Procurement Of Complete Assembly Of Bfp Complete Assembly Of Bfp
Tender Overview
Project Description
Procurement Of Complete Assembly Of Bfp Complete Assembly Of Bfp , Complete Assembly Of Bfp Cartridge:Complete Assembly Of Bfp Cartridge ( Fitted With De/Nde Mech Seal , Stuffing Box , Thrust Bearing , Journal Bearing , Coupling Between Hydraulic Coupling To Pump ) Specification Of BfpBoiler Feed Pump Type : Fk6d30Suction Temp: 160 Deg . CDynamic Head : 1960 MlcNo . Of Stages: 6Direction Of Rotation: Anti - Clockwise ( As Viewed From Drive End ) Design Flow : 492 M3/HrMini R/C Flow: 130 T/HrFficiency: 81%Speed: 5045RpmThe Bfp Cartridge Should Be Interchangeable With The Bfp Of 7 And 8 . Units Of Cpp , Nalco , Angul ( Pump . Sl . No . P2000-049 , P2000-50 , P2001 . 011 , P20001 . 012 )
BOQ
| Name of Work: PROCUREMENT OF COMPLETE ASSEMBLY OF BFP CARTRIDGE | ||||
|---|---|---|---|---|
| Item Description | Item Code / Make | Quantity | Units | |
| 1 | COMPLETE ASSEMBLY OF BFP CARTRIDGE:\n\nCOMPLETE ASSEMBLY OF BFP CARTRIDGE (fitted with DE/NDE mech seal,stuffing box,thrust bearing ,journal bearing, coupling Between hydraulic coupling to pump)\nSPECIFICATION OF BFP\nBOILER FEED PUMP TYPE : FK6D30\nSUCTION TEMP: 160 deg.C\nDYNAMIC HEAD : 1960 mlc\nNO. OF STAGES: 6\nDIRECTION OF ROTATION: ANTI - CLOCKWISE\n (AS VIEWED FROM DRIVE END)\nDESIGN FLOW : 492 M3/HR\nMINI R/C FLOW: 130 T/HR\nFFICIENCY: 81%\nSPEED: 5045RPM\nTHE BFP CARTRIDGE should be interchangeable with the BFP of 7 and 8. Units of CPP, NALCO,ANGUL(Pump.Sl. No.P2000-049,\nP2000-50,P2001.011,P20001.012) | 30401000009 | 1 | EA |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed