Water Resources Department-WRD has published Development Of Tourism Infrastructure At Harabhangi Dam In Gajapati District . ( Construction Of Toilet Block ) Devlopment Of Tourism Infrastructure. Submission Date for this Tender is 25-10-2019. Toilet Bathroom Tenders in Adava Odisha. Bidders can get complete Tender details and download the document.
Name of Work : Development of Tourism infrastructure at Harabhangi Dam in Gajapati District.(Construction of Toilet Block). | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work excavation in foundation hard soil including moorum, stoney earth mixed with boulders with all leads and lifts including dressing and levelling the bed and depositing the excavated earth away from the work site with all leads and lifts including cost of all labour and T&P and cess required for the work and etc. complete in all respect but excluding GST and as per the direction by the Engineer-in-charge. | BI01010001010000000000000515BI0100001113 | 111.45 | One cum |
2 | 2 | Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required for the work labour with T&P and cess etc. complete in all respect but excluding GST as per specification and direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001114 | 17.7 | One cum |
3 | 3 | Providing cement concrete (1:3:6) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming ,vibrating ,watering and curing etc.complete including cost, conveyance, royalty all taxes as applicable excluding GST of all the materials required for the work, with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge | 15.9 | One cum | |
4 | 4 | Reinforced Cement concrete (1:1.5:3) with using 12mm crusher broken hard granite coarse aggregate of approved quality free from weathered skin surface and any other deleterious materials, uniform colour and texture including dewatering, cost, conveyance, royalty, tool & plant, including cost of shuttering, finished smooth to all heights including casting with all lead, lifts, delifts, watering and curing etc. complete with all labour for mixing by concrete mixture, placing in position by manually and compacting with vibrators etc. complete including hire and running charges of all machineries, labour charges, T&P and Workers Welfare Cess etc. complete but excluding GST of all the materials and as per approved drawing, specification and direction of Engineer-in-Charge. | 12.52 | One cum | |
5 | 5 | Supplying, straightening, cutting, bending, binding, tying with binding wire 18 to 20 SWG, fitting and placing in position uncoated HYSD bar reinforcement of different sizes complete as per drawing and technical specification with all laps, hooks, ties etc. with all leads, lifts & delifts including cost, conveyance, taxes etc. of all materials, all labour charges, T&P and Workers Welfare Cess etc. complete, but excluding GST as directed by the Engineer-in-charge. | 10.5 | One Qntl | |
6 | 6 | Providing rigid and smooth centering and shuttering for R.C.C. works including false work, dismentaling and finishing them after casting including cost, conveyance, Workers Welfare cess, as applicable and T&P with all labour & materials etc complete, but excluding GST and as per approved drawing, design, specification and direction of the Engineer in charge (Column bases below NSL and gread beam) | 30.5 | One Sqm | |
7 | 7 | Beam and column above plinth | 38 | One Sqm | |
8 | 8 | Lintel | 6.3 | One Sqm | |
9 | 9 | Chaja & Slab | 81.2 | One Sqm | |
10 | 10 | Fly Ash brick masonry in cement mortar (1:6) using fly ash bricks of 23 x 11 x 8 cm size in foundation and plinth having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royality and taxes of all materials with all labour,labour cess and T & P required for the work complete in all respect but excluding GST and as per direction of Engineer-in-Charge. | 25.1 | One Cum | |
11 | 11 | Fly Ash brick masonry in cement mortar (1:6) using fly ash bricks of 23 x 11 x 8 cm size in superstructure having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royality and taxes of all materials with all labour,labour cess and T & P required for the work complete in all respect but excluding GST and as per direction of Engineer-in-Charge | 14.5 | One Cum | |
12 | 12 | Cement plaster 16 mm thick in C.M (1:6) to brick work finished smooth including watering curing for the required period and scaffolding with cost, conveyance, royalty, including all taxes as applicable but excluding GST of all the materials required for the work, with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 220.5 | One Sqm | |
13 | 13 | Cement concrete (1:2:4) with using 12mm crusher broken hard granite coarse aggregate of approved quality free from weathered skin surface and any other deleterious materials, uniform colour and texture including dewatering, cost, conveyance, royalty , tool & plant and , Workers Welfare Cess including cost of shuttering, finished smooth to all heights including casting with all lead, lifts, delifts, watering and curing etc. complete with all labour for mixing by concrete mixture, placing in position by manually and compacting with vibrators etc. complete including hire and running charges of all machineries, etc. complete but excluding GST and as per approved drawing specification and direction of Engineer-in-Charge | 1.2 | One Cum | |
14 | 14 | Supplying, filling, spreading stone boulders of size 15cm to 30cm (Other than granite) in recharge pit in required thicknes including all cost, conveyance, taxes of all materials, cost of all labour, labourcess, all T&P etc. required for the work complete in all respect but excluding GST and as per the direction of the Engineer-in-charge. | 26.7 | One Cum | |
15 | 15 | Supplying, fitting & fixing glazed ceramic tiles in floor of size 600 mm x 600mm of approved make conforming to IS: 15622 laid on 20mm thick cement mortar (1:4) & filling joints with cement (white) of approved quality including cost, carriage, T&P, and Workers Welfare Cess required with all lead, lift and delifts etc complete but excluding GST and as per direction of the Engineer in charge. | 26 | One Sqm | |
16 | 16 | Supplying, fitting & fixing glazed ceramic wall tiles of approved make conforming to IS: 15622 (thicknees to be specified by the manufacturer ) of approved make in all colour with cement (white) of approved quality including cost, carriage, T&P, and Workers Welfare Cess required with all lead, lift and delifts etc complete but excluding GST and as per direction of the Engineer in charge. | 71.4 | One Sqm | |
17 | 17 | . Distempering two coats to wall with distemper of approved shade on new work to give an even shade including cost of distemper & including cost, conveyance, royalty, with all lead, lift & delift to the work site including all labour charges, T&P and Workers Welfare Cess etc complete but excluding GST and as directed by the Engineer in charge. | 67.5 | One Sqm | |
18 | 18 | Finishing walls with water proofing cement paint (Weather coat) of approved shade on new work two coats, to give an even shade with cost, conveyance, taxes of all the materials required for the work and labour, T&P and cess etc. complete but excluding GST and in all respect as per specification and direction of the Engineer-in-charge. | 79.2 | One Sqm | |
19 | 19 | Supplying, fitting and fixing factory made 25mm thick PVC Panelled door/window shutter with PVC Frame etc complete of ISI Standard (Structural requirement profiles are to be got approved by the Engineer-in-charge before fitting) with all cost, conveyance, including all taxes as applicable but excluding GST of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 5.94 | One Sqm | |
20 | 20 | Supply for fiting, fixing of M.S. grills in door, window & ventilators including all cost conveyance, taxes of all materials (excluding GST) and labour , T&P and cess, required for the work and Workers Welfare Cess etc complete in all respect with all leads, lifts and delifts etc complete as per direction of the Engineer in charge. | 90.06 | One Kg |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail