM/ KIRLOSKER/ voltas). | 2 | Each Job | |
40 | 40 | Taking out all rusted portio of AC/water coolers/ refrigerators making good the same with new MS sheet of approved gauge/existing gauge including angle iron supports by tinkering/welding and cleaning the entire unit and positioning back in original place complete all as directed by Engineer-in-Charge:- | |||
41 | 41 | Window type AC 1.5/2.0 Ton capacity. | 2 | Each Job | |
42 | 42 | Water cooler 40/80 Litres capacity. | 3 | Each Job | |
43 | 43 | Refrigerator 165/185 Litres capacity. | 2 | Each Job | |
44 | 44 | M&L for taking down the following ACs 1.5/2.0 Ton capacity, Refrigerators and water cooler, cleaning the refrigeration system with CO2 and charging refrigerant gas M-22/F-22 and re-fixing in original position complete testing and commissioning all as directed by Engineer-in-Charge:- \nNOTE: (i) The net weight of Top-up gas charging Minimum 300 grms, shall be measured as one job. | |||
45 | 45 | Window type AC 1.5/2.0 Ton capacity | 8 | Each Job | |
46 | 46 | Split type AC 1.5/2.0 Ton capacity | 20 | Each Job | |
47 | 47 | Refrigerator 180 to 300 Litres capacity. | 5 | Each Job | |
48 | 48 | Water cooler 40/80 & 60/120 Litres capacity . | 5 | Each Job | |
49 | 49 | Supply only Industrial socket with 20A SP MCB for A/C control complete all as specified and as directed. \nMake: Standard / Indo asian/ Havells/SSK/HPL | 10 | Each | |
50 | 50 | supply only for copper pipe of split AC 1.5/2.0 ton capacity complete all as specified and as directed. | 20 | Running metre | |
51 | 51 | Installation, testing and commisioning of Split AC of any capacity by fixing the indoor and outdoor units and making electric and copper pipe connection complete all as specified and as directed. \nNote : - Copper pipe shell be measure and paid seperately. | 15 | Each Job | |
52 | 52 | Material and Labour for sub main wiring with two single core 1100 V grade conforming to IS 694 PVC insulated unsheathed cables 4 Sq mm multi stranded copper conductor drawn through and incl 20 mm dia non metallic PVC rigid conduit and conduit accessories fixed on walls/roof /floors/ceiling etc with an earth wire of one run 2.5 sqmm copper wire earth continuity conductor etc complete all as specified and as directed. Note : Two runs of 4 sqmm cable, one run of 2.5 sqmm cable and one run of PVC conduit shall be measured as one run. | 150 | Running metre | |
53 | 53 | Supply only water PVC flexible pipe suitable size for split / window type capacity of 1.5 / 2 TR AC complete all as specified and as directed. | 100 | Running metre | |
54 | 54 | Dismantling of compressor motor of 320 Ltr deep freezer (Make :- Blue Star) complete all as specified and as directed.\nMake :- Blue Star | 8 | Each | |
55 | 55 | Supply and fixing of compressor sealed unit for deep freezer 320 Ltrs complete all as specified and as directed. Make: Blue star. ( KCL 411 ) | 8 | Each | |
56 | 56 | Supply and fixing of blower motor 1/9 HP 230 volt single phase for Deep Freezer complete all as specified and as directed. Make: Unitech/Universal. | 8 | Each | |
57 | 57 | Thermostat for Deep Freezer 320 Ltrs complete all as specified and as directed. Make Blue Star. | 10 | Each | |
58 | 58 | Top Gasket for deep freezer 320 Ltrs complete all as specified and as directed. Make: Blue Star as per sample. | 4 | Each | |
59 | 59 | Supply and charging of refrigerant gas Maforn- R-134 to deep freezer incld testing for required pressure complete all as directed by Engr-In-Charge. | 12 | Kilogram | |
60 | 60 | Replacement of blower fan motors for desrt cooler single phase 230 Volts 150 to 180 watts complete all as directed by Engr-In-Charge. | 40 | Each | |
61 | 61 | Replacement of submersible pump for Desert cooler 1.5 mtr head AC 230 Volts fixed in repairs complete all as specified and as directed. | 40 | Each | |
62 | 62 | Replacement of wood wool pads for desert cooler set of three of superior quality fixed in repairs complete all as specified and as directed. | 60 | Per Set | |
63 | 63 | Replacement of fan blade for desert coolers complete all as specified and as directed. | 10 | Each | |
64 | 64 | Repair and over hauling of centrifugal type mono block condenser/chiller water pump (Make Kirlosker) of capacity 3 HP set including replacement of bearing impellor glands complete all as specified and as directed. | 2 | Each Job | |
65 | 65 | Material and labour for disconnecting the electric connections of the electric motor 3 HP of the AHU blower, taking out the old unserviceable winding wire, cleaning the slots for rewinding, rewinding the electric motor 3 PH 415 volts 3 HP with existing size of super enamelled copper binding wire, including allied materials like cotton tapes, glass sleeves, varnishing and assembling the motor complete and testing all as specified and as directed. | 4 | Each Job | |
66 | 66 | Material and labour for disconnecting the electric connections of the electric motor 3 HP of the Cooliing Tower, taking out the old unserviceable winding wire, cleaning the slots for rewinding, rewinding the electric motor 3 PH 415 volts 2 HP with existing size of super enamelled copper binding wire, including allied materials like cotton tapes, glass sleeves, varnishing and assembling the motor complete and testing all as specified and as directed. | 2 | Each Job | |
67 | 67 | Material and labour for Opening and dismantling both sides covers of condensor and descaling of condensor unit 16.5 TR by pumping chemicals, brushing with rods, cleaning/ oiling of tubes, replacement of gasket and reassembling it after descaling complete all as specified and as directed. | 3 | Each Job | |
68 | 68 | Supply and charging gas refrigerant R 22 Make : Mafron/freon in the Central AC plant of capacity 16.5 TR complete all as specified and directed. | 40 | Kilogram | |
69 | 69 | Material and Labour for Painting of cooling tower inner side and outer side and connected pipe lies of any size, pump sets of any capacity, compressor units, Electrical panel boars complete after scrapping the existing paint by suitable means and scrappers, two coating of approved colour of synthetic enamel paint over one coat of red oxide complete all as directed by Engr-in-charge. | 2 | Each Job | |
70 | 70 | Material and Labour for checking, Servicing, cleaning, testing ,scrapping the existing paint by suitable means and scrappers, painting complete with two coating of approved colour of synthetic enamel paint over one coat of red oxide for De humidifiers and connected pipe lines of any size complete all as directed by Engr-in-charge. | 1 | Each Job | |
71 | 71 | Replacement of PVC honey comb fills(drift eliminators) suitable size for Central type AC Plant complete all as directed by Engr-in-charge. | 2 | Each Job | |
72 | 72 | Cleaning of GI ducts and louvers inside and outside in every three months by using vacuum cleaner and blowers and ensure that no unwanted particles,dust, dirt are accumulated inside GI ducts and louvers complete all as specified and directed by Engr-in-Charge. | 3 | Each Job | |
73 | 73 | Overhauling of Air handling unit -4 nos by dismantling , assembling and testing for the following parts. Maintenance of schedule every three months.\n(a) Inspect abbsolute filters, removing and cleaning by using vaccum cleaner and refix same.\n(b) Clean cooling coil,fins by using coastic soda and water pressure method and applying Grease for all motors, check and adjust belt tension if required, check condition of blower shaft, scroll, impeller and bearings, check tightness of all electrical terminations, clean water line strainers, check proper balancing system , check for noise and vibration.\n(c) Check healthy operation of controls and safety devices. | 4 | Each Job | |
74 | 74 | Supply and fixing in repair 0 to 500 PSI Gauge complete all as specified and as directed. | 3 | Each | |
75 | 75 | Supply and fixing in repair MNX A1 Contact complete all as specified and as directed. | 1 | Each | |
76 | 76 | Supply & fix in repair Strainer 80mm complete all as specified and as directed. | 1 | Each | |
77 | 77 | Supply & fix in repair PCB for towards chiller complete all as specified and as directed. | 2 | Each | |
78 | 78 | Supply & fix sensor for Chiller and plant complete all as specified and as directed. | 2 | Each | |
79 | 79 | Material and Labour for Wiring of Electrical panel board complete with suitable size copper conductor of existing gauge including suitable thimbles all as specified and as directed. | 1 | Each Job | |
80 | 80 | Supply & fix Thermal insulation cover with Aluminium cladding sheet for 80mm for covering chiller pipelines complete all as specified and as directed. | 4 | Each Job | |
81 | 81 | SCHEDULE 'A' (PART-II- REPAIR TO DG SETS) | |||
82 | 82 | Material and labour for 'B' check & maintenance of 500 KVA DG set at UAV Power house (Make - Kirloskar Oil engine) at Ramnad after 06 months or 250 Hrs run, whichever is earlier as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring, replacement of fan belts and caliberation of FIP etc complete all as directed and specified.\n\nNote :- \n\n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr ( DVO.014.27.00 ) (ii) Fuel filter ( PL 420 PRELINE)\n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | 1 | Each Job | |
83 | 83 | Material and labour for 'B' check & maintenance of 250 KVA DG set at UAV Power house (Make - Kirloskar Oil engine) at Ramnad after 06 months or 250 Hrs run, whichever is earlier as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring, replacement of fan belts and caliberation of FIP etc all as directed and specified.\nNote :- \n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr (ii) Fuel filter.\n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | BI01010001010000000000000515BI0100001114 | 1 | Each Job |
84 | 84 | Material and labour for 'B' check & maintenance of 160 KVA DG set at ATC Power house (Make - Ashok Leyland) at Ramnad after 06 months or 250 Hrs run, whichever is earlier as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, replacement of fan belts and caliberation of FIP etc all as directed and specified. \nNote :- \n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr ( F 8835100 ) (ii) Fuel filter ( F7A 01500 )\n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours minimum all as directed by Engr-in-charge. | BI01010001010000000000000515BI0100001115 | 1 | Each Job |
85 | 85 | Material and labour for 'B' check & maintenance of 100 KVA DG set at New Adm Block (Make - Ashok Leyland) at Ramnad after 06 months or 250 Hrs run, whichever is earlier as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring, replacement of fan belts and caliberation of FIP etc all as directed and specified.\n\nNote :- \n \n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr ( F 8835100 ) (ii) Fuel filter ( F7A 01500 )\n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | 1 | Each Job | |
86 | 86 | Material and labour for 'B' check & maintenance of 82.50 KVA DG set at TS Power house (Make - Ashok Leyland) at Ramnad after 06 months or 250 Hrs run, whichever is earlier as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring, replacement of fan belts and caliberation of FIP etc complete and all as directed and specified.\nNote :- \n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr (ii) Fuel filter \n(b) Cost of (i) Lubricating oil (ii) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | BI01010001010000000000000515BI0100001117 | 1 | Each Job |
87 | 87 | Taking out the unserviceable Engine of 82.5 KVA DG Set (DFO COMPLEX) after disconnecting it from Alternator at Ramnad and carrying to the repair shop at Madurai and shifting from the repair shop after full testing and carrying to DFO Power House at Ramnad complete all as specified and as directed. | 1 | Each Job | |
88 | 88 | Material and labour for maintenance and servicing of DG Set 82.5 KVA DG Set (DFO COMPLEX) complete ‘B’ check by draining out the lubricant oil from the sump, open the top cover of the engine head complete un screwing of engine mounting such as exhaust manifold, Air cleaner, top cover of acoustic enclosure, remove the cylinder head by unscrewing nuts, bolts washers etc. remove the unserviceable cylinder with pistons and rings gaskets, tappets valves etc. remove the dust, dirt and and all unwanted particles from the main engine assembly. Check the crank shaft assembly, main bearing assembly, main nozzles complete and replacement of U/S accessories. Sending the cylinders head, pistons, rings, tapet valve to workshop for lathe work. Calibration of fuel injector pump assembly and changing the worn out/ unserviceable spares with new one , reassembling, testing on full load complete up to the satisfaction of Engineer-in-Charge for DG Set of capacity 82.5 KVA at DFO Power house. \n\nMake of DG set is - Ashok Leyland.\n\nNote:\n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr (ii) Fuel filter (iii) All standard spare parts required to replace the U/S spares to make the engine serviceable in all respects. \n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | 1 | Each Job | |
89 | 89 | Replacement of Radiator of DG Set 82.5 KVA DG Set (DFO COMPLEX) with connecting hoses complete all as specified and directed. | 1 | Each | |
90 | 90 | Replacement of Water Pump of DG Set 82.5 KVA DG Set (DFO COMPLEX) and connected hoses complete all specified and as directed. | 1 | Each Set | |
91 | 91 | Replacement of Diesel pipes of DG Set 82.5 KVA DG Set (DFO COMPLEX) complete all specified and as directed. | 4 | Each | |
92 | 92 | Repair to electrical control Panel board of DG Set 82.5 KVA DG Set (DFO COMPLEX) with wiring including MCCBs of suitable rating complete all specified and as directed. | 1 | Each Job | |
93 | 93 | Taking out the unserviceable Engine of 40 KVA DG Set (DFO COMPLEX) after disconnecting it from Alternator at INS Parundu Complex and carrying to the repair shop at Madurai and shifting from the repair shop after full testing and carrying at Ramnad complete all specified and as directed. | 1 | Each Job | |
94 | 94 | Material and labour for maintenance and servicing of DG Set 40 KVA (DFO COMPLEX), complete ‘B’ check by draining out the lubricant oil from the sump, open the top cover of the engine head complete un screwing of engine mounting such as exhaust manifold, Air cleaner, top cover of acoustic enclosure, remove the cylinder head by unscrewing nuts, bolts washers etc. remove the unserviceable cylinder with pistons and rings gaskets, tappets valves etc. remove the dust, dirt from the main engine assembly. Check the crank shaft assembly, Main bearing assembly, main nozzles complete and replacement of U/S accessories. Sending the cylinders head, pistons, rings. Tapet valve to workshop for lathe work. Calibration of fuel injector pump assembly and changing the worn out/ unserviceable spares with new one as follows, reassembling, testing on full load complete up to the satisfaction of Engineer-in-Charge for DG Set of capacity 40 KVA at DFO Power house. \n\nMake of DG set is - Ashok Leyland.\n\nNote:\n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr (ii) Fuel filter (iii) All standard spare parts required to replace the U/S spares to make the engine serviceable in all respects. \n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | 1 | Each Job | |
95 | 95 | Replacement of Radiator of DG Set 40 KVA (DFO COMPLEX) with connecting hoses complete all specified and as directed. | 1 | Each | |
96 | 96 | Replacement of Self Starter of DG Set 40 KVA (DFO COMPLEX) complete all specified and as directed. | 1 | Each Set | |
97 | 97 | Replacement of Water Pump and connected hoses of DG Set 40 KVA (DFO COMPLEX) complete all specified and as directed. | 1 | Each Set | |
98 | 98 | Replacement of Diesel pipes of DG Set 40 KVA (DFO COMPLEX) complete all specified and as directed. | 4 | Each | |
99 | 99 | Replacement of alternator control Panel board of DG Set 40 KVA (DFO COMPLEX) with wiring including MCCBs of suitable rating complete all specified and as directed. | 1 | Each Job | |
100 | 100 | Repair to canopy body of DG Set 40 KVA (DFO Complex) including replacement of glass, door hinges, cutting the rusted portion and provision of new cut pieces, necessary welding works, finishing work, one coat of red oxide and painting with approved synthetic enamel paint two coats complete all specified and as directed. | 1 | Each Job | |
101 | 101 | Material and labour for maintenance and servicing of DG Set DG Set 35 KVA (DFO COMPLEX) complete ‘B’ check by draining out the lubricant oil from the sump, open the top cover of the engine head complete, unscrewing of engine mounting such as exhaust manifold, Air cleaner, top cover of acquisetic enclosure, remove the cylinder head by unscrewing nuts, bolts washers etc. tappets valves etc. remove the dust, dirt from the main engine assembly. Check the serviceability of crank shaft assembly, Main bearing assembly, fuel nozzles complete and replacement of U/S accessories. Sending the tapet valves to workshop for lathe work. Calibration of fuel injector pump assembly and changing the worn out/ unserviceable spares, re-assembling, testing on full load complete up to the satisfaction of Engineer-in-Charge for DG Set of capacity 35 KVA at DFO Power house. \n\n Make of DG set is – Mahindra & Mahindra.\n\nNote:\n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr (ii) Fuel filter (iii) All standard spare parts required to replace the U/S spares to make the engine serviceable in all respects. \n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | 1 | Each Job | |
102 | 102 | Replacement of Radiator with connecting hoses of DG Set DG Set 35 KVA (DFO COMPLEX) complete all specified and as directed. | 1 | Each Set | |
103 | 103 | Replacement of Self Starter of DG Set DG Set 35 KVA (DFO COMPLEX) complete all specified and as directed. | 1 | Each | |
104 | 104 | Replacement of Water Pump and connected hoses of DG Set 40 KVA (DFO COMPLEX) complete all specified and as directed. | 1 | Each | |
105 | 105 | Replacement of Diesel pipes of DG Set DG Set 35 KVA (DFO COMPLEX) complete all specified and as directed. | 4 | Each | |
106 | 106 | Replacement of alternator control Panel board of DG Set 35 KVA (DFO COMPLEX) with wiring including MCCBs of suitable rating complete all specified and as directed. | 1 | Each Job | |
107 | 107 | Repair to canopy body of DG Set 35 KVA (DFO Complex)including replacement of glass, door hinges, cutting the rusted portion and provision of new cut pieces, necessary welding works, finishing work, one coat of red oxide and painting with approved synthetic enamel paint two coats complete all specified and as directed. | 1 | Each Job | |
108 | 108 | Material and labour for maintenance and servicing of DG Set 15 KVA (TS Pump House) complete ‘B’ check by draining out the lubricant oil from the sump, filling new engine oil, replacement of diesel and oil filter complete and testing on full load complete for DG Set of capacity 15 KVA at MES Pump house. \n\nMake of DG set is – Kirloskar\n\nNote :- \n(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of (i) Lub oil filtr (ii) Fuel filter \n(b) Cost of (iii) Lubricating oil (iv) coolant oil etc shall be measured and paid separately under relevent items. \n(c) Required T& P shall be arranged by the Contractor at site.\n(d) The DG Set shall be tested at full load up to 8 hours continuesly all as directed by Engr-in-charge. | 1 | Each Job | |
109 | 109 | Replacement of AVR of DG Set 15 KVA (TS Pump House)complete all specified and as directed. | 1 | Each | |
110 | 110 | Replacement of Water Pump and connected hoses of DG Set 15 KVA (DFO COMPLEX) complete all specified and as directed. | 1 | Each Set | |
111 | 111 | Servicing to control panel board with wiring of DG Set 15 KVA (TS Pump House) complete all specified and as directed. | 1 | Each Job | |
112 | 112 | Dismantling the radiater of 500 KVA DG Set at UAV Power house, removing all scales from the pipes by pressure washing and by using suitable solutions, checking for leakage, brazing works, finishing,drying and refixing , filling coolant and testing complete all specified and as directed. | 1 | Each Job | |
113 | 113 | Dismantling the radiater of 250 KVA DG Set at UAV Power house (New Logistic), removing all scales from the pipes by pressure washing and by using suitable cleaning solutions, checking for leakage, brazing works, finishing,drying and refixing , filling coolant and testing complete all specified and as directed. | 1 | Each Job | |
114 | 114 | Dismantling the radiater of 160 KVA DG Set at ATC Power house, removing all scales from the pipes by pressure washing and by using suitable cleaning solutions, checking for leakage, brazing works, finishing,drying and refixing, filling coolant and testing complete all specified and as directed. | 1 | Each Job | |
115 | 115 | Dismantling the radiater of 100 KVA DG Set at New Adm Block, removing all scales from the pipes by pressure washing and by using suitable cleaning solutions, checking for leakage, brazing works, finishing,drying and refixing, filling coolant and testing complete all specified and as directed. | 1 | Each Job | |
116 | 116 | Dismantling the radiater of 82.5 KVA DG Set at TS Power hose, removing all scales from the pipes by pressure washing and by using suitable cleaning solutions, checking for leakage, brazing works, finishing,drying and refixing, filling coolant and testing complete all specified and as directed. | 1 | Each Job | |
117 | 117 | Dismantling the radiater of 15 KVA DG Set at TS Pump hose, removing all scales from the pipes by pressure washing and by using suitable cleaning solutions, checking for leakage, brazing works, finishing,drying and refixing, filling coolant and testing complete all specified and as directed. | 1 | Each Job | |
118 | 118 | Supply and fix in replacement of Battery 12 Volt 180 AH complete all specified and as directed. | 2 | Each | |
119 | 119 | Supply and fix in replacement of Battery 12 Volt 120 AH complete all specified and as directed. | 2 | Each | |
120 | 120 | Supply and fix in replacement of Battery 12 Volt 90 AH complete all specified and as directed. | 2 | Each | |
121 | 121 | Supply and fix in replacement of Battery 12 Volt 40 AH complete all specified and as directed. | 1 | Each | |
122 | 122 | Supply and fixing Battery terminal heavy duty 1 mtr long standard copper cable with brass clamps, bolts, nuts, washers etc complete all specified and as directed. | 8 | Each | |
123 | 123 | Supply and fixing Battery terminal heavy duty 0.6 mtr long standard copper cable with brass clamps, bolts, nuts, washers etc. complete all specified and as directed. | 4 | Each | |
124 | 124 | Supply only Engine oil high quality suitable for DG set all as directed. | 300 | Litre | |
125 | 125 | Supply only Coolant oil heavy duty suitable for DG set all as directed. | 350 | Litre | |
126 | 126 | Material and labour for repair/servicing of Dynamo of 500 KVA DG Set at Ramnad complete all specified and as directed. | 1 | Each Job | |
127 | 127 | Material and labour for repair/servicing of Dynamo of 160/100 KVA DG Set at Ramnad complete all specified and as directed. | 2 | Each Job | |
128 | 128 | Material and labour for repair/servicing of Dynamo of 82.5 KVA DG Set at Ramnad complete all specified and as directed. | 1 | Each Job | |
129 | 129 | Material and labour for replacement of asbestose rope of standard size suitable for DG sets of any capacity complete all specified and as directed. | 80 | Running Metre | |
130 | 130 | Shifting of DG Set of capacity 82.5 KVA from DFO Power house to TS Power house by crane lifting and connecting LT Cables and earth strip complete all specified and as directed. | 1 | Each Job | |
131 | 131 | Material and labour for repairing canopy of DG Set 82.5 KVA (TS Power house) by cutting and removing the corroded canopy at top, all sides, bottom and door portions and supplying and fixing new sheets of existing gauge, brazing and finishing works,removing old paint with suitable means and scrappers and painting inside and outside of complete canopy body after with two coats of approved synthetic enamel paint over a coat of red oxide primer, replacement of all door hinges, replacement of all door gakerts complete all as specified and directed | 1 | Each Job | |
132 | 132 | Material and labour for Earthing complete with Galvanized steel earth plate electrode of size 600mmX600mm, 6.00 mm thick buried directly in ground vertically to a depth not less than 2.25 metres below the normal ground level with top edge of the plate not less than 1.5m below normal GL and connected to galvanized earth Lead wire 4.0mm dia by means of bolts, nuts, check nuts and washers of galvanized iron steel all as shown in Electrical Plate No.5 connecting to earthing test point, including necessary earth work in any type of soil, PCC earth chamber made in PCC 1:3:6 type C1 (using 20mm graded aggregate), common salt, charcoal, CI funnel, earth pit cover in RCC 1:2:4 type B1 (using 20mm graded aggregates), with 8mm CTD bars @ 100mm c/c in both ways, including necessary form work complete including necessry test on completion and taking down old earthing all as specified and as directed.\n \nNote : The unit rate shall also include for excavation, earth work in hard/dense soil PCC (1:3:6) type C1 pit, RCC cover slab, GI funnel with 40 mm dia watering pipe, wire mesh, 50mm dia light grade GI protection pipe for earth lead etc., complete. | 16 | Each | |
133 | 133 | SCHEDULE 'A' (PART-III- REPAIR TO (AC PLANT) | |||
134 | 134 | Dismantling the condensor/chiller motor of pumpset 3 HP for rewinding, servicing, greasing, oiling and testing complete the motor with suitable enamelled copper wire, varnishing, providing sleeves and insulating materials including repairing the defectrive spares and assembling and testing and refixing as per existing all as directed. | 2 | Each | |
135 | 135 | Dismantling the motor of Cooing tower pumpset 7.5 HP for rewinding, servicing, greasing, oiling and testing complete the motor with suitable enamelled copper wire, varnishing, providing sleeves and insulating materials including repairing the defectrive spares and assembling and testing and refixing as per existing all as directed. | 2 | Each | |
136 | 136 | Dismantling the AHU induction motor of capacity 10 HP for rewinding, servicing, greasing, oiling and testing complete the motor with suitable enamelled copper wire, varnishing, providing sleeves and insulating materials including repairing the defectrive spares and assembling and testing and refixing as per existing all as directed. | 1 | Each | |
137 | 137 | Descaling of condensor unit 26 TR (6 Nos) by circulating dilute hydrochloric acid solution and cleaning the tubes with wire brush by removing the side cover till the tubes are thoroughly cleaned and re-circulating the fresh water after fixing the side cover with necessary gasket and bolt and nuts for every 3 months all as directed. | 1 | Each Job | |
138 | 138 | Supply and fixing in repair 0 to 500 PSI Gauge complete all as specified and as directed. | 3 | Each | |
139 | 139 | Supply and fixing in repair MNX A1 Contact complete all as specified and as directed. | 1 | Each | |
140 | 140 | Supply only R22 Gas complete all as specified and as directed. | 30 | Kilogram | |
141 | 141 | Material and labour for Overhauling of Air handling unit -2 nos by dismantling , assembling and testing for the following parts. Maintenance of schedule every three months.\n\n(a) Inspect abbsolute filters, removing and cleaning by using vaccum cleaner and refix same.\n(b) Clean cooling coil,fins by using coastic soda and water pressure method and applying Grease for all motors, check and adjust belt tension if required, check condition of blower shaft, scroll, impeller and bearings, check tightness of all electrical terminations, clean water line strainers, check proper balancing system , check for noise and vibration. | 3 | Each Job | |
142 | 142 | Supply and fix in repair Strainer 80mm complete all as specified and as directed. | 1 | Each | |
143 | 143 | Supply and fix in repair PCB for towards chiller complete all as specified and as directed. | 1 | Each | |
144 | 144 | Supply and fix in repair sensor for Chiller and plant complete all as specified and as directed. | 2 | Each | |
145 | 145 | Material and Labour for Wiring of Electrical panel board complete with suitable size copper conductor of existing gauge including suitable thimbles all as specified and as directed | 1 | Each Job | |
146 | 146 | Supply and fix in repair thermal insulation cover with Aluminium cladding sheet for 80mm for covering chiller pipelines complete all as specified and as directed. | 1 | Each Job | |
147 | 147 | Material and Labour for Painting with two coat synthetic enamel paint on one coat Zinc Oxide primer for Chilled and Condenser water supply lines and entral type AC plant complete wide Chiller Unit compressor unit outer side complete all as directed. | 1 | Each Job | |
148 | 148 | Supply and fix in repair Butter fly valve 80 mm with all necessary fixing arrangements including removing of old unserviceable all as directed.\n\n Make: CRI / Zoloto/ Kriloskar | 2 | Each | |
149 | 149 | Supply and fix in repair MS pipe 80 mm with all necessary fixing arrangements including removing of old rusted pipe all as directed | 12 | Running Metre | |
150 | 150 | Material and Labour for Painting of cooling tower inner side and outer side and connected pipe lies of any size, pump sets of any capacity, compressor units, Electrical panel boars complete after scrapping the existing paint by suitable means and scrappers, two coating of approved colour of synthetic enamel paint over one coat of red oxide complete all as specified and as directed. | 1 | Each Job | |
151 | 151 | Material and Labour for checking, Servicing, cleaning, testing ,scrapping the existing paint by suitable means and scrappers, painting complete with two coating of approved colour of synthetic enamel paint over one coat of red oxide for De humidifiers and connected pipe lines of any size complete all as specified and as directed. | 1 | Each Job | |
152 | 152 | Replacement of PVC honey comb fills(drift eliminators) suitable size for Central type AC Plant all as directed. | 1 | Each Job | |
153 | 153 | Cleaning of GI ducts and louvers inside and outside in every three months by using vacuum cleaner and blowers and ensure that no unwanted particles,dust, dirt are accumulated inside GI ducts and louvers all as specified and directed. | 3 | Each Job | |
154 | Total in Figures |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail