Public Health Engineering Department-PHED has published Construction Of 2 . 00 Lac Gallons Capacity Additional Rcc Backwash Tank At 20Mgd Water Treatment Plant Rangil ( Under Languishing Programme ) As On Tender Doc. Submission Date for this Tender is 21-10-2019. Water Treatment Plant Tenders in 20MGD WTP Rangil Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: CONSTRUCTION OF 2.00 LAC GALLONS CAPACITY ADDITIOANL R.C.C. BACKWASH TANK AT 20MGD WATER TREATMENT PLANT RANGIL (UNDER LANGUISHING PROGRAMME). | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5Mtr. in width) and for shafts, wells, cesspits and the like not exceeding 10Sqm on plan, depth upto 1.5Mtr. Including disposal of excavated earth upto 1Mtr. from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil. | BI01010001010000000000000515BI0100001122 | 1565.8 | Cum |
2 | 2 | Disposal of surplus excavated sol from SR premises to sumping site by mechanical transport including loading, unloading avg.lead 1000Mtrs. | BI01010001010000000000000515BI0100001123 | 1565.8 | Cum |
3 | 3 | Providing and laying dry stone soling in foundation trenches hand packed and consolidated by hand ramming (Quarry).\n | BI01010001010000000000000515BI0100001124 | 71.21 | Cum |
4 | 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level.\n1:4:8 (1 Cement : 4 Coarse sand : 8 Graded Stone aggregate 40mm nominal size) Crushed.\n | BI01010001010000000000000515BI0100001125 | 35.6 | Cum |
5 | 5 | Centring and shuttering including strutting, propping etc. and removal of form for: | BI01010001010000000000000515BI010000126 | ||
6 | 5.1 | i. Walls (any thickness) including attached pilasters, butteress, plinth and string courses etc.\n | BI01010001010000000000000515BI0100001127 | 656.82 | Sqm |
7 | 5.2 | ii. Suspended floors, roofs, landings, balconies and access platform RCC Slab. | BI01010001010000000000000515BI0100001128 | 288 | Sqm |
8 | 5.3 | iii. Lintels, beams, plinth beams, grinders, bressumers and cantilevers beams. | BI01010001010000000000000515BI0100001129 | 150.29 | Sqm |
9 | 5.4 | iv. Columns, Pillars, Piers, Abutments, Posts and Struts, Columns. | BI01010001010000000000000515BI0100001130 | 288.9 | Sqm |
10 | 5.5 | v. Stairs (excluding landings) except spiral staircases. | BI01010001010000000000000515BI0100001131 | 16.42 | Sqm |
11 | 5.6 | vi. Domes, arches, valuts upto 6Mtr. span. | BI01010001010000000000000515BI0100001132 | 42 | Sqm |
12 | 6 | Providing and laying in position machine batches, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centering, shuttering, finishing and reinforcement, including admixture in recommended proportions (as per IS 9103) to accelerate, rated setting of concrete improve workability without imparing strength and durability as per direction of Engineer-in-Charge M-20 grade reinforced cement concrete. | BI01010001010000000000000515BI010000133 | ||
13 | 6.1 | i. All work upto plinth level. | BI01010001010000000000000515BI0100001134 | 89.01 | Cum |
14 | 6.2 | ii. All work from plinth level upto floor V level (Walls, Columns, Pillars, Posts and Struts and Domes). | BI01010001010000000000000515BI0100001135 | 159.3 | Cum |
15 | 7 | Add or deduct for providing richer or leaner mixes respectively at all floor levels. | BI01010001010000000000000515BI010000136 | ||
16 | 7.1 | i. Providing M-25 grade RCC instead of M-20 grade RCC for Raft and Walls only. | BI01010001010000000000000515BI0100001137 | 244.11 | Cum |
17 | 8 | Reinforces cement concrete work in beams, suspended floors, roof having slope upto 150 landings, balconies, shelves, chajjas, lintels, bands, plain window aills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 Cement : 2 Coarse Sand : 4 Graded Stone aggregate 20mm nominal size). | BI01010001010000000000000515BI0100001138 | 62.95 | Cum |
18 | 9 | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Hot rolled deformed bars. | BI01010001010000000000000515BI0100001139 | 30995 | Kg |
19 | 10 | Providing and laying P.G.I. Sheet 24 guage 20mm at Joints Walls. | BI01010001010000000000000515BI0100001140 | 306.4 | RM |
20 | 11 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1:4 (1 Cement : 4 Fine Sand). | BI01010001010000000000000515BI0100001141 | 1601.36 | Sqm |
21 | 12 | Providing of water proofing compound in RCC work @1Kg. per bag of cement. | BI01010001010000000000000515BI0100001142 | 2025 | Kg |
22 | 13 | Providing and fixing of 250mm dia MS flanges 12mm thick with all accessories. i.e. nuts, bolts, washers, RI Cloth etc. complete. | BI01010001010000000000000515BI0100001143 | 3 | Pair |
23 | 14 | Providing and fixing of 50mm dia GI bends in RCC slab complete.\ni. 50mm dia GI bend.\n | BI01010001010000000000000515BI0100001144 | 10 | No |
24 | 15 | Providing and laying of stone on horizontal level behind walls. | BI01010001010000000000000515BI0100001145 | 122.85 | Cum |
25 | 16 | Steel work welded in built up sections / framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. \ni. In gratings, frames, guard bar, ladders, railings, brackets, gates & similar works.\n | BI01010001010000000000000515BI0100001146 | 74.69 | Kg |
26 | 17 | Providing and fixing of MS bright finished railing for stair including balusters etc. complete job. | BI01010001010000000000000515BI0100001147 | 15 | Mtr |
27 | 18 | Carriage of materials by mechanical transport from different source to actual site of work. | BI01010001010000000000000515BI010000148 | ||
28 | 18.1 | i. Aggregate from Ganderbal avg lead 15Kms. | BI01010001010000000000000515BI0100001149 | 311 | Cum |
29 | 18.2 | ii. Carriage of stone soling and stones from Athwajan avg. lead 25Kms. | BI01010001010000000000000515BI0100001150 | 194.06 | Cum |
30 | 18.3 | iii. Sand from Ganderbal avg. lead 15Kms. | BI01010001010000000000000515BI0100001151 | 189.61 | Cum |